Onondaga County’s Long Nutrient and TMDL Tour
& Lessons Learned Tom Rhoads Commissioner Dept. of Water Environment Protection Onondaga County
Onondaga County Executive Joanne Mahoney
Presentation Overview
• Onondaga Lake Water Quality • Phosphorous Load Relationships • Initial / Final TMDL Approach • Lessons Learned
Onondaga County Executive Joanne Mahoney
Onondaga Lake Water Quality
Onondaga County Executive Joanne Mahoney
• Onondaga Lake once severely impacted by P
• 2/3 of P loading came from the Metro WWTP
• Algal growth • Reduced water clarity • Low DO levels • Eutrophic lake
conditions
Consent Judgment -- Stage II – 1998 Metro WWTP Upgrades 2006
Onondaga County Executive Joanne Mahoney
• Biologically Aerated Filter (BAF)
• Excellent Ammonia Removal • Stage III ammonia limits met • Veolia/Kruger BIOSTYR • High Rate Flocculated
Settling (HRFS) • Phosphorus removal • Veolia/Kruger Actiflo
Benefits of Stage II Metro P Treatment Onondaga Lake TP Loading
Onondaga County Executive Joanne Mahoney
Building a Case Based Upon Onondaga Lake Water Quality
Onondaga County Executive Joanne Mahoney
0
10
20
30
40
50
60
70
80
90
100
110
120
130
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 Aver
age
Phos
phor
us C
once
ntra
tions
(ug/
l) in
the
Upp
er W
ater
s
Alga
l Blo
om %
Fre
quen
cy, M
easu
red
as C
hlor
ophy
ll-α
YEAR
Summer (June-September) Algal Bloom Frequency & Summer Average Phosphorus Concentrations in the Upper Waters (0-3m) of Onondaga Lake
%Exceeds 15 ppb % Exceeds 30 ppb
Lake Response to Reductions in TPMETRO
Onondaga County Executive Joanne Mahoney
clear water phase (CWP) ‘87-’02 and ‘08-’09; importance of “top-down” effects
TPMetro
(mgP/L)
0
1
2
3
TPepi
((g/L)
0
50
100
Chlepi
((g/L)
0
20
40
1980 1985 1990 1995 2000 2005 2010
SD (m)
012345
Another Full presentation coming at Spring Meeting!
Shift to 2009 - ACJ 4th Stipulation
Onondaga County Executive Joanne Mahoney
• Extended dates for Stage III P Compliance • 0.10 mg/L by November 16, 2010 • 0.02 mg/L (or other limit) by December 31, 2015
• Recognized that P limit not conclusively established
• WEP evaluates treatment to 0.02 mg/L (estimated cost up to $700,000,000!)
• Recent improvements evidenced in Lake • Lake model development • Ongoing TMDL analysis, GI, and FCA • Requires Optimization Analysis of P Treatment
at Metro WWTP
TMDL Development
Onondaga County Executive Joanne Mahoney
• Heavily relied upon lake monitoring and modeling data
• Consideration of all loads: Metro, CAFO, MS4, Fertilizer law, CSO mitigation via green and gray, other point sources, etc.
• Multiple stakeholders • Full analysis of all alternatives
Next Steps
Onondaga County Executive Joanne Mahoney
• NYSDEC TMDL July 2012 • Pre-implementation studies for optimization
• PAC temperature dependency • Metro effluent bioavailability using PAC • Refine Cross Channel isolation wall design • Mixing modifications
• SPDES Permit currently in ENB • Design and construction • Current completion date: January 2015
Lessons Learned
Onondaga County Executive Joanne Mahoney
• This can be a long journey, 1998 ACJ to May 2013 SPDES, to proposed 2015 Construction
• Intense receiving water monitoring • Utilizing green and innovative solutions to
build broad community support • Use of an FCA to help build the case. • It still isn’t cheap! $5,900,000 for
construction, $3,000,000+ in O & M.
QUESTIONS?
Onondaga County Executive Joanne Mahoney
• Tom Rhoads • 315.435.2260 x 312 • [email protected]
• Spring meeting presentation on optimization
details. See you in Syracuse!