Sr. No. Name of work Ward No. Est. Cost (Rs. In Lacs) Date of Work Order Actual date of completion Name of the Agency/Contractor Status 1 Providing and Fixing of I.P.B. Street from H/o Rajpal to H/o Rajbir, H/o Rajpal to H/o Ved and Ramphal J.E. wali gali, in Barsi Nagar, W.no.1, Rohtak. 1 20.22 02-01-2018 01-04-2018 The Nindana Rathee Co- op L&C Society Work order issued 2 Const. of Science Block Building in Gaur Brahman College, Rohtak. MPLADS 1 21.00 Tender to be opened on 07-02-2018 3 Providing and Fixing 80mm Thick I.P.B. under R.O.B. Jind Road Near Railway Line, Ward No. 1, Rohtak. 1 4.62 Estimate prepared 4 Providing and Fixing 80mm Thick I.P.B. From Vishkarma Engg. Works to H/o Ashok Ravi, H/o Subedar Ranbir, H/o Rambhaj Hooda side gali and H/o Nirmala to H/o Rajpal in Nehru Colony Ward No. 1, Rohtak. 1 15.32 Estimate prepared 5 Const. of Metalled Road from H/o Subhash Wali Gali, Vidya Sagar High School Wali Gali to H/o Narender Sikka, H/o Dalbir to H/o Pandit Ram Bhagat Sharma and H/o Bablu to H/o Bittu Wali Gali in Indira Colony, Ward No. 1, Rohtak. 1 8.61 Estimate prepared Total 69.77 Ward No. 1 Work in Progress, Rate approval under process, Tender Under Process Ongoing Works Municipal Corporation, Rohtak.

Transcript of Ongoing Works Municipal Corporation, Rohtak.

Page 1: Ongoing Works Municipal Corporation, Rohtak.

Sr. No. Name of workWard

No.

Est. Cost

(Rs. In

Lacs)

Date of Work

Order

Actual date of

completion

Name of the

Agency/ContractorStatus

1Providing and Fixing of I.P.B. Street from H/o Rajpal to H/o Rajbir, H/o Rajpal to H/o Ved and

Ramphal J.E. wali gali, in Barsi Nagar, W.no.1, Rohtak.1 20.22 02-01-2018 01-04-2018

The Nindana Rathee Co-

op L&C SocietyWork order issued

2 Const. of Science Block Building in Gaur Brahman College, Rohtak. MPLADS 1 21.00Tender to be opened on

07-02-2018

3Providing and Fixing 80mm Thick I.P.B. under R.O.B. Jind Road Near Railway Line, Ward No. 1,

Rohtak.1 4.62 Estimate prepared

4

Providing and Fixing 80mm Thick I.P.B. From Vishkarma Engg. Works to H/o Ashok Ravi, H/o

Subedar Ranbir, H/o Rambhaj Hooda side gali and H/o Nirmala to H/o Rajpal in Nehru Colony Ward

No. 1, Rohtak.

1 15.32 Estimate prepared

5

Const. of Metalled Road from H/o Subhash Wali Gali, Vidya Sagar High School Wali Gali to H/o

Narender Sikka, H/o Dalbir to H/o Pandit Ram Bhagat Sharma and H/o Bablu to H/o Bittu Wali Gali

in Indira Colony, Ward No. 1, Rohtak.

1 8.61 Estimate prepared

Total 69.77

Ward No. 1 Work in Progress, Rate approval under process, Tender Under Process

Ongoing Works Municipal Corporation, Rohtak.

Page 2: Ongoing Works Municipal Corporation, Rohtak.

Sr. No. Name of workWard

No.

Est. Cost

(Rs. In

Lacs)

Date of Work

Order

Actual date of

completion

Name of the

Agency/ContractorStatus

Ongoing Works Municipal Corporation, Rohtak.

1

P/Laying Interlocking Paver Block 80mm thick tile Sushil Kumar, Meer singh, Azad Singh Khatri wali

gali, Rampal, Ramesh Conductor wali gali, Krishan, Sanjay, Ashok(Plot), Om Parkash wali gali

between gali Narayana College Road and Petrol Pump Wali gali in Shastri Nagar, W.no.2, Rohtak.

2 24.59 09-05-2017 08-08-2017 Pinki AssociatesWork Cancellation

under process.

2

P/Laying Interlocking Paver Block 80mm thick tile from Ramniwas to Subedar Rohtash, Gyani Ram

to Randhir Fouji, Mukesh, Sunil Kataria to bani Singh, Azad, Ramavtar Balmiki to Jind Road R.O.B.,

Govt. Middle School to Shiv Mandir Wali Gali, Jagdish, Ramavtar Balmiki to Rajbir in Shastri Nagar

Colony, W.no.2, Rohtak.

2 49.22 15-09-2017 14-12-2017Sh. Vijender Kumar

Contractor98% work completed

3

P/Laying Interlocking Paver Block 80mm thick tile from Umed to Naresh Contractor, Naresh

Contractor to Roshan , Devender to Rajesh, Rajbir House to Sandeep Dangi, Narwal Bhawan Kapil to

Vinod Kaushik, Community Center Kadian Medicos to Shiv Mandir in Shastri Nagar Colony, W.no.2,

Rohtak.

2 37.74 15-09-2017 14-12-2017Sh. Vijender Kumar

Contractor96% work completed

4

P/Laying Interlocking Paver Block 80mm thick tile from Shiv Baba Medicos to Satish House, Jhakar

Bhawan to Anshika House, Ramniwas to Rohtas, Karambir to Omparkash, Ranbir, Bhagwan Singh to

Prem in Shastri Nagar Colony, W.no.2, Rohtak.

2 29.95 15-09-2017 14-12-2017Sh. Vijender Kumar

Contractor97% work completed

5Providing and Fixing Precast RCC Slab Hisar Road near Old Bus Stand to Stand to Satyam Toyata

Showroom, Ward No.2, Rohtak.2 4.24 02-01-2018 01-03-2018 Pawan, Contractor

6

Providing and Fixing 80mm Thick I.P.B. from H/o Maan Singh, Sanjeev Kumar, Church, Dharampal

Wali Gali and Amrik Plot, Azad, Gopal Wali Gali, Dadu Wala Talab Near Old Bus Stand, Ward No. 2,

Rohtak.

2 14.96 02-01-2018 01-03-2018Kuldeep Malik,

Contractor

7

Providing and Fixing 80mm Thick I.P.B. from H/o Kitabo to Ishwar Wali Gali and Approach Gali

Shastri Nagar Hisar Road and Ganga Dass Din Dayal Wali Gali and H/o Geeta and H/o Babli Wali Gali

and Sagar Wali Gali Kartarpura, Ward No. 2, Rohtak.

2 15.10 Estimate prepared

8 Const. of Drains in Various Streets in Ward No. 2, Rohtak. 2 24.12 Estimate prepared

9Const. of Metalled Road from H/o Tek Chand Rohilla to H/o Rameshwar Badgujjar, Ward No. 2,

Rohtak.2 5.76 Estimate prepared

10 P/L I.P.B. and Repair Patch Work Various Roads, Ward No. 2, Rohtak. 2 10.59 Estimate prepared11 P/F I.P.B 80mm Thick under ROB Jind Road, Ward No. 2, Rohtak 2 9.53 Estimate prepared

12Providing and Fixing 80mm Thick I.P.B. from S.P. High School Wali Gali and Approaches Gali in Shyam

Colony, Ward No. 2, Rohtak. 2 24.97 Estimate prepared

Total 250.77

Ward No. 2 Work in Progress, Rate approval under process, Tender Under Process

Page 3: Ongoing Works Municipal Corporation, Rohtak.

Sr. No. Name of workWard

No.

Est. Cost

(Rs. In

Lacs)

Date of Work

Order

Actual date of

completion

Name of the

Agency/ContractorStatus

Ongoing Works Municipal Corporation, Rohtak.

1P/ Laying 80mm thick Vibrated I.P.B. tile from Sant Pandit to Shiatch Shop Balak Natah Colony W.No.

3, Rohtak.3 8.70 21-12-2015 20-02-2016 Unitech Construction Co Disputed site

2 Beautification of Mata Darwaja Pond near Shitla Mata Mandir, W.No. 3, Rohtak 3 21.02 06-09-2017 05-12-2017Sh. Rajesh Kumar

Contractor65% work completed

3 Const. of Boundary Wall and Shed in Shamshan Ghat Jind road, W.No. 3, Rohtak. 3 13.29 06-09-2017 05-12-2017Sh. Parmod Dangi

Contractor80% work completed

4 Const. of I.P.B. Street from Sunshine School to Katcha Chamaraian Road, W.NO. 3, Rohtak 3 30.08 08-09-2017 07-12-2017 Unitech Const. Co. 96% work completed

5Const. of Street and Nala from Bala ji Dhram kanta to bala ji Work shop near shree pati petrol pump

W. no. 3, Rohtak.3 86.31 06-09-2017 05-01-2018

Sh. Vijender Kumar

Contractor85% work completed

6Const. of Boundary Wall and Providing and Fixing IPB 80mm thick Tile in Buddi Mata Near Gaukaran

Park, Ward No. 3, Rohtak.3 22.15 10-10-2017 09-01-2018 M/s Pinki Associates 10% work completed

7 Const. of Retaining wall of Rainakpura Pond, Ward No. 3, Rohtak. DPLAN 3 20.00 20-11-2017 19-01-2018 Ravinder Kumar Work order issued

8 Const. of Road Rainakpura by Pond to Baba Balak Nath, Ward No. 3, Rohtak. DPLAN 3 20.00 Hari Parkash Contractor 40% work completed

9Providing and Fixing 80mm Thick I.P.B. from H/o Kuldeep, Jaswant Singh, Sonu Khasa to Sahsi Chowk

Main Rainakpura Road, Ward No. 3, Rohtak.3 46.91 Estimate prepared

10Providing and Fixing of Interlocking Paver Block Tile Near Bansal Kiryana Store, Rampal Ashram and

H/o Krishan Kumar, Ward No. 3, Rohtak. DPLAN3 4.00

Estimate sent to ADC

Office approval awaited

DPLAN

11 Const. of Jat Dharamshala at Babra Mohalla Near Old Sadar Thana, Ward No. 3, Rohtak. MPLADS 3 11.00

Estimate sent to ADC

Office approval awaited

MPLADSTotal 283.46

Ward No. 3 Work in Progress, Rate approval under process, Tender Under Process

Page 4: Ongoing Works Municipal Corporation, Rohtak.

