ONP Development Engineering Value Management · Management ONP Management Company Presentation 10...

15
ONP Management 1 ONP Management Company Presentation ONP Management Development Engineering Value ONP Management Company Presentation

Transcript of ONP Development Engineering Value Management · Management ONP Management Company Presentation 10...

ONPManagement 1ONP Management Company Presentation

ONPManagement

Development

Engineering

Value

ONP ManagementCompany Presentation

ONPManagement 2ONP Management Company Presentation

Our Mission

ˮWe are committed to fully support

the vision and technical innovation

of offshore windˮ

ONPManagement 3ONP Management Company Presentation

ONP Management GmbH

• Founded in 2014

• Employees: 28

• Technical advisory office focusing on offshore wind

• Involved in development & construction of offshore wind projects around the globe

• All our senior experts have extensive experience in offshore wind

• Headquarter: Hamburg (Germany)

• Shareholders: Zech Group, Bremen (70%), Managing Partners (30%)

Employees: >9.300

Turnover: € 2.13 Bn (2016)

Introduction

ONPManagement 4ONP Management Company Presentation

Position in the Major Shareholder Organization

ONPManagement 5ONP Management Company Presentation

Portfolio

ONPManagement 6ONP Management Company Presentation

Tender &Contract Management

Support ServicesCapabilities and Staff Experience

Project Development

Owner's Engineer & Lenders' Technical

Advisor

Design Management

Ex

per

ien

ces

Sco

pe

Pa

cka

ge

FEW Baltic II 350 MW (PL)

Merkur 396 MW

Gode Wind I 332 MW

Bork.Riffg. II 450 MW

Haixia 600 MW (TW)

Baltic II 288 MW

Hohe See 497 MW

Merkur 396 MW

Albatros 112 MW

• Owner's engineer

• Technical due diligence

• Lenders technical advisor

• Investor relations &

preparation of FID

• Project information

memorandum (PIM)

• Design management

• Engineering management

• Certification management

• Employers requirements

• Contracting strategy

• Contract packages

• Tendering/evaluation

• Contract management

• Package management

Global Tech 1 400 MW

Baltic II 288 MW

Hohe See 497 MW

Merkur 396 MW

Albatros 112 MW

• Feasibility studies

• Permit management

• Grid connection

• Port assessments

• Development concepts

• Logistic concepts

• Concept design/design basis

Baltic II 288 MW

FEW Baltic II 350MW (PL)

Arcadis Ost 1 350 MW

Merkur 396 MW

Chu Feng 450 MW (TW)

Haixia 600 MW (TW)

ONPManagement 7ONP Management Company Presentation

RiskManagement

O&M Concept Development

ConstructionManagement

Ex

per

ien

ces

Sco

pe

Pa

cka

ge

Baltic II 288 MW

Merkur 396 MW

Nordseehotel © (offshore wind

accommodation platform)

R&D projects OWS-MV

• O&M concept development &

implementation

• Life-cyle cost analysis

• CAPEX-OPEX modelling

• O&M software simulation

• RDS-PP for offshore wind

• Document management

• Foundation fabrication

• Fabrication supervision &

reporting, QA/QC

• FAT, HAT, SAT

• Package management T&I

• Foundation installation

• Turbine installation

Global Tech 1 400 MW

Baltic II 288 MW

Nordsee One 332 MW

Merkur 396 MW

• Risk assessments

• FMECA

• Contract & claim

Management

• Technical expert in court

• Quality management

Global Tech 1 400 MW

Baltic II 288 MW

Gode Wind 1 332 MW

Merkur 396 MW

Bork.Riffg. II 450 MW

Nordsee One 332 MW

Port Development

• Port assessments

• Development concepts

• Logistic concepts

• Engineering & design

• Port improvement measures

• Construction management

• Quality management

• ABLE Marine Energy Park

(UK)

Bremerhaven (GER)

Świnoujście (PL)

Cuxhaven (GER)

Support ServicesCapabilities and Staff Experience

ONPManagement 8ONP Management Company Presentation

Project Name ONP Scope of Work ClientCapacity(MW)

Type ofFound.

Country Year

Haixia Owner's engineer, development TGP 600 MP/JKT Taiwan2017-ongoing

Borkum Riffgrund 2Technical due diligence & lenders' technical advisor

Talanx 450MonopileSB-Jacket

Germany2017-ongoing

OWF Albatros Design management & foundation engineering

GeoSea 117 Monopile Germany2017-ongoing

EnBW Hohe SeeDesign management & foundation engineering

GeoSea 500 Monopile Germany2016-ongoing

Kriegers Flak Bid preparation for auction Utility 600 n/a Denmark 2016

Merkur Offshore Client rep., set-up of SPV, PM untilFC, BoP package management

SPV 400 Monopile Germany2015-ongoing

FEW Baltic II Owner's engineer, feasibility studies, development services, IR

BTI 350 tbd Poland2015-ongoing

Nordsee OneClient representative foundationfabrication

Innogy/ NPI

332 Monopile Germany2015-2016

Gode Wind 1 Technical due diligence & Lenders' technical advisor

Talanx 330 Monopile Germany2015-2025

NobelwindTechnical advisory & construction services

Jan de Nul

165 Monopile Belgium 2015

Borssele I+II Bid preparation for auction Utility 700 n/a Netherlands 2015

ReferencesProject Selection

ONPManagement 9ONP Management Company Presentation

Scope of Work - Lenders' Technical Advisor

• Key data

German Bight/North Sea, 330 MW

55 Siemens turbines SWT-6.0-154 , 6 MW class

Monopile foundations

Project duration ONP 2015-2025

• Talanx coordinates a structured bond of EUR 556 mn with 5 institutional partners

