Oncor Electric Delivery
Oncor Electric Delivery Restructure An Engineering & Construction Perspective
SWEDE ConferenceMay 11, 2007San Antonio
Mark Burt
Oncor Electric Delivery
The Overall Business Strategy
The overall strategy and Business Model looks at the business in three major segments:
• Asset Ownership
• Asset Management
• Asset Services/Operations
Oncor Electric Delivery
Asset Owner Function
Key Driver is Business Excellence
Focuses on overall business performance
Values business strategies that create opportunity & manage risk
Core competencies in forecasting & managing revenue & costs
Asset Owner expectations:• Return on assets• Earnings Growth
• Management of revenue/costs
• Responsiveness to stakeholders
Oncor Electric Delivery
Asset Manager Function
Key Driver is Asset Excellence
Strong focus on the performance of all Assets (financial, physical, human, etc.)
Core competencies in performance measurement, analysis, economic lifecycle & managing risk
Leverages information technology to manage accurate & timely information
The Asset Manager Drives:• Strategic asset planning
• Balancing the financial, technical, & sociopolitical components
• Holistic consideration of spending (Capital, O&M)
• Performance accountability
Oncor Electric Delivery
Asset Services Function
Key Driver is Service Excellence
Best-in-Class Implementation of Asset Plan(s)
Focuses on efficient & responsive service delivery
Values customer service & the quality of the work
Core competencies in work management & operating acumen
Asset Services drives:• Best in class processes
• Most effective use of resources
• Consumer/Customer Satisfaction
Oncor Electric Delivery
The Business Model
Asset Owner sets & directs Asset Manager to meet asset performance goals
Asset Manager develops asset plans for implementation by Asset Services
Asset Services implements Asset Plans, Policies, and Guidelines
7
Oncor Electric Delivery
Key Accountabilities
Asset Owner
Develops overall business plans
Determines appropriate level of investment & spending for assets (capital & O&M)
Defines owner’s risk tolerance
Defines expected level of performance of
assets:
- Financial
- Technical (Reliability)
Asset Manager
Develops strategies, policies, & standards
Monitors implementation of
Asset Plans and key performance indicators
Asset Plans include:
- Asset expansion, augmentation and
replacement projects & programs.
- Materials, design, and construction standards
- Maintenance & operations guidelines
Asset Services
Implements Asset Plans according to predetermined
performance metrics
Designs & builds asset expansions and
replacements per standard
Maintains and operates assets in accordance with guidelines
Provides key feedback on asset condition & performance
Oncor Electric Delivery
Keys for Success
• Focus on accountabilities and key drivers for each business segment
• Continue process improvement and innovation in all aspects of business
• Performance excellence in each area of the enterprise
• Performance metrics to drive accountability & performance
9
Oncor Electric Delivery
Organizational Alignment
Asset Manager• Regulatory• Rates• REP Relations• Community/Customer Relations• ERCOT Interface• Metering and Measurement
Services• Communications• Investment Strategy and Planning• Environmental Standards and
Policy• Electric Delivery HR• Asset Management & Engineering
Asset Services• T&D Operations• T&D Field Engineering• Storm/Trouble Response• Construction• Maintenance• Transformer Shop• Supply Chain and Sourcing• Fleet Management• Safety & Training• Work Management• Distribution Services • Environmental Lab and Waste Management
Asset Owner• Governmental Affairs• Business Operations• Economic Development• Business & Developer Management• Finance & Accounting
10
Oncor Electric Delivery
• Engineering (T & D) – Engineering & Material Standards, Conceptual Designs, Policies & Procedures, Construction Standards, Performance Management
• System Operations – T&D Operating Centers
• System Planning – T&D Planning, System Expansion, System Protection & Coordination
• Asset Investment Strategy – Budgeting, Program/Project Funding, Plan Management
• Performance Management – T&D System Performance, Metric Analysis, Benchmarking
• Information Management – IT Systems Planning, Systems Applications
• Maintenance Strategy – Maintenance Program Strategy & Development
Oncor Electric DeliveryAsset Management & Engineering
11
Oncor Electric Delivery
• Engineering (T & D) – Specific Project Design & Project Management, Easement & ROW Acquisition, Construction Coordination
• System Operations – Storm & Trouble Response, T&D Field Operations
• Construction (T&D) – Project & Maintenance Construction, Contractor Management, Work Management & Project Scheduling
• Customer Operations – Customer Outage & Informational Response