Sr. No. Name of workWard

No.

Est. Cost

(Rs. In

Lacs)

Date of Work

Order

Actual date of

completion

Name of the

Agency/ContractorStatus

Ongoing Works Municipal Corporation, Rohtak.

1 Const. of Community Center in Ladhot Road, W.No. 4, Rohtak. 4 90.91 28.01.2016 31-09-2017M/s Ariha Infratech Pvt.

Ltd80% work completed

2 Const. of Shed in Dhanak Choupal in Khokra Kot , W.No. 4, Rohtak 4 18.28 31.03.2017 30.06.2017 Sh. Sudhir Contractor Work Cancel

3Const. of Nala and P/Laying Interlocking Paver Block 80mm thick tile from Dr. Dhramvir to around

Ram Johri via H/o Jaipal and H/o Ved Parkash in Khokra Kot, W.no.4, Rohtak.4 87.81 06-09-2017 05-01-2018 Sudesh Kumar 35% work completed

4Providing and Laying I.P.B. in Various Street of Rajiv Vihar, Rohtas Nagar and Fatehpuri Colony in

Ward No. 4, Rohtak.4 30.27 30-10-2017 29-01-2018 Unitech Const. Co. 70% work completed

5 Raising of Boundary Wall of Saini Shamshan Ghat in Hanuman Colony, Ward No. 4, Rohtak. 4 0.90Rates approval under

process

6 Const./Upgradation of Ravidaas Hostel in Para Mohalla, Tej Colony, Ward No. 4, Rohtak. MPLADS 4 5.00Rates approval under

process

7Const. of B/Wall of Shamshan Ghat, Salara Mohalla (Kumhar Shamshan Ghat Salara Mohalla), Rohtak

MPLADS4 11.00

Rates approval under

process

8Const. of B/Wall of Balmiki Shamshan Bhumi, Para Mohalla, Tej Colony, Ward No. 4, Rohtak.

MPLADS4 6.00

Tender to be opened on

07-02-2018

9

Providing and Fixing 80mm Thick I.P.B. from H/o Om Singh, Atar Singh, Subhash, Raju Wali Gali, H/o

Kamal Saini Wali Gali, H/o Surender Wal Gali and H/o Jagbir Wali Gali, Rajeev Vihar, Ward No. 4,

Rohtak.

4 19.19 A/A under process

10Providing and Fixing 80mm Thick I.P.B. from H/o Gulab Singh, Sultan Singh, Mahabir, Harkesh, Chand

Wali Gali, Rajeev Vihar, Ward No. 4, Rohtak. 4 23.81 A/A under process

11

Providing and Fixing 80mm Thick I.P.B. from H/o Palle Ram, Anoop Singh, Ramesh Wali Gali, H/o

Rohtash, Yudhvir Wali Gali, H/o Ashok, Mir Singh, Mandir Wali Gali and H/o Bablu, Shamsher, Bala

Wali Gali, Rajeev Vihar, Ward No. 4, Rohtak.

4 24.90 A/A under process

12Providing and Fixing 80mm Thick I.P.B. from H/o Surender, Sohan, Anil Wali Gali and H/o Pawan,

Raman, Rohtas Wali Gali, Dungi Gori Salara Mohalla in Ward No. 4, Rohtak. 4 9.07 A/A under process

13 Repair of Various Streets and Civil Works in Ward No. 4, Rohtak. 4 9.90 A/A under process

14

Providing and Fixing of Interlocking Paver Block Tile from H/o Dharma, H/o Pardeep Dalal Wali Gali,

H/o Satyawan Mor, Rajender Chakki Wala, H/o Bijender, H/o Subhash, H/o Suraj Bhan Wali Gali, H/o

Gulab Singh, H/o Subhash, H/o Harpal Wali Gali and H/o Rajesh, H/o Ram Kumar, H/o Sonu, H/o

Krishan, H/o Ishwar Wali Gali in Fatehpuri Colony, Ward No. 4, Rohtak.

4 18.03 A/A under process

15Providing and Fixing of Interlocking Paver Block Tile from H/o Dilbag, H/o Gulshan, H/o Sonu, H/o

Tara Chand, H/o Ashok Wali Gali in Fatehpuri Colony, Ward No. 4, Rohtak. 4 24.36 A/A under process

16Providing and Fixing of Interlocking Paver Block Tile H/o Lakpat Hooda, H/o Sushil Kumar, H/o

Dayanand Wali Gali in Rainakpura, Ward No. 3, Rohtak.4 11.45 A/A under process

17

Providing and Fixing of Interlocking Paver Block Tile from H/o Panchhi, H/o Jai Singh, H/o Dr. Ram

Parkash Wali Gali, H/o Sultan, H/o Sube, H/o Parkash Wali Gali and H/o Ramesh, H/o Master

Dayanand, H/o Vikas, H/o Mahesh Wali Gali in Fatehpuri Colony, Ward No. 4, Rohtak.

4 16.16 A/A under process

18

Providing and Fixing 80mm Thick I.P.B. from H/o Ajit Singh, Jagat Singh Wali Gali, H/o Mainpal, Rishi,

Jaswant Wali Gali, H/o Ajay Hooda, Ranbir Wali Gali and H/o Mahabir Saini, Satish Malik, Yogesh

Wali Gali, Rajeev Vihar, Ward No. 4, Rohtak.

4 19.13 A/A under process

19 Repair of Various Streets and Civil Works in Ward No. 4, Rohtak. 4 9.90 A/A under processTotal 436.07

Ward No. 4 Work in Progress, Rate approval under process, Tender Under Process

Page 5: Ongoing Works Municipal Corporation, Rohtak.

Sr. No. Name of workWard

No.

Est. Cost

(Rs. In

Lacs)

Date of Work

Order

Actual date of

completion

Name of the

Agency/ContractorStatus

Ongoing Works Municipal Corporation, Rohtak.

1

Providing and Fixing of 80mm Thick Vibrated Interlocking Tiles from Chhotu Kiryana Store to H/o

Bhole Nath, Shiv Mandir to H/o Anil Phogat, Bholu Kiryana Store to H/o Naresh Pandit and Approach

Gali, Ward No. 5, Rohtak

5 48.58 11-08-2017 10-11-2017 Pawaria and sons pvt. Ltd 80% work completed

2P&F interlocking paver block tile from H/o Ramesh Saini to H/o Manphul toward gali no. 8,9 and 10

in Uttam Vihar Colony, Ward no. 5, Rohtak5 47.00 06-09-2017 05-12-2017 S.B. Associates

60% work completed.

Work stopped due to

court case

3

Providing and Fixing of I.P.B. tile from Dayachand to K.D. School, K.D. School to Ajmer, K.D. School to

infront of Kiryana Store, Jaipal Wali Gali, Naresh Wali Gali, Krishan to Ajmer wali gali, Nunia to Pawan

wali gali in Rishi Nagar and Shastri Nagar, W.No. 5, Rohtak

5 42.55 06-09-2017 05-12-2017Sh. Vijender Kumar

Contractor40% work completed

4Providing and Fixing of I.P.B. tile from H/o Parveen to Ramniwas, Link gali K.D. School to Sandeep

Malik, Ajmer to Kala in Shastri Nagar and Rishi Nagar W.No. 5, Rohtak.5 41.50 06-09-2017 05-12-2017

Sh. Vijender Kumar

Contractor40% work completed

5

Providing and Fixing of 80mm Thick Vibrated Interlocking Tiles from Water Tank to H/o Sahabir

Sangwan, H/o S.L. Sharma to H/o Dharampal Dangi, H/o Sahabir Sangwan to H/o Rajender, H/o

Rakesh Sachdeva Wali Gali, Along Park Side, H/o R.K. Jindal Wali Gali, H/o Joginder Wali Gali and H/o

Shravan Rathi Wali Gali, Chand Nagar and Laxmi Nagar, Ward No. 5, Rohtak

5 39.71 17-07-2017 16-10-2017 Pawaria and sons pvt. Ltd 20% work completed

6Laying of Primix Carpet from Sanjeev and Hospital to HUDA City Park in Vikas Nagar, Ward No. 5,

Rohtak.5 4.79 Parmod Dangi Work in progress

7

Providing and Fixing of Interlocking 80mm thick Paver Block Tile in various street in Durga Colony

near ( h/o Karan sharma , Er SC Arrora , Jiwandass, back sidehondaagancyand Rani girls hostel) in,

W.no.5, Rohtak.