• Bond finances Global Infrastructure Partners' fifty percent acquisition of Ørsted's Gode Wind 1 offshore wind farm; bond maturity = 10 years

• Talanx' new role: For the first time a group of institutional investors led by an insurer has financed an offshore wind power project

• Institutional consortium with following 5 main partners (Lenders Group):

Talanx Asset Management GmbH

Signal Iduna Asset Management GmbH

Versicherungskammer Bayern

Gothaer Krankenversicherung AG

Metzler Investment GmbH

• Follow-up contract awarded for OWF Borkum Riffgrund II (450 MW, debt financing 1,031 bn US $)

Project Reference - OWF Gode Wind 1Client - Talanx Asset Management GmbH + Lenders Group

© source all: Ørsted

ONPManagement 10ONP Management Company Presentation

Project Reference - OWF MerkurClient - Merkur Offshore GmbH

Scope of Work - Project Development, Interface, Package Management

• Key data

German Bight/North Sea, 396 MW

66 x GE-Haliade 150-6 MW

Water depths between 26.6 and 33.1 meters

66 x monopiles Ø 7.6 and 7.8 m, 700 t - 970 t

• Responsibility

Leading role in set-up and coordination of SPV assembly

Securing of building permit and grid access

Liaising debt financing

Management of design- and certification process (tower & foundation)

Contract management for EPCI and TSA-agreements, package management for construction phase (foundation, substation, installation logistics) and WTG package support

Project interface management and quality assurance

• Challenges

GE's first large offshore WTG supply contract

Untypical project organization (EPC contractor & OEM in the developer role)

Tight timeline to meet grid access requirements

© source: BSH

© source: Hydrotechnik Lübeck GmbH

ONPManagement 11ONP Management Company Presentation

Staff ExperienceOffshore Wind United States

OWF Block Island - Deepwater Wind

• Key data

United States, 30 MW

5 x GE-Haliade 150-6 MW

290 mUSD

Jacket foundations

• Scope of work

Technical expert, witness for

WTG installation

WTG commissioning

• Challenges

First offshore wind farm in the United States

2nd overall OWF featuring GE-Haliade 150-6MW wind turbines

Due to “Jones Act” no US port was entered for mobilization or take over of equipment

Nacelle spreader and blade yoke were taken to site by feeder barges

• Key Learnings (2016)

A variety of installation details where identified which are subject to procedural, logistical and technical optimization for the installation of 66 Haliade WTGs in the 396 MW OWF Merkur (Germany)

OWF Block Island

© source all: Deepwater Wind

ONPManagement 12ONP Management Company Presentation

Staff ExperienceOffshore Wind United States

OWF Cape Wind - Cape Wind Associates, LLC

• Key data

United States, 364 MW

101 x SWT-3.6-107

Water depths 4-17 m

Monopile foundations, design by Ramboll & Keystone

PCA signed with Client (Project implementation finally ceased)

• Scope of work

Preparation for supply and construction of

Foundations, transition pieces, cabling (inner-array and export) and full scope BoP (incl. ESP and onshore works)

Logistics concepts, scheduling, work preparation, interface management concept

Tendering (all relevant contract negotiations finalized (implementation status))

• Project partners

Flatiron Construction Corp. (HOCHTIEF Group)

Cal Dive International Inc.

Cashman Dredging & Marine Contracting Co., LLC• Key Learnings (2010-2012)

Strong involvement in local US project development

Familiarization with local supply chain, project partners, regulations and authorities

ONPManagement 13ONP Management Company Presentation

Staff ExperienceOffshore Wind United States

MassCEC Port Assessment

• Preparation for Participation in RFP

Massachusetts Clean Energy Center (“MassCEC”)

Request for proposal (Nov 2016)

• Topic

Ports and infrastructure assessment

• Scope

Assessment of waterfront sites (identification and suitability for Offshore Wind projects) and development of Employer's Requirements(definition of evaluation criteria and methodology)

Engineering and cost analysis

Report & recommendations

• Envisaged US Partners

Simpson Gumpertz & Heger

Keystone Engineering Inc.

Cashman Equipment Corp.

ONPManagement 14ONP Management Company Presentation

Staff ExperienceOffshore Wind United States

NYSERDA

• Participation in RFP

New York State Energy Research and Development Authority

Request for proposal (Jan 2017)

• Topic

New York Offshore Wind Energy Development Consulting Services

• Scope

Project Development and permitting assistance

Site selection and desktop development studies

Grid, offtake, supply chain/workforce development

Stakeholder engagement

Cost analysis

• Submission together with US Partners

Support Area 1: Project development and permitting assistance

Support Area 2: Site selection and desktop development studies

Support Area 6: Supply chain/workforce development

Support Area 7: Cost analysis

ONPManagement 15ONP Management Company Presentation

Your Contactin the Americas

ONP Management GmbH

Veritaskai 3 | 21079 Hamburg | Germany

www.onp-management.com

Dipl.-Ing. Knud Grimm

Senior Project Manager

Cph +49 172 265 8558

[email protected]

Dipl.-Ing. Frank Witte

Area Manager Americas

Project Development & Management

Cph +49 173 592 6166

[email protected]