ON process details (a schematic diagram/flow chart showing the project layout, ... for the...

24
ON Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District 561 205, Karnataka State.

Transcript of ON process details (a schematic diagram/flow chart showing the project layout, ... for the...

ON

Plot No. 2-D1, Obadenahalli, 3rd

Phase KIADB Industrial Area,

Doddaballapur taluk, Bangalore Rural District – 561 205, Karnataka State.

Table of Contents

1. EXECUTIVE SUMMARY

2. INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION

3. PROJECT DESCRIPTION

4. SITE ANALYSIS

5. PLANNING

6. PROPOSED INFRASTRUCTURE

7. REHABILITATION AND RESETTLEMENT (R&R) PLAN

8. PROJECT SCHEDULE & COST ESTIMATION

9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATION)

1. Executive Summary

M/s STELIS Biopharma Pvt. Ltd., is setting up a new biopharmaceutical facility to manufacture

Monoclonal Antibodies and Therapeutic Proteins.

This industry is promoted by director Shri Jeo Thomas.

The plant is proposed to construct in about 10 acres of land.

Products to be manufactured are

1. Monoclonal Antibodies

2. Therapeutic Proteins.

The Company requires 3500 KVA power connections for the proposed project. The company

also proposes to install 3 no’s DG set for standby arrangement.

The source of water is from KIADB, Internal Bore wells and outside purchase. The unit requires

about 216 KLD during the operational phase.

About 6.0 KLD of Biologically loaded effluent is generated per day from the process. Zero

discharge Effluent treatment plant along with kill system is provided. The Company proposes to

have an Effluent Treatment Plant (ETP) within the premises.

The plant locational advantages regarding the infrastructural facilities like power, water, and

roads are fully developed and connected to National Highways. This is well connected to

National Highways and Airports for Domestic and International Market.

The total estimated cost of the project is Rs. 248.00 Crores.

4

2. Introduction of the Project/ Background Information

2.1 Identification of project and project proponent

M/s STELIS Biopharma Pvt. Ltd., is located at Plot No. 2-D1, Obadenahalli, 3rd

Phase

KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District – 561 205,

Karnataka State. M/s STELIS Biopharma Pvt. Ltd. is proposing to construct biopharmaceutical

facilities to manufacture Monoclonal Antibodies and Therapeutic Proteins.

2.2 Promoters

The affairs of the company are being managed by the director Shri Jeo Thomas.

Joe Thomas

Joe has worked with Strides for over 6 years and has over 28 years’ experience in Business

Development, Strategy formulation and Global Marketing Prior to joining Strides, has held many

significant positions in The STC of India, Procter & Gamble Asia Pacific and Bio Serve

Biotechnologies. He brings broad and in-depth domain knowledge in Life Sciences (Pharma

Biotech and OTC Health) and Strategic and General Management expertise. He has held senior

leadership level positions as Regional Director for P&G’s Asia Export Operations in Singapore

and MD/COO Global in Bio Serve India/US. Joe also serves on several Management &

Advisory Boards of start-up firms to help guide their growth strategies.

He is a Post Graduate in Chemistry with a diploma in Foreign Trade. At Strides, Joe leads

initiatives for identifying future value streams and building the capability and capacity to execute

strategic business initiatives.

He is a member of the Global Leadership Council (GLC) of the Company.

2.3 Brief description and nature of the project.

The proposed project will be manufacturing Monoclonal Antibodies and Therapeutic Proteins.

The installed capacity of 10 kg per month. The proposed project aims to meet the local & global

demand for contract manufacturing & for in house consumption of microbial and mammalian

cell culture based drug substance. The facility is intended to produce bio-chemicals and

therapeutic proteins on a campaign basis and is designed to meet both USFDA and EU

regulations in addition to the regional requirements of schedule M as per Indian Standards. The

process of manufacturing bio-chemicals and therapeutic proteins are produced from raw

materials like Sodium chloride, Potassium chloride, Sodium phosphate and Potassium phosphate

etc. The industry will mainly concentrate on zero discharge of effluents.