5 46.57 A/A under process

8Providing and Fixing of Interlocking 80mm thick Paver Block Tile Prem Nagar chowk to City Park jail

Road in, W.no.5, Rohtak.5 46.43 A/A under process

9Providing and Fixing of Interlocking 80mm thick Paver Block Tile Rohtak road toward Deswal Gas

Wala and Hawasingh Rathee in Kailash Colony, W.no.5, Rohtak.5 37.38 A/A under process

10Providing and Fixing of Interlocking 80mm thick Paver Block Tile Deepu wali gali , Tomer , Satbir

hooda Wali gali and Mahabir alhwat wali gali in Kailash Colony, W.no.5, Rohtak.5 47.18 A/A under process

11Providing laying 80mm thick vibrated tile Main Road Kishanpura and side widening in Laxmi Nagar

in w.no. 5, Rohtak5 42.29 A/A under process

12 Const. of Street in Uttam Vihar, Ward No. 5, Rohtak. D-Plan 5 20.00Rates approval under

process

13 Cement work in Rajeev Gandhi Stadium, Rohtak. 5 2.00Tender to be opened on

22-01-2018Total 465.98

Ward No. 5 Work in Progress, Rate approval under process, Tender Under Process

Page 6: Ongoing Works Municipal Corporation, Rohtak.

Sr. No. Name of workWard

No.

Est. Cost

(Rs. In

Lacs)

Date of Work

Order

Actual date of

completion

Name of the

Agency/ContractorStatus

Ongoing Works Municipal Corporation, Rohtak.

1 Rough Cost Estimate of Laying of Primix Carpet of Roads in Sector-2 Part, W.no.6 Rohtak. 6 25.00 24-07-2017 23-10-2017Sh. Ram Kumar,

Contractor20% work completed

2 Const. of Metalled road in various street in Vishal Nagar, W.No. 6, Rohtak 6 42.74 06-09-2017 05-12-2017The Model Co-Op L/c

Society.50% work completed

3 Const. of Metalled road in various street in Kabir Colony and Jasbir Colony, W.No. 6, Rohtak 6 41.55 10-10-2017 09-01-2018 Jassu const. co.

work order issued.

Notice issued for not

started the work

4 Const. of Metalled road in Gali No. 1 to 8 in Ramgopal Colony, W.No. 6, Rohtak. 6 49.09 10-10-2017 09-01-2018Sh. Vijender Kumar

ContractorWork Cancelled

5Providing and Fixing Thermoplastic Road Marking Paint on Sector 2, 3 and 4 Roads and Various

Roads in Ward No. 6, Rohtak.6 9.62 13-10-2017 12-12-2017 M/s Laj Associates

work order issued.

Notice issued for not

started the work 6 Laying of Primix Carpet in Various Street in Sector 3 and Sector 4 Road, Ward No. 6, Rohtak. 6 42.99 10-10-2017 09-02-2018 M/s Salasar Enterprises 50% work completed

7 Const. of Metalled road in Gali No. 9 to 14 in Ramgopal Colony, W.No. 6, Rohtak 6 49.64 13-10-2017 12-02-2018Kuldeep Malik,

ContractorWork Cancelled

8 Const. of Metalled Road in Basant vihar colony in W.no.6, Rohtak. 6 46.44 10-10-2017 09-01-2018 Prem Engg. 80% work completed

9P and F Interlocking Vibrated Paver Block Tile Rohtak road to Delhi Road and Various street in

Ramgopal Colony, W.no.6, Rohtak.6 35.08

Rates approval under

process

10 Const. of Street in Harki Devi Colony, Rohtak. 6 16.85Rates approval under

process

11P/F Interlocking Vibrated Paver Block Tile Gali No. 9 and Variouis Street in Ram Gopal Colony, Ward

No. 6, Rohtak. 6 48.10

Rates approval under

process

12Providing and Fixing Interlocking Vibrated Paver Block Tile Gali No. 13 and Various Street in Ram

Gopal Colony, Ward No. 6, Rohtak. 6 49.64

Rates approval under

process

13P and F Interlocking Vibrated Paver Block Tile in Internal Streets in Ramgopal Colony, W.no.6,

Rohtak. 6 41.43

Rates approval under

process

14 Providing and Fixing of Gymnastic Court in Chhoturam Stadium, Rohtak. 6 6.00Rates approval under

processTotal 504.17

Ward No. 6 Work in Progress, Rate approval under process, Tender Under Process

Page 7: Ongoing Works Municipal Corporation, Rohtak.

Sr. No. Name of workWard

No.

Est. Cost

(Rs. In

Lacs)

Date of Work

Order

Actual date of

completion

Name of the

Agency/ContractorStatus

Ongoing Works Municipal Corporation, Rohtak.

1 Providing and Laying I.P.B. Street from Delhi Road to Village Majra, Ward No. 7, Rohtak. 7 48.06 24-07-2017 23-11-2017The Shiv Shakti Co-op

L&C Society95% Work Completed

2Providing and Relaying of Old C.C. Paver Block Sonipat Road to Teju House on Firni in Village Bohar,

Ward No. 7, Rohtak.7 46.69 24-07-2017 23-11-2017

The Shiv Shakti Co-op

L&C Society60% Work Completed

3Providing and Fixing I.P.B. Tiles Firni to H/o Ajit, Bijender Wali Gali, Suresh Wali Gali, H/o Ajit to Zile,

Joginder Wali Gali and Various Street in Village Bohar, Ward No. 7, Rohtak.7 48.98 24-07-2017 23-11-2017 Vijay Kumar, Contractor 90% Work Completed

4Const. of Boundary Wall and Earth Filling in S.C. Shamshan Ghat Near Stadium in Village Bohar, Ward

No. 7, Rohtak.7 33.89 15-09-2017 14-12-2017 Vijay Kumar, Contractor 50% Work Completed

5 Cons. Of Cow Ghat and Retaining Wall of Pond in Garhi Bohar, Ward No. 7, Rohtak. 7 43.61 24-07-2017 23-11-2017 Om Parkash, Contractor 10% Work Completed

6Const. of 2 Nos. Cow Ghat and Retaining Wall of Manda Wala Pond in Village Bohar, Ward No. 7,

Rohtak.7 24.99 24-07-2017 23-10-2017

The Shiv Shakti Co-op

L&C SocietyWork in progress

7Const. of Nala from Chicken Corner to Thekedar Kirshan and Rishi shop to Outer Flyover in Village

Bohar in Ward no. 7, Rohtak7 45.29 Ajay, Contractor Work in progress

8 Const. of Shed and Hall in Brahman Shamshan Ghat Village Bohar, Ward No. 7, Rohtak. 7 22.68 02-01-2018 01-04-2018 Vijay Kumar, Contractor Work in progress

9Providing and Fixing of I.P.B. Street From H/o Anar Singh to H/o Mukesh Rathee, H/o Anar Singh

near H/o Rajender and Kapoor P.G. to H/o Rameshwar in Village Asthal Bohar, W.No. 7, Rohtak.7 21.71 23-11-2017 22-02-2018 Sunil Kumar, Contractor Work in progress

10Providing and Fixing of I.P.B. tile from Rohtak road to Rathee P.G. via H/o Dalal and various street in

Village Asthal Bohar, W.No. 7, Rohtak.7 20.05 23-11-2017 22-02-2018 Neeraj Bhardwaj Work in progress

11 Const. of Hall in General Shamshan Ghat in Bhopan Pana Village Bohar, Ward No. 7, Rohtak. 7 14.04 23-11-2017 22-02-2018 Om Parkash, Contractor Work in progress

12Construction of Nala and Interlocking Paver Block Street ISI Start from Boosting Station to Canal and

Approaches in Bhopan Pana village Bohar in W.No. 7, Rohtak.7 48.99 23-11-2017 22-03-2018 Sunil Kumar, Contractor Work in progress

13

Providing and Fixing Interlocking tiles From H/o Rajender wali gali, Daya Singh to Balraj wali gali,

Ishwar to Surender Wali gali, Hukum to Udey wali gali, Banjaron wali gali and Joginder wali gali in

Garhi Majra, W.No. 7, Rohtak.

7 46.38 26-10-2017 25-02-2018M/s SSK Brothers Const.

Pvt. Ltd. (Sanjay Kundu)Work in progress

14Providing and Fixing of Interlocking tiles from Shamshan Ghat to H/o Dayanand Village Garhi Majra,

W.No. 7, Rohtak.7 45.88 26-10-2017 25-02-2018

Mukesh Kumar,

ContractorWork in progress

15Const, of Nala and Providing and Fixing of I.P.B. Tile in front of Mandir to H/o Ramchander in Village

Garhi Bohar, Ward No. 7, Rohtak.7 24.82 23-11-2017 22-02-2018 Deepak Contractor Work in progress

16 B/Wall and Pavement with IPB in Garhi Majra School, Rohtak. D-Plan 7 20.00The Narwana Rajendra

Co-op L&C SocietyWork in progress

Total 556.06

Ward No. 7 Work in Progress, Rate approval under process, Tender Under Process

Page 8: Ongoing Works Municipal Corporation, Rohtak.

Sr. No. Name of workWard

No.

Est. Cost

(Rs. In

Lacs)

Date of Work

Order

Actual date of

completion

Name of the

Agency/ContractorStatus

Ongoing Works Municipal Corporation, Rohtak.

1 Const. of Boundary Wall of M.C. Land opp. Stadium in Village Baliyana, Ward No. 8, Rohtak. 8 16.31 31-05-2017 30-07-2017 Vijay Kumar, Contractor

40% work completed.

