OPAL-RT RT14 Conference: System Integation

12
The 7th International Conference on Real-Time Simulation Technologies Montreal | 9-12 June, 2014 1 Alexandre Leboeuf OPAL-RT TECHNOLOGIES INC. [email protected] Systems Integration Turn-key Solutions for All Your Needs

description

Systems Integration: Turn-key Solutions for All Your Needs, by OPAL-RT

Transcript of OPAL-RT RT14 Conference: System Integation

Page 1: OPAL-RT RT14 Conference: System Integation

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

1

Alexandre LeboeufOPAL-RT TECHNOLOGIES INC.

[email protected]

Systems IntegrationTurn-key Solutions for All Your Needs

Page 2: OPAL-RT RT14 Conference: System Integation

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

2

• Systems Integration 2 mino Team Introduction

• Hands-on Demonstration 5 mino HIL System and ECU Testing with Fault-insertion unit

• Service Offered 3 mino Tests & Validation Solutions (2 min)

o Benefits & Features (2 min)

• Q & A 5 min

WORKSHOPS & DEMONSTRATIONS

Page 3: OPAL-RT RT14 Conference: System Integation

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

3

• Team specifically dedicated to provide turnkey Tests & Validation solutions.

• Official creation March 2012, ISO 9001:2008 certification

Systems Integration Team

Page 4: OPAL-RT RT14 Conference: System Integation

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

4

Some of Our Customers

Page 5: OPAL-RT RT14 Conference: System Integation

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

5

HIL System - ECU Testing with Fault-Insertion Unit (FIU)

Realised by Pascal Feiter-Murphy

Hands-on Demonstration

Page 6: OPAL-RT RT14 Conference: System Integation

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

6

• Purpose:• Test the controller (ECU, BMS, FADEC, etc.), relay,

electric drive, etc.

• Test in a safe manner the 85+ % of lines of code that manage the exceptions the UUT will see through its use by creating those exceptions on purpose.

• Size does not matter! Remember Murphy’s Law.

Tests & Validation Solutions

Page 7: OPAL-RT RT14 Conference: System Integation

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

7

Some Examples Delivered

EPIC center HYPERSIM U. North Carolina Charlotte

Westport Diesel engine ECU

Aerospace Military CustomerIntegrated Vehicle Health Management

Liebherr ToulouseAir management System

Major USA aerospace companyOPAL-RT is the preferred supplier for all Auxiliary Power Unit test bench

Page 8: OPAL-RT RT14 Conference: System Integation

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

8

• We control the full business chain:• Systems Integration team has a direct influence on HW/SW designs in accordance with real

customer requirements.

• Overheads are limited with in-house products and procurement.

• Support is handled directly by OPAL-RT.

• Open architecture permitting easy interface with existing simulation solutions.

• Modular design provides the means to expand the system with controlled cost.

• HW/SW for power electronics simulation as a backbone to propel test bench designs. (MEA, Hybrid vehicules, BMS, etc. are inline with main business unit.)

• Simplified project management provides complex system delivery in short time frames. (Typically 12 to 18 weeks.)

Benefits & Features

Page 9: OPAL-RT RT14 Conference: System Integation

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

9

Ideal 12-week Project Schedule• Based on the aerospace

project management model.

• Adapted to retain critical milestones while adding more flexibility.

• Defines a clear design to delivery timeline that is typically between 12 to 18 weeks from PO to shipping.

• Involves the customer at each step.

• Certified ISO 9001:2008 since 2012.

Page 10: OPAL-RT RT14 Conference: System Integation

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

10

• OPAL-RT offers turnkey tests and validation solutions that are ISO certified.

• Importance of tests and validation solution to test what matters most before it is too late.

• Demo and examples.

• Benefits: OPAL-RT manages the full business chain.

• Simplified project management that works!

Conclusion

Page 11: OPAL-RT RT14 Conference: System Integation

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

11

Q & A

Page 12: OPAL-RT RT14 Conference: System Integation

The 7th International Conferenceon Real-Time Simulation TechnologiesMontreal | 9-12 June, 2014

12

Thank you!