OPEN-ENDED DESIGNER AGREEMENTSThe University of North Carolina at Chapel Hill
Fall 2020
AGENDA▪ Organizational Structure
▪ Overview of Contracting Method
▪ Process
AVCAnna Wu, FAIA
Exec Director Planning & DesignEvan Yassky, AIA
Exec DirectorEng & Construction
Greg Driver, PE
Exec DirectorOperations
Darius Dixon
Exec DirectorAdministrative Svcs
Robyn Narvesen
ORGANIZATION STRUCTUREFACILITIES SERVICES
Executive AdministratorLynn Friend
Exec DirectorEvan Yassky, AIA
Asst Director Design
Joe Ockert, RA
Architect Chris Bozzelli
Architectural TechnicianReggie Stewart
Architect Andrea Janusz
Asst DirectorInteriors
Cheryl Leguillow, NCIDQ, AUID
DesignerLeslie Vollbrecht
DesignerPowell Marshall
DesignerBailey Gatens
Historic PropertyAnne Douglas
Asst DirectorPlanning
Nathan Harms, AIA
PlannersJill Coleman
Tari Maynor-BradyJoe Fenton Rick Lutz
Steve McGarry Michael Pierce
DirectorFacilities Technology
Abbas Piran
Plan RoomSu Song
Facilities Condition Assessment Program
(FCAP)
AdministratorWendie Morris
Exec DirectorGreg Driver, PE
Asst Director Energy Management
Cindy Register, PE
Energy EngineerGeorge Jacobs, PE
Senior Commissioning
Rod Rabold
Energy EngineerObadele St. George
Data AnalystJessica O’Hara
Asst DirectorFacilities Engineering
Cindy Register, PE
Senior ElectricalJeannie Smith, PE
Senior MechanicalJoe Magura, PE
Mechanical EngineerBen Johnson, HBDP
Electrical DesignerBilly Vierra
Electrical DesignerBilly Vierra
BSL3 – DCM Engineer Vacant
HUB CoordinatorTanya Vogel
DirectorConstruction Mngmt
Sid Stone
Construct ManagerMike Lloyd
Construct ManagerGeorge Kirschmann
Construct ManagerErrol Simon
Formal CM’s Kyle Coble Chris Glenn
Gaston EubanksKeith Snead
Joel Witherow
DirectorConstruction Shops
Ken Vogel
Supervisors
AdministratorMary Boyer
OTHER KEY PLAYERS (PARTIAL)From Facilities
▪ ADA
▪ Building Services▪ Life Safety▪ HVAC Services▪ Electrical Services▪ Plumbing Services▪ Exteriors / Roofing▪ Grounds
▪ Controls & Commissioning
Outside Facilities
▪ EHS
▪ ITS
▪ Energy Services
▪ Transportation & Parking
▪ Buildings & Grounds Committee
▪ User Group
OVERVIEW OF OEDACONTRACTING METHOD
Abatement Arc Flash Architecture Audio Visual Civil
Cx Envelope Cx MEP Electrical Interiors Lab Planning
Landscape Architecture
Land Surveying
Lighting Design Mechanical Roofing
Structural Vivarium Design
DISCIPLINES
OVERVIEW OF CONTRACTING METHOD▪ Submit OEDA application online
▪ Discipline committees review applications and select firms
▪ Execute the Open-Ended Designer Agreement contract▪ One year with option to extend for one additional year
▪ When a project is initiated, execute an Authorization to Proceed (ATP)
▪ Contract Structure▪ Prime consultant
▪ Subconsultant
▪ Hybrid: In-House Architect with OEDA Engineer
SCOPE OF SERVICES(PARTIAL)• ATP (Authorization to Proceed)
• Design• Field verification of existing drawings
• We will assist you on site!• Provide meeting minutes• Incorporate review comments• Estimate probable construction cost
• Bidding Phase & Front End Options• Administered by University• Administered by Designer
• Construction Administration• Lead weekly site visits• Provide field reports• Punchlist and reinspection
• Close-out
The Intent of the Project:The intent of this project is Click here to enter text.
Scope of Services:The scope of your work for this project is as described in your proposal dated Click here to enter a date., which shall include at a minimum:Design Phase:•Inspect each building for the purpose of determining the scope of work required. •If applicable, survey the building to determine whether the number of existing plumbing fixtures complies with the applicable building code requirements.•Consult with Choose an item. to confirm project requirements.•Develop alternative designs for achieving the intent of this project, and assist the University in selecting the most suitable approach. Meet with representatives of Facilities Services, the user group, and other concerned parties as often as required.•Prepare a preliminary design.•Review the proposed design solution with a representative of the State Construction Office and obtain a preliminary approval to proceed.•Prepare construction drawings, technical specifications and bid documents and forms suitable for informal bidding and/or execution by in-house construction shops.•The University will handle asbestos abatement (if required) separately.•Prepare drawings conforming to UNC Chapel Hill Drawing Standards.•Edit UNC Chapel Hill’s standard “Supplementary Conditions for Informal Projects”.•Estimate the probable construction cost.•Submit 3 copies of substantially complete CD’s for internal review.•Incorporate all review comments into a final submittal.•Submit plotted originals plus full-size copies of the final construction drawings and one unbound original of the project technical specifications and bid documents, per the “UNC Design and Construction Services AutoCAD Standards and Document Delivery.”
Construction Phase•Administer the advertisement of bids for this project and distribute documents to interested bidders.•Conduct a Pre-Bid Conference and assist bidders with clarifications to the drawings.•Bidding and contract award will be undertaken by the University and should not be included in the Consultant’s scope of services.•Administer the opening and tabulation of bids and recommend contract award.•Prepare the construction contracts required for this project and facilitate their execution.•Attend and administer the pre-construction conference.•Review and approve any shop drawings and submittals that are required for the project.•Designer along with consultants shall visit the site as often as required to ensure compliance with plans and specifications but at a minimum once per week.•Review and approve contractor’s applications for payment and other construction-related documents.•Coordinate and conduct a punch list final inspection.•Administer project closeout procedures.•Prepare As-Built Drawings per the “UNC Design and Construction Services AutoCAD Drawing and Project Standards.”
PROJECT TYPES
Classroom/Office Renovations Feasibility Studies Labs &
Makerspaces
Façade & Waterproofing
Repairs
Fall Protection Roof Replacement
Ventilation Improvements /
Fume Hood Installation
Parking Deck Repairs
2021 OEDA PROCESS▪ Submit application online (multiple disciplines at once)
https://go.unc.edu/unc-oed▪ NLT 5PM on November 19, 2020
▪ Example projects▪ SF-330
▪ UNC will execute OEDA contracts by end of 2020
▪ Kick-off meeting with more in-depth information early 2021