Work stopped due to

land dispute

2Providing and Fixing of Interlocking 80mm Thick Paver Block Tile H/o Partap via H/o Bablu Kumhar

toward Firni (Near Ring Bandh Bus Stand) in Village Baliyana, Ward No. 8, Rohtak. 8 47.18 08-09-2017 07-01-2018 Amit Kumar, Contractor 80% work completed

3 Const. of Dada Vishada Community Centre at Behran Pana Village Baliyana, Rohtak. 8 46.71Rates approval under

process4 P/L I.P.B. 80mm Thick Jhajjar Road towards Kanheli Revenue Rasta, Ward No. 8, Rohtak. 8 2.13 23-11-2017 22-01-2018 Sachin Kumar Work in progress

5Providing and Laying of Dry Brick on Edge Paving from H/o Ramkishan S/o Mange Ram to Panghat

Kuan (Majra Pana), Baliyana, Ward No. 8, Rohtak.8 24.68 10-10-2017 09-01-2018 S.R. Const. 30% work completed

6Const. of Drain and Providing and Fixing of Interlocking Paver Block from Shop of Baljeet S/o Jaage

Ram to H/o Suresh via H/o Jagdish, H/o Shami, Kheri Sadh, Ward No. 8, Rohtak.8 20.52 17-10-2017 16-01-2018 Sachin Kumar 98% work completed

7Providing and Laying of Dry Brick on Edge Paving from Unique Health Club to Bairan Pana (Panghat

Kuan), Baliyana, Ward No. 8, Rohtak.8 24.66 13-10-2017 12-01-2018 S.R. Const. 30% work completed

8 Construction of Shed and Hall in Shot Pana Shamshan Ghat Village Kheri Sadh, Ward No. 8, Rohtak. 8 22.63 23-11-2017 22-02-2018 Amit Kumar, Contractor Work in progress

9 Construction of Shed and Hall in Sindhu Pana Shamshan Ghat Village Kheri Sadh, Ward No. 8, Rohtak. 8 23.85 23-11-2017 22-02-2018 Amit Kumar, Contractor Work in progress

10 Const. of IPB Street H/o Ashok S/o Kapoora to Ring Bandh H/o Jaipal in Ward No. 8, Rohtak. 8 24.65 23-11-2017 22-02-2018 Amit Kumar, Contractor Work in progress

11

Const. of Drain and Providing and Fixing of Interlocking Paver Block from H/o Kapoor Singh S/o

Prithi to Shot Pana Choupal, H/o Kapoor S/o Chand Ram to Mukesh S/o Rai Singh, H/o Sandeep S/o

Mukhtyar to Sunil, H/o Mukhtyar to RamChander S/o Risal Singh, Senior Sec. School Main Road, H/o

Pankaj S/o Madan to Sort Wala Community Centre and H/o Subhash S/o Dhoop Singh to Shri S/o

Bhanwar, Kheri Sadh, Ward No. 8, Rohtak.

8 24.82 23-11-2017 22-02-2018 Sachin Kumar Work in progress

12Providing and Fixing 100 mm Thick Vibrated Paver Block Tile from Health Club toward Jaipal S/o

Diwan Singh , Shamsher Master to Baliyana Bus Stand (Ring Bandh) Village Baliyana , W.no.8, Rohtak.8 45.29 Amit Kumar, Contractor Work in progress

13Providing & Fixing of Interlocking Paver Block 80 mm thick tiles from H/o Anup Singh S/o Bhagwan

Singh to Shamshan Bhumi in Village Kanheli, W.no.8, Rohtak.8 7.24 23-11-2017 22-01-2018 Sachin Kumar Work in progress

14 Const. of Toilet and Renovation of Harijan Choupal in Village Baliyana, Ward No. 8, Rohtak. 8 2.12 23-11-2017 22-01-2018 S.R. Const. Work in progress

15 Renovation of Sports Stadium at Village Baliyana, Ward No. 8, Rohtak. 8 45.39 A/A under process

16Const of Retaining wall and dewatering of pond in Kandela Wala Pond in village baliyana, W.no. 8,

Rohtak8 49.80 A/A under process

17

Const. of Drain and Providing and Fixing Interlocking Paver Blocks from Shop of Naresh to Nanha S/o

Purn, H/o Prem to Nitu, H/o Mahabir to H/o Krishan, H/o Rajal to H/o Rohtas in Village Pehrawar,

Ward No. 8, Rohtak.

8 24.79 Maa Kali Builders Work in progress

18Const. of IPB Street H/o Tekram to H/o M.C. House, M.C. House to H/o Naurang, H/o Narang to H/o

Ramkumar, H/o Ranbir to H/o Santa in Village Baliyana, Ward No.8, Rohtak8 24.95 Amit Kumar, Contractor Work in progress

19P&F Interlocking Vibrated Paver Block Tile from Ramkishan S/o Chandgi To Kishori Khati and

Bijender Pandit wali gali in Majra Pana village Baliyana , W.no.8, Rohtak.8 24.98 Amit Kumar, Contractor Work in progress

20P&F Interlocking Vibrated Paver Block Tile from H/o Ramkishan to Sher Singh, Raje wali gali,

Ramkishan to Majra Choupal and Branch Gali in Majra Pana Village Baliyana, W.no.8, Rohtak. 8 24.72 Sombir Singh, Contractor Work in progress

21Const. of Street from H/o Nihal Singh S/o Ravi Singh to Shamshan Ghat and Dilbag Singh S/o Ram

Singh to Shamshan Ghat in Kanheli, Ward No. 8, Rohtak. D-Plan8 6.75 Anil Kumar Work in progress

22 Laying of Old Usable tile i.e. Stored in Village Baliayan Stadium, W.No. 8, Rohtak. 8 6.59Rates approval under

process

Ward No. 8 Work in Progress, Rate approval under process, Tender Under Process

Page 9: Ongoing Works Municipal Corporation, Rohtak.

Sr. No. Name of workWard

No.

Est. Cost

(Rs. In

Lacs)

Date of Work

Order

Actual date of

completion

Name of the

Agency/ContractorStatus

Ongoing Works Municipal Corporation, Rohtak.

23Providing and fixing of Internocking Paver Block tile from H/o Babla Kumhar to H/o Shamsher

Master and H/o Babla Kumhar to Shivalaya Mandir in Village Baliyana, W. No. 8, Rohtak.8 24.34

Rates approval under

process

24

Providing and Fixing of Interlocking Vibrated Paver Block Tile from Chowkidar Choupal to H/o

Ramkaran S/ o Prithi and H/o Ramesh S/o Dharma to Pandit Choupal and Nanu S/o Karan Singh Wali

Gali in Bairan Pana Village Baliyana Ward No. 8, Rohtak.

8 24.95Rates approval under

process

25

P&F Interlocking Vibrated Paver Block Tile from Dayakishan wali gali, Dhansingh to Dayanand,

Udham wali gali and Raising of Old IPB Tile in Main Gali Near Rajesh Pardhan to Ring Bandh Wali Gali

in Village Baliyana , W.no.8, Rohtak.

8 24.94Rates approval under

process

Total 614.99

Page 10: Ongoing Works Municipal Corporation, Rohtak.

Sr. No. Name of workWard

No.

Est. Cost

(Rs. In

Lacs)

Date of Work

Order

Actual date of

completion

Name of the

Agency/ContractorStatus

Ongoing Works Municipal Corporation, Rohtak.

1 Laying of Premix Carpet at Various Road of Sector 14, Rohtak 9 39.14 24-08-2017 23-11-2017 Ram Kumar, Contractor 50% work completed

2 Laying of Premix Carpet 10mtr. and 18mtr. Wide Road in Sector 1, Ward No. 9, Rohtak. 9 62.44 Ram Kumar, ContractorTechnical sanction

awaited

3 Laying of Premix Carpet in Housing Board Colony Sector 1, Rohtak. 9 29.57 24-08-2017 23-11-2017 Ram Kumar, Contractor 10% work completed

4Providing and Fixing 80mm Thick I.P.B. in Kamal Colony and Dev Colony (approach gali no. 1 and 2),

Ward No. 9, Rohtak. 9 24.91 24-10-2017 23-01-2017 Satish Kumar, Contractor 50% work completed

5

Providing and Fixing of Interlocking Paver Block from B.S. Sharma, Krishan Malik, Baljit Singh

Bambal, Mehar Singh Vyayamshala wali gali, Sanjeev Gehlawat, Jai Kishan Hooda to Ishwar Hooda

wali gali, Ishwar Hooda, Satish Kumar to Sukhbir Pawria wali gali, Kundu Niwas to R.C. Sharma,

Heavan Garden to Captain Abhimanyu Office and Ashok Balhara to D.S. Kharab wali gali in Dev

Colony, Chhotu Ram Nagar, Kamal Colony and Vinay Nagar, Ward No. 9, Rohtak.

9 45.34 15-11-2017 14-03-2018The Prisha Infrastructure

Pvt. Ltd.60% work completed

6 Const. of Street from Heavan Garden to Captain Abhimanyu Office, Ward No. 9, Rohtak. 9 10.03Rates approval under

process

7 Const. of Community Centre in Revenue Colony, Ward No. 9, Rohtak. 9 12.93Rates approval under

process

8 Const. of Shed on Kusti Ground in Mehar Singh Akhara, Dev Colony, Ward No. 9, Rohtak. MPLADS 9 5.00 Estimate sent

9 Repair of Various Streets and Civil Works in Ward No. 9, Rohtak. 9 9.92 A/A under processTotal 239.28

Ward No. 9 Work in Progress, Rate approval under process, Tender Under Process

Page 11: Ongoing Works Municipal Corporation, Rohtak.