5

2.4 Need for the project and its importance to the country and or region.

Products that are of Monoclonal Antibodies and Therapeutic Proteins will be utilized &

manufactured based on the requirement of domestic & export markets.

2.5 Export possibility

Products manufactured from this facility will be exported to cater to the requirements of

international market.

2.6 Employment Generation

Man power required for the construction of project building will be employed from nearby

places. Directly around 125 numbers of qualified, skilled and semi-skilled man power will be

recruited both on temporary and permanent basis from nearby places. Thus, the industry provides

an employment opportunity for local people.

6

3. Project Description

3.1. Type of project including interlinked and interdependent project, if any.

Not applicable

3.2. Location with coordinates.

Figure: Areal view of the proposed project site

3.3. Details of alternative sites, considered and the basis of selecting the proposed site

particularly the environmental considerations gone into should be highlighted.

Not applicable

3.4. Size & magnitude of operation

The proposed project envisages the production of following Products:

Sl. No. Products Installed capacity

1 Monoclonal Antibodies 8 kg per month

2 Therapeutic Proteins 2 kg per month

Total 10 kg per month

3.5. Project process details (a schematic diagram/flow chart showing the project layout, components of the project etc.) should be

given.

Process Flow Diagram:

8

9

10

11

12

3.6. Raw material required along with estimated quantity, likely source, marketing area

of final products, mode of transport of raw material and finished products.

Raw materials required, for the production of Monoclonal Antibodies and Therapeutic Proteins

are Sodium chloride, Potassium Chloride, Sodium phosphate, Potassium phosphate, Citric acid,

Sodium Citrate, Tris Base, Sodium Acetate, Sodium Hydroxide, Glucose and Sodium

bicarbonate etc., are procured from the local markets.

A. Raw Materials Availability and Source of Market:

Raw material availability and source of marketing will be from local market.

B. Raw Materials Requirement

S.No. Raw Materials Details Quantity per Annum, Kgs.

1 Sodium chloride 3358

2 Potassium Chloride 3

3 Sodium phosphate 80

4 Potassium phosphate 3

5 Citric acid 182

6 Sodium Citrate 416

7 Tris Base 659

8 Sodium Acetate 210

9 Sodium Hydroxide 700

10 Glucose 160

11 Sodium bicarbonate 80

12 Pluronic F68 40

13 Protien Free Media 640

14 L-Glutamine 12

15 Sorbitol 200

16 Ethanol 1200

17 Phosphoric Acid 12

18 Acetic Acid 14

19 Hydrochloric acid 210

3.7. Resource optimization/recycling and reuse envisaged in the project, if any, should be

briefly outlined.

The resource that are recycled and reused are shown in the above process details i.e., in material

balance.

14

3.8. Availability of water its source, Energy/power requirement and sources should be

given.

Water Requirement

The main source of water is from KIADB, In house bore well supply & outside purchase. The

unit requires about 216 KLD for its manufacturing and other activities.

Power Requirement

The Company requires 3500 KVA Electrical power and HSD is used in DG set. The company

also proposes to install 3 no’s DG set of capacity 1500 KVA.

3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their

Management/disposal.

Quantity of water requirement and waste water generated from the proposed project activity is

listed below

ETP will be designed for 125KLD. Total solid waste generated from the ETP as sludge is about

75 Kgs /day will be reused as manure for greenbelt development. The Biologically loaded

effluent generated per day is 6 KLD.

3.10. Schematic representations of the feasibility drawing which give information of EIA

purpose

Not Applicable

Activity Water requirement

KLD

Wastewater Quantity in

KLD

Process Water 10.000 8.500

Washings 90.000 66.000

Boiler/ Cooling tower 56.000 8.000

Domestic 10.000 9.000

RO Reject 50.000 --

Total 216.000 91.500

15

4. Site Analysis