• Safety & Training – Safety Program Development & Training
• Fleet Management – Fleet Management Operations
• Materials Management – Supply Chain Operations & Materials Acquisition, Strategic Sourcing
Oncor Electric DeliveryAsset Services
12
Oncor Electric Delivery
What’s Different And What’s Not
What's different:
Asset Management will be more focused on planning, strategy, policy
Asset Services will be more focused on superior Plan execution
What's not different:
Asset Services input and feedback on system planning, standards, plan development and other issues is just as critical as it ever has been
Clear, continuous, straightforward communication between groups is the key to shared success
13
Oncor Electric Delivery
• New concept initiated for the performance of distribution field engineering and customer service activities “out of office”
• Concept based on the criteria to provide plan of service, design specific details, calculation of customer charges, and other project specifics (easement & vegetation management requirements, etc.) while “on location” with customer and potentially during first site visit
• Includes integration of new tools including non-graphic estimating tool and design programs into mobile computer system
• Future enhancements include mobile connectivity to System program to update databases and issue work requests & service orders
Engineering & Construction – What Changes?Field Engineering
14
Oncor Electric Delivery
• Construction pricing developed to utilize “unit pricing” for performance of construction specific activities
• Goal is to “unitize” as much work as can effectively be captured with this type of pricing
• Expected that approximately 90% of all construction to be based on unit work
• Construction units are integrated into estimating systems such that system output includes quantity and type of construction units for that specific project (based on estimate by designer)
Engineering & Construction – What Changes?Construction Unit Pricing
15
Oncor Electric Delivery
Engineering & Construction – What Changes?Construction Unit Pricing
• Example of construction unit is as follows:
Unit # Unit Description
CB2000
PRIMARY CABLE, SINGLE PHASE. INCLUDES: SET UP/BREAKDOWN, PULL ROPE, PULL CABLE IN CONDUIT, MAINTAIN MOISTURE SEAL AT CABLE ENDS AND CLEANUP. UNIT OF MEASURE = PER PULL (245' AVG PULL).
16
Oncor Electric Delivery
• Audits of design & construction activities have been initiated to provide an “external” look at the quality of work
• Items include full range of design & construction activities
• Actions plans from audits to provide training and educate field personnel on design & construction standards
• Additional activity includes review of Standards of construction and material requirements for “real work” application
• Also includes review & revisions to design estimating units and associated material requirements driven by estimating system
Engineering & Construction – What Changes?Design & Construction Audits
20
Oncor Electric Delivery
• Centralized development of maintenance programs to provide efficiencies on performance of work and also consistent approach to maintenance practices
• Maintenance programs developed and targeted to address specific items (facilities) or issues to derive maximum benefit from maintenance dollars
• Maintenance programs developed by Asset Manager organization with review of latest technology and practices available
• Field organizations charged with timely and cost-effective completion of specific maintenance work
• Both organizations judged by improvement in operating performance of distribution system
Engineering & Construction – What Changes?Program Development
21
Oncor Electric Delivery
Engineering & Construction – What Changes?Program Development
A summary of the various types of maintenance programs are as follows:
• Visual & infrared inspection of feeders• Ground line pole inspection, treatment, reinforcement and
replacement• Underground cable testing & diagnostics• Cable rehabilitation (silicon injection)• Capital replacement programs (poles, crossarms, cable,
etc.)• Open-wire secondary replacement• Vegetation management activities
22
Oncor Electric Delivery
• Performance Metrics developed to focus each organization on its specific activities and areas of control
• Metrics developed around design, construction, and operational items at a more “operational” level than before
• Metric owners and also data sources identified to provide ownership responsibility and consistency of data measurement & application
• Electronic “performance dashboard” developed to provide up-to-date picture of performance
• Timely reporting allows timely adjustment to developing trends as well as overall focus on organizational goals
Engineering & Construction – What Changes?Performance Metrics