Sr. No. Name of workWard

No.

Est. Cost

(Rs. In

Lacs)

Date of Work

Order

Actual date of

completion

Name of the

Agency/ContractorStatus

Ongoing Works Municipal Corporation, Rohtak.

1Providing and Fixing I.P.B. 80mm Thick from H.No. 8 Madaan Mansion to Dr. Vinay Govila, H/o Meena

to Kamal and H/o Shri Mangat Lal Katyal, Adarsh Nagar, Ward No. 10, Rohtak.10 7.68 23-08-2017 22-10-2017

Pramod Dangi,

ContractorWork completed

2

Widening of Road Shiv Mandir Gurudwara, Jonie Child Hospital to H/o Raghbir Singh Ahlawat Retd.

S.D.O. with 80mm Thick Interlocking Paver Block on Both Sides of Road, Subhash Nagar and Bhart

Colony, Ward No. 10, Rohtak.

10 42.83 28-07-2017 27-11-2017Pramod Dangi,

Contractor50% work completed

3 Providing and Fixing 04 Nos. Cycle Machine in Open Gym Mansarover Park, Ward No. 10, Rohtak. 10 1.50 28-07-2017 27-08-2017Super Sonic Gym and

Sports IndustriesWork completed

4Const. of Metalled Road Charkhamba to along Guffa Wala Mandir, Govt. School to Lucky Park and

Lucky Park to Shri Krishan Hooda Niwas to Nav Jeewan Hospital, Ward No. 10, Rohtak.10 34.23 15-11-2017 14-03-2018 Sudesh Kumar Work in progress

5Providing and Fixing 80mm Thick I.P.B. Gulshan Bhojnalaya Wali Gali (along Delhi Road), Subhash

Nagar, Ward No. 10, Rohtak.10 16.74 24-10-2017 23-12-2017 Unitech Const. Co. Work in progress

6 Providing and Fixing 80mm Thick I.P.B. in Bhart Colony and Subhash Nagar, Ward No. 10, Rohtak. 10 24.88 24-10-2017 23-01-2018Pawaria and Sons Pvt.

Ltd.30% work completed

7 Renovation of C.R. Polytechnic Wala Road in Model Town, Ward No. 9 and 10, Rohtak. 10 49.93 02-01-2018 01-05-2018The Nindana Rathee Co-

op L&C SocietyWork order issued

8Providing and Fixing I.P.B. 80mm Thick from in Bharat Singh Rathee Choupal in Tilak Nagar, Ward

No. 10, Rohtak.10 3.09 15-11-2017 14-01-2018

Suresh Chand Bansal,

ContractorWork completed

9Providing and Fixing 80mm Thick I.P.B. in H/o Somnath Suneja Wali Gali, H/o Vinod Dua, H/o Master

Darshan Lal Wali Gali, Adarsh Nagar, Ward No. 10, Rohtak.10 3.63 15-11-2017 14-01-2018 Sunil Kumar, Contractor 60% work completed

10 Repair of Sewer Line in Mattu Ram Community Centre, Ward No. 10, Rohtak. 10 0.95 A/A under process

11Providing and Fixing Interlocking Paver Blocks Near Forest Office to H/o Rajesh Chandel in Jhang

Colony, Ward No. 10, Rohtak.10 3.89 A/A under process

12Const. of Metalled Road from Co-op Bank to Om Sweets and Near Multani Optical via Dua Lecturer

Wali Gali Near Apex School, Model Town, Ward No. 10, Rohtak.10 23.94 A/A under process

13

Widening of Road from Wadhwa Fruit Shop to Ex. M.C. Karsi Ram Pruthi, H.No. 847/22 Krishan Lal

to Nursery Park, Nursery Park to H/o Basanti Devi and H/o Dharamvir to H/o M.N. Grotra Advocate,

Model Town and Jhang Colony, Ward No. 10, Rohtak.

10 24.91 A/A under process

14Const. of C.C. Street from Dr. Ravi Mohan and K.K. Narulla H.No. 226 to H/o Kochar Villa H.No. 197,

Subhash Nagar, Ward No. 10, Rohtak.10 16.77 A/A under process

15Const. of C.C. Street from H/o New Gulati Bij Bhandar to H/o Munna Sharma in Naya Bazar Wali Gali,

Ward No. 10, Rohtak.10 18.92 A/A under process

16 Repair of Various Streets and Civil Works in Ward No. 10, Rohtak. 10 9.07 A/A under process

17Const. of C.C. Street from Shop of Naresh Kiryana to H/o Randhir Khatkar, Adarsh Nagar, Ward No.

10, Rohtak.10 3.06 A/A under process

18Installation of National Flag, 30.5 Meter Height at Govt. M.C. Land Madan Lal Dhingra Dharamshala

Gandhi Nagar, Rohtak MPLADS10 10.26 Estimate sent

Total 296.28

Ward No. 10 Work in Progress, Rate approval under process, Tender Under Process

Page 12: Ongoing Works Municipal Corporation, Rohtak.

Sr. No. Name of workWard

No.

Est. Cost

(Rs. In

Lacs)

Date of Work

Order

Actual date of

completion

Name of the

Agency/ContractorStatus

Ongoing Works Municipal Corporation, Rohtak.

1Const. of Street with Interlocking Tile opp. Chandni Boutique Bhushan Makkad Wali Gali and Side

Street, Ward No. 11, Rohtak.11 7.03 29-03-2017 28-05-2017 Manpal, Contractor Notice issued

2 Const. of Toilet in Gandhi Camp Market, Ward No. 11, Rohtak. 11 2.85 18-09-2017 17-11-2017 Rambir Contractor Disputed site

3Const. of Streets H/o K.L. Bajaj to Near H/o Takkar near D.L.F. Main Park, D.L.F. Colony, Ward No. 11,

Rohtak.11 10.36 06-09-2017 05-11-2017 Satender Jain Work completed

4Const. of Widened Portion and Repair of C.C. Roads from Main Circular Road to H/o Rakesh Sehgal,

Jwahar Nagar, Ward No. 11, Rohtak.11 5.92 24-08-2017 23-11-2017 Bharat Bhushan 40% work completed

5Const. of C.C. Road from Labour Chowk to Balmiki Basti upto Railway Line and Widening of Road by

Providing and Fixing Interlocking Tiles-80mm, Ward No. 11, Rohtak. 11 48.48 15-11-2017 14-03-2018

Sudesh Kumar,

Contractor 20% work completed

6Providing & fixing of interlocking paver block 80 mm thick tiles from H/o BB Papli (SDO) Near Anil

Kiryana Store to H/o Khurana General Store & H/o Mange Ram In Jwahar Nagar, W.no.11, Rohtak11 5.74 02-01-2018 01-03-2018 Neeraj , Contractor Work order issued

7

Providing & fixing of interlocking paver block 80 mm thick tiles from H/o Naresh Kumar Chawla and

H/o Pankaj Saini and from H/o Omparkash to H/o Naresh Chawla and Bimla Anganwari Wali Gali,

New Chinyot Colony, W.no.11, Rohtak

11 7.84 02-01-2018 01-03-2018 Sandeep Contractor Work order issued

8Completion of Community Centre Shiv Shankar Baraat Ghar Near Shiv Shankar Mandir, Chinyot

Colony, Ward No. 11, Rohtak.11 9.98 02-01-2018 01-03-2018 Gulshan Rai Sachdeva Work order issued

9Providing & fixing of interlocking paver block 80 mm thick tiles from H/oMohan Pathak to s/o Anand

Kriyana & H/o Mr. Sapra in New Chinot Colony , W.no.11, Rohtak 11 6.04 02-01-2018 01-03-2018 Gulshan Rai Sachdeva Work order issued

10Providing and Laying of Mastic Layer from H/o Kathuria to Dua Book Depot, D.L.F. Colony, Ward No.

11, Rohtak.11 9.54 A/A under process

11

Const. of C.C. Street Near H/o R.D. Chawla and H/o Ashok Chawla H.No. 826/23, H.No. 836/23, H.No.

871A/23 Rajesh Jain and H/o Amit Kumar Jain Advocate H.No. 828/23, Sh. Manish Kumar Grover,

M.L.A., House Wali Gali, D.L.F. Colony, Ward No. 11, Rohtak.

11 24.47 A/A under process

12 Const. of Hall on 1st Floor Sh. Anandpur Trust, Jwahar Nagar, Rohtak. MPLADS 11 15.00 Estimate sentTotal 153.25

Ward No. 11 Work in Progress, Rate approval under process, Tender Under Process

Page 13: Ongoing Works Municipal Corporation, Rohtak.

Sr. No. Name of workWard

No.

Est. Cost

(Rs. In

Lacs)

Date of Work

Order

Actual date of

completion

Name of the

Agency/ContractorStatus

Ongoing Works Municipal Corporation, Rohtak.

1Const. of Street from H/o N.K. Garg to H/o Fateh Singh, Ghanipura and Repair of C.C. Road Near

Jagdish Mandir, Jagdish Colony, Ward No. 12, Rohtak.12 7.49 28-09-2017 27-11-2017 Ashok Kumar, Contractor 80% work completed.

2 Const. of Simran Sweets Wali Gali Near Old I.T.I. Ground, Ward No. 12, Rohtak. 12 2.59 06-09-2017 05-11-2017 Om parkash Contractor Work Cancel

3Const. of Street from Gurunanak Store (Main Jagdish Colony Road) to H/o Hari Dutt Sharma Near

Panchayti Gurudwara, Ghanipura, Ward No. 12, Rohtak. 12 13.47 06-09-2017 05-11-2017 Ashok Kumar, Contractor

Work not started due

Public dispute

4Construction of C.C. Street from H/o Madiya toward Rajesh Saini Almira Factory To Ashiana Banquat

Hall wali gali And Branch Harish Narula to Jagdish Sehgal in Arya Nagar, W.no.12, Rohtak.12 21.41 24-10-2017 23-01-2018

Pawaria and Sons Pvt.

Ltd.

20% work completed

Stop due to Laying

Sewer Line

5Const. of C.C. Street from Satish Dairy Wala to Hariom Tiles Near Parmod Trading Co., Ghanipura,

Ward No. 12, Rohtak.12 8.50 A/A under process

6 Const. of Toilet in Marble Market under Flyover Near Shiv Mandir, Ghanipura, Ward No. 12, Rohtak. 12 2.95 A/A under process

7Providing and Laying of Mastic Layer from Arya Nagar Chowk towards Zila Vikas Bhawan and Arya

Nagar Chowk to Jhajjar Road via Arya Nagar Market, Ward No. 12, Rohtak.12 35.06 A/A under process

8 Construction of main gate at Guru Ravidass Edu. Society, Arya Nagar MPLADS 12 6.00Rates approval under

process9 Const. of Building at Gandhi Ashram, Arya Nagar, Rohtak. MPLADS 12 10.00 Estimate sent

10 Const. of Sain Dharamshala in Arya Nagar, Rohtak. MPLADS 12 5.00 Estimate sentTotal 112.47

Ward No. 12 Work in Progress, Rate approval under process, Tender Under Process

Page 14: Ongoing Works Municipal Corporation, Rohtak.

Sr. No. Name of workWard

No.

Est. Cost

(Rs. In

Lacs)

Date of Work

Order

Actual date of

completion

Name of the

Agency/ContractorStatus

Ongoing Works Municipal Corporation, Rohtak.

1 Re-Development of Appu Ghar Lake, Rohtak 13 671.46 17-07-2017 16-07-2019 M/s Shrinath Const. Co. Work order issued

2Const. of C.C. Street from Main New Bus Stand Road Near Antic Menswear to Near H/o Subhash Saini,

Ward No. 13, Rohtak.13 10.59 24-10-2017 23-12-2017

Pawaria and Sons Pvt.

Ltd.90% Work Completed

3Providing & fixing of interlocking paver block 80 mm thick tiles from Mandeep Studio to Ruhit Tour

near gohana Adda W.no.13, Rohtak13 2.07 15-11-2017 14-01-2018

M/s SSK Brothers Const.

Pvt. Ltd. (Sanjay Kundu)40% Work Completed

4Repair of Streets and Drains in Chamanpura, Gurunanak Pura, Mahavir Colony, Krishana Colony, Saini

Pura, Ward No. 13, Rohtak.13 9.86 15-11-2017 14-01-2018 Hardeep Kumar Juneja 30% Work Completed

5

Providing & Fixing of Interlocking Paver Block 80 mm Thick Tiles from H/o Pappu via Positive Gym

to H/o RamaVati, Master Gassi Ram Wali Street, Ritika Cosmetics Centre to H/o Mahipal, Mahipal and

Branch Streets of Advocate Saini Wali Gali (Chamanpura), Mahinder to H/o Nand Ram, Lali to H/o

Girdirmohan (Saidass Colony), Gopi Juneja to H/o Sitaram Guliya (Anandpura), W.no.13, Rohtak.

13 32.49 13-11-2017 12-03-2018 Satish Kumar, Contractor 40% Work Completed

6

Providing & Fixing of Interlocking Paver Block 80 mm Thick Tiles Sangam Restaurant to H/o Suresh,

Rajkumar to H/o Ramesh, Radhe Saini to Shop of Raja (Sukhpura), H/o Gaurav Villa to Arun

Furniture, Sati Mandir to Mohit Chudi Wala and Pandit ji to K.L. Malhotra and H/o D.C Dhawan, H/o

Sonu to Aneja, Parveen to Sharma, Ranga Judge to Raju Dairy, shop Bhatiya Medicose to H/o Sanjay

Papita Wala (Sanjay Nagar), H/o Mahavir to Shri Ram Tution Wali Gali (Ashok Nagar), W.no.13,

Rohtak.

13 40.00 15-11-2017 14-03-2018 Sunil Kumar, Contractor 10% Work Completed

7 Const. of Street opposite Civil Hospital Near Ludhiana Kulfi Wala, Ward No. 13, Rohtak. D-Plan 13 9.00 Sarvjit Singh, Contractor 30% Work Completed

8 Const. of Dustbin Platform Near Pump House(PHED) Rahad Johad, Ward No. 13, Rohtak. 13 0.63 02-01-2018 01-02-2018 Manu Dagar, Contractor Work order issued

9Const. of C.C. Street from H/o Ashok Gulati to H/o Ashok Kumar Near Pandit Chakki Wali Gali, Saidass

Colony, Ward No.13, Rohtak.13 2.99 02-01-2018 01-03-2018 Anil Kumar, Contractor Work order issued

10

Providing and Fixing of Interlocking Paver Block 80 mm thick Tiles from H/o From Kuldeep Electric

to H/o Professor 88/14 & from H/o Satish Kumar to Madan & from H/o Bahadur Chand Behal to

Harish Kumar Dairy & from h/o Vinod to H/o Jain and from H.no. 1358/8 to Electric Pole and from

Nehra Bhawan to Khali Plot, W.no.13, Rohtak

13 19.60 02-01-2018 01-04-2018The Bhiwani Jai Balaji Co-

op L&C Society Ltd.Work order issued

11Providing and Fixing of Interlocking Paver Block 80mm Thick Tiles from Shiv Mandir to Gohana Adda

to Sai Dass Colony, W.no.13, Rohtak13 10.82

Rates approval under

processTotal 809.51

Ward No. 13 Work in Progress, Rate approval under process, Tender Under Process

Page 15: Ongoing Works Municipal Corporation, Rohtak.

Sr. No. Name of workWard

No.

Est. Cost

(Rs. In

Lacs)

Date of Work

Order

Actual date of

completion

Name of the

Agency/ContractorStatus

Ongoing Works Municipal Corporation, Rohtak.

1 Const. of Dustbin Near Booster Station Patwar Khana Road, Para Mohalla, Ward No. 14, Rohtak. 14 0.78 07-09-2016 06-10-2016M/s Savitri Construction

Co.

As per decision of Duty

Magistrate deputed for

this disputed work now

no work to be executed

on this site.

2 Const. of Metalled Roads in Ward No. 14, Rohtak. 14 30.36 11-11-2016 10-02-2017 Ram Kumar 70% work completed

3 Const. of Drain on Quilla Road, Ward no. 14, Rohtak 14 42.03 Unitech Const. Co. 30% work completed4 Beautification of Quilla Road Ward No. 14, Rohtak. 14 43.31 Sudesh Kumar Work order issued

5 Const. of Toilet Block in Quilla Mohalla near Nanda Petrol Pump Ward No.14, Rothak. 14 7.41 Ashok KumarDue to demolition of old

existing building

6Const. of C.C. Roads in Indira Market Road from Delhi Road (Gurudwara) to Kasai Chowk, Ward No.

14, Rohtak14 20.98 27-10-2017 26-01-2018 Satender Jain 80% work completed

7 Repair of Streets and Various Street and Drains in Ward No.14, Rohtak. 14 16.16Rates approval under

processTotal 161.03

1 Renovation of Pyau and Const. of Toilet and Police Post on Railway Road, Ward No. 15, Rohtak. 15 9.10 07.03.2017 06.06.2017 Satender Jain Not Start Court Case

2

Const. of Street with Interlocking Paver Blocks Devender Narang to Anju Sapra, Kewa Ganj Road to

H/o Santosh, H/o Om Parkash to Subhash Chander, Vaish Dharamshala Wali Gali, Vaish Dharamshala

to Anil Gupta Wali Gali, Anil Gupta to Goyal House, Goyal House to Garg Villa, Garg Villa to Mandir etc.

in Ward No. 15, Rohtak.

15 16.29 31.05.2017 30-07-2017 Anil Contractor

Noting for cencellation

of work due to Public

Dispute.

3 Providing and Laying I.P.B. Tile in Shori Market, W.no.15, Rohtak. 15 3.67 14.07.2017 13.09.2017 Hardeep Kumar Juneja Work Order Issued

4 Repair of Streets and Drains in Ward No. 15, Rohtak. 15 7.34 04-10-2017 03-12-2017Rajesh Kumar,

ContractorWork in progress

5 Const. of I.P.B. Streets Sunaro Wali Gali and H/o Ramphool Wali Gali, Ward No. 15, Rohtak. 15 9.23 06-09-2017 05-11-2017 Shyam Lal Jain

Noting for cencellation

of work due to Public

Dispute.

6 Const. of Old Anaj Mandi Gate and Toilet in W.no.15, Rohtak. 15 6.84 12.10.2017 11.12.2017The Azadgarh Co-Op L/C

Society LtdWork in progress

7Const. of IPB street From Dhramender Shuttering Store to Desraj Behal, Vijay Kathuria to Ashok Shika

via Sohan Lal Pehwa, Kishan Lal to Ashok Pahwa in Krishana Colony Ward No. 15, Rohtak.15 37.44 A/A under process

8Const. of I.P.B. street from Shop of Mala Ram to H/o Dhiraj Chawla in Peerji Mohalla in Shori Market

and Raju Bhutani wali gali in Dairy Mohalla, W.No. 15, Rohtak.15 2.99 A/A under process

9Providing and Fixing I.P.B. 80mm Thick from Darshan Singh Dairy to Basant Uppal Dairy and Const. of

Type-I Drain from Khairati Lal Sachdeva to Vijay Malik Dairy in Dairy Market, Ward No. 15, Rohtak.15 4.84 A/A under process

10 Repair of Patch work with Shalmax in Various Streets in W.no. 15, Rohtak 15 7.71Tender Opened on dt.

07-02-2018

11Const. of CC street from H/o Mukesh to H/o Harish and Branch Gali in Dairy Complex near Kachha

Beri Road, W.No. 15, Rohtak15 10.39

Tender Opened on dt.

07-02-2018

12

Const. of CC street from Dairy of Kishan Gandhi to Kashi Ram Dairy and Branch Gali of Kishan

Dhingra in Dairy Complex and Shop of Banarshi Dass to Shop of Devraj in Shori Market, W.No. 15,

Rohtak.

15 21.02 A/A under process

Total 136.86

Ward No. 15 Work in Progress, Rate approval under process, Tender Under Process

Ward No. 16 Work in Progress, Rate approval under process, Tender Under Process

Ward No. 14 Work in Progress, Rate approval under process, Tender Under Process

Page 16: Ongoing Works Municipal Corporation, Rohtak.

Sr. No. Name of workWard

No.

Est. Cost

(Rs. In

Lacs)

Date of Work

Order

Actual date of

completion

Name of the

Agency/ContractorStatus

Ongoing Works Municipal Corporation, Rohtak.

1Const. of Street with interlocking Paver Block near jan Sewa Sansthan and Drain no. 8, Kutana Basti

Ward no. 16, Rohtak16 24.75 31.01.2017 30.03.2017

The Narwana Rajendra

Co-op L&C Society Ltd.

Yet to be started due to

sewer and water pipe

line

2Const. of Street with Interlocking Paver Block in Basti Kutana Near Peer Baba Bhiwani Road, Ward

No. 16 Rohtak. 16 44.00 27.03.2017 26.07.2017 Vijender Kumar

Yet to be started due to

sewer and water pipe

line

3Const. of Main Street and Internal Street with Interlocking Paver block Tiles in Sher Vihar (Bhiwani

Road), Ward No.16, Rohtak.16 80.09 29-11-2017 28-05-2018 M/s Unitech Const. Co.

10% Work Completed

and further in progress

4 Construction of I.P.B. Street in Rajendra Colony, W.No. 16, Rohtak. 16 41.14 5/12/2017 4/4/2018Sh. Rajesh Kumar

ContractorWork in progress

5

Providing and laying I.P.B. tile opposite Khusboo Vatika (Surjit Pandit wali gali, Azad Balhara wali

gali, Golu Pandit wali gali, Vickey Pandit wali gali, Sarju Pandit wali gali and approach gali) New

Rajendra Colony in W.No. 16, Rohtak.

16 47.02 5/12/2017 4/4/2018Sh. Rajesh Kumar

ContractorWork in progress

6 Providing and laying of I.P.B. tile near Bhiwani Chungi in New Rajendra Colony in W.No. 16, Rohtak. 16 48.88 5/12/2017 4/4/2018Sh. Rajesh Kumar

ContractorWork in progress

7 Const. of street From Anaj Mandi Gate No. 2 to H/o Pehlwan, W.No. 16, Rohtak 16 10.00 8/12/2017 7/3/2018The Nigana Co-Op L&C

Society Ltd.

60% Work Completed

and further in progress

8Const. of IPB street from H/o Subhash via Sumit Industry C/o Vedparkash to Mange Factory Main A.K.

Factory wali gali in W.No. 16, Rohtak16 14.72 Estimate Prepiared

9Const. of IPB street from Durgana Mandir to Hanuman Mandir via H/o Rajender Choutala in Palika

Colony, W.No. 16, Rohtak16 16.69 A/A under process

10 Const. of I.P.B. Street in Lala Hukamchand Gaushala wali gali, Sher Vihar Colony, W.No. 16, Rohtak 16 5.39 A/A under process

332.68

1Providing & fixing of RCC Slab on Nalla from Shop of Vimal Stone Merchant to Garg Brothers near

ROB Kathmandi, W.no.17, Rohtak.17 5.62 17.07.2017 16.09.2017 S.V. Enterprises Work in Progress

2Providing and Fixing of Interlocking Paver Block 80mm Thick Tile from H/o Vidya Sagar to Jivanram

Public School and Const. of G.T. Near H.No. 541/35, Janta Colony, Ward No. 17, Rohtak.17 4.34 15.05.2017 14.07.2017 S.V. Enterprises Work in Progress

3Providing and Fixing of Interlocking Paver Block 80mm Thick Tile from Kiryana Shop toward Raju

Pandit Wali Gali, Janta Colony, Ward No. 17, Rohtak.17 4.92 15.05.2017 14.07.2017 S.V. Enterprises Work in Progress

4Providing & fixing of interlocking paver block 80 mm thick tile from H/o Kalkata wali Kothi to H/o

R.M. Jangra and Devi Shankar, Janta Colony, W.no.17, Rohtak17 7.97 17.07.2017 16.09.2017 S.V. Enterprises

60% Work Completed

and Further in progress

5Providing & fixing of interlocking paver block 80 mm thick tile near H/o R.K. Mittal, Janta Colony,

W.no.17, Rohtak17 7.82 14.07.2017 13.09.2017 S.V. Enterprises

Noting for cencellation

of work due to Public

Dispute.

6Providing & fixing of interlocking paver block 80 mm thick tile from Shop of Rajkumar to Decent

Public School in Raj Mohalla, Kath Mandi, W.no.17, Rohtak17 14.66 14.07.2017 13.10.2017 Pawaria and Sons

80% Work Completed

and further in progress

7Providing & fixing of interlocking paver block 80 mm thick tile from Nirmal Sardar to Baldev Chhaki

in Raj Mohalla, Kath Mandi, W.no.17, Rohtak17 5.80 14.07.2017 13.10.2017 S.V. Enterprises

Noting for cencellation

of work due to Public

Dispute.

8Providing and fixing of Interlocking paver block 80 mm thick tile under ROB Kathmandi, W.No. 17,

Rohtak.17 13.75 6/9/2017 5/11/2017 Sh. Atul Barak Contractor

Work stopped due to

public dispute

9Const. of IPB street Singla Cement Store wali gali and Approach gali in Janta Colony, Ward No. 17,

Rohtak.17 14.19 13-11-2017 12/2/2018

Sh. Rajesh Kumar

ContractorWork in progress

Ward No. 17 Work in Progress, Rate approval under process, Tender Under Process

Page 17: Ongoing Works Municipal Corporation, Rohtak.

Sr. No. Name of workWard

No.

Est. Cost

(Rs. In

Lacs)

Date of Work

Order

Actual date of

completion

Name of the

Agency/ContractorStatus

Ongoing Works Municipal Corporation, Rohtak.

10 Repair of Roads and streets in Ward No. 17, Rohtak 17 9.91The Nigana Co-Op L&C

Society Ltd.Work Order Issued

11 Const. of IPB street JRBL School to Satwan Milk Shop Janta Colony, Ward No. 17, Rohtak. 17 15.82 18-12-2017 17-03-2018The Nigana Co-Op L&C

Society Ltd.Work Order Issued

12 Providing and Fixing of Slab in various streets in Ward No. 17, Rohtak 17 7.50The Nindana Co-Op L&C

Society

Tender opened and rate

approval under process

13Const. of IPB street from H/o Ramesh Chander to H/o Master Ravinder near Netaji Subhash Park and

Vidhya Sagar park in Janta Colony, Ward No. 17, Rohtak.17 3.35

Sh. Omparkash

Contractor

Tender opened and rate

approval under process

14Beautification of Road Peepal wali gali, Manav Sewa Sang, Shamshan Ghat road in Janta Colony, W.No.

17, Rohtak.17 48.48

Administrative

Approval Under Process

Total 164.13

1Revised Estimate of Beautification of Road Double Phatak Flyover to Jhajjar Chungi Ward No.18,

Rohtak.18 41.16 6/9/2017 5/12/2017

Sh. Kuldeep Malik

Contractor

Revised Estimate

prepaired and sent for

Tech. Approval and

work in progress

2 Const. of Toilet in Old Housing Board Market, Ward No. 18, Rohtak 18 1.20 13-11-2017 12/1/2018The Shiv Shakti Co-Op

L&C Society

Tender opened and rate

approval under process

3Const. of I.P.B. Streets H/o Om Parkash Wali Gali and H/o Sanjeev Wali Gali, Preet Vihar, Ward No.18,

Rohtak.18 7.61 28.07.2017 27.09.2017 S.V. Enterprises

Notice issued to the

contractor to start the

work. And work

stopped due to laying of

Sewer Line demand by

the local resident.

4Const. of IPB street H/o Saheed Ravinder Singh Wali Gali and H/o Verma wali gali in Kamla Nagar,

Ward No. 18, Rohtak. 18 16.03 15-11-2017 14-02-2018

Sh. Sunil Kumar

ContractorWork in progress

5Const. of IPB street Rajender Gujjar wali gali and Dhrampal wali gali in Kamla Nagar, Ward No. 18,

Rohtak.18 15.68 15-11-2017 14-02-2018 M/s Unitech Const. Co. Work in progress

6 Widening of road Ex. M.C. Surender Batra wali gali in Shivaji Colony, Ward No. 18, Rohtak. 18 24.88 15-11-2017 14-02-2018 M/s Unitech Const. Co. Work in progress7 Const. of IPB street Mai Mandir wali gali in Kamla Nagar, Ward No. 18, Rohtak. 18 18.98 15-11-2017 14-02-2018 M/s Unitech Const. Co. Work in progress

8Const. of IPB street along with D.A.V. School and Opposite D.A.V. School in Kamla Nagar, Ward No. 18,

Rohtak18 23.75

The Nigana Co-Op L&C

Society Ltd.Work Order Issued

9Const. of IPB street Khatiyon wali gali, Jhakad Bhawan and Peer Baba wali gali in Kamla Nagar, Ward

No. 18, Rohtak18 22.63

The Nigana Co-Op L&C

Society Ltd.Work Order Issued

10Const. of IPB street Along With Community Center on Kanheli road in Kamla Nagar, Ward No. 18,

Rohtak.18 41.59

The Nigana Co-Op L&C

Society Ltd.

Rates approval under

process

11 Widening of Kanheli road with I.P.B. 80 mm thick in W.No. 18, Rohtak. 18 46.99Administrative

Approval Under Process

12Const. of C.C. Road from Fouji Paints and Hardware Store to Naina Niwas 553/32 in Shivaji Colony,

W.no. 18, Rohtak.18 12.41

Rates approval under

process

13Const. of Interlocking Paver Block in Various street in Preet Vihar Colony and Ambedkar Colony, W.

No. 18, Rohtak18 19.07

Administrative

Approval Under Process

Ward No. 18 Work in Progress, Rate approval under process, Tender Under Process

Page 18: Ongoing Works Municipal Corporation, Rohtak.

Sr. No. Name of workWard

No.

Est. Cost

(Rs. In

Lacs)

Date of Work

Order

Actual date of

completion

Name of the

Agency/ContractorStatus

Ongoing Works Municipal Corporation, Rohtak.

Total 291.98

1

Const. of Street with I.P.B. from H/o Neeraj to H/o Ishwar H/o Rakesh to H/o Jagdish Vacant Plot to

H/o Jai Singh, H/o Vedu to H/o Sattey H/o Vinod to H/o Anil Via. Maa Bhagwati General Store in New

Vijay nagar, Ward no. 19, Rohtak

19 36.79 17.02.2017 16.06.2017 Rahul Gautam Noting for Black List

2 Providing and Laying I.P.B. Tile in Vijay Nagar, W.no. 19, Rohtak 19 47.95 04.07.2017 03.11.2017 Pawaria and Sons

60% work completed

and balanced work

cancelled.

3

Providing and Laying I.P.B. Tile from Mange to H/o Bijender, Subhash to Anup Singh, Subhash to

Rajesh, Krishan Pawaria wali gali, Raju to Dr. Krishan, Bijender to H/o Kishor, Ahlawat Bhawan to

Brigmohan, Bijender to Ahlawat Bhawan, Kishor to Naresh in Vijay Nagar W.no.19, Rohtak.

19 42.68 6/9/2017 5/12/2017 Unitech Const. Co.Noting for cencellation

of balance work.

4 Providing and Fixing of I.P.B. in Ananad Colony, Ward No. 19, Rohtak. 19 46.25Administrative

Approval Under Process

5Const. of CC Street From H/o Ajit Jain Wali Gali opp. Raj Dharam Kaanta Circular Road, Vijay Nagar,

Ward No. 19, Rohtak. 19 17.28

Rates approval under

process

6 Repair of Nala in Dairy Complex W.No. 19, Rohtak. 19 4.93Rates approval under

process7 Providing and Fixing of I.P.B. in Various streets in Ekta Colony, Ward No. 19, Rohtak 19 22.54 Estimate Prepiared

8Providing and Fixing of I.P.B. in Gali No. 7 and Branches in Ekta Colony and H/o Deepak to H/o

Dinesh in Anand Colony in Ward No. 19, Rohtak.19 15.98 Estimate Prepiared

9Const. of I.P.B. Street from H/o Krishan to near H/o Hukum Singh in Ananad Colony, Ward No. 19,

Rohtak.19 12.52 Estimate Prepiared

Total 246.92

1Providing fixing vibrated interlocking tile from H/o Jagdish of H/o Ramniwas and H/o Satbir to H/o

Balbir in Sunaria Kalan, Rohtak.20 18.20 04-08-2015 03-01-2016 Bikram 50% work completed

2Providing and Fixing Interlocking Paver Block Tile From H/o Chander Bhan To Park in Sunarian

Kalan, W.No. 20, Rohtak.20 31.76 31.01.2017 30.07.2017 Unitech Const. Co.

60% Work completed

and in Work in Progress

3Const. of Cow Ghat and Excavation of Pond Near Temple in Village Sunaria Kalan, Ward No. 20,

Rohtak.20 43.41 31.01.2017 30.07.2017 Shamsher Singh

50% Work completed

and in Work in Progress

4Providing and Fixing Interlocking Paver Block Tiles and Nala H/o Ishwar to H/o Rajbir S/o Sh. Prem

Singh Dalal Bhawan in Sunaria Khurd Firni, Ward No. 20, Rohtak.20 45.80 31.01.2017 30.04.2017 Unitech Const. Co.

60% Work completed

and in Work in Progress

5Providing and Fixing Interlocking Paver Block Tiles and Nala H/o Mahender toward Shamshan Ghat

to Main Beri Road in Sunaria Khurd Firni, Ward No. 20, Rohtak.20 39.10 31.01.2017 30.04.2017 Unitech Const. Co. Dispute at site

6 Const. of Retaining Wall of Pond in Sunariya Kalan, W.no. 20, Rohtak 20 49.61 17.07.2017 16.11.2017 Rajesh Kumar Contractor50% Work completed

and in Work in Progress

7Construction of I.P.B. Street From Sai Communication Wali Gali, Mandir Wali Gali, Gali No. 7, Hari

Singh Colony and Approach Gali in Amrit Colony, Ward No. 20 Rohtak.20 46.10 28.07.2017 27.11.2017

SSK BROTHERS CONST.

PVT. LTD.,

95% Work completed

and in Work in Progress

8Construction of 100 MM THICK I.P.B. Street Main gali chota Pana choupal to Baljeet Budhwar wali

gali in Sunaria Khurd, Ward No. 20 Rohtak.20 31.63 28.07.2017 27.10.2017

SSK BROTHERS CONST.

PVT. LTD.,

95% Work completed

and in Work in Progress

Ward No. 20 Work in Progress, Rate approval under process, Tender Under Process

Ward No. 19 Work in Progress, Rate approval under process, Tender Under Process

Page 19: Ongoing Works Municipal Corporation, Rohtak.

Sr. No. Name of workWard

No.

Est. Cost

(Rs. In

Lacs)

Date of Work

Order

Actual date of

completion

Name of the

Agency/ContractorStatus

Ongoing Works Municipal Corporation, Rohtak.

9 Repair of Street and Const. of Drain in Sunaria Kalan and Sunaria Khurd, Ward No. 20 Rohtak 20 24.60 6/9/2017 5/12/2017Sh. Kuldeep Malik

Contractor Work in progress

10Construction of 100 MM THICK I.P.B. Street Main road near M.C. wali gali in Sunaria Kalan Ward No.

20 Rohtak20 49.95 22-11-2017 21-03-2018 M/s Parakash Const. Co. Work in progress

11Const. of I.P.B. Street Dhani KUmhar Wali Gali, near Dobh rasta and Hospital waligali and Bidro wala

Rasta in Sunaria Kalan, W.No. 20, Rohtak.20 46.58 13-11-2017 12/3/2018 M/s Unitech Const. Co. Work in progress

12

Const. of I.P.B. Street from H/.o Mahender to Kailash, H/o Suresh Kumar to Jeete Dairy, H/o Azad

Singh to Dairy, H/o Azad Singh, School to Main road, Suresh Kumar to Bijender Sharma, Rajkumar

Jangra wali gali, Premo to Mahabir Mistri, Bijender Sharma to Jai Bhagwan Verma in Amrit Colony,

W.No. 20, Rohtak.

20 48.76 22-11-2017 21-03-2018 M/s Unitech Const. Co. Work in progress

13 Const. of I.P.B. Street in Amrit Colony, W.No.20, Rohtak. 20 48.05 22-11-2017 21-03-2018 M/s Unitech Const. Co. Work in progress

14 Const. of Street with I.P.B. 80 mm thick in Gokul Colony, Ward No. 20, Rohtak 20 15.21Rates approval under

process

15Const. of street From H/o Ranbir to H/o Mahender, H/o Niwas S/o Dheere to H/o Bijender S/o

Ranbir and Leela Pehlwan wali gali, W.No. 20, Rohtak20 12.24 Estimate Prepiared

16Const. of road M.C. Park Sunarian to outer Byepass Rohtak Jhajjar road and various gali in Suanrian

Kalan, W.No. 20, Rohtak20 82.20 Estimate Prepiared

17Const of Retaining wall and dewatering of pond in Kuttal Wala Pond in village Sunarian Kalan on

Dobh wala rasta, W.no. 20, Rohtak.20 79.54 Estimate Prepiared

18Const. of Revnue Rasta H/o Kitabe to H/o Mahabir via H/o Preet S/o Master Ganga Ram and Branch

gali H/o Rajesh in Sunarian Khurd, W.No. 20, Rohtak.20 34.92 Estimate Prepiared

Total 747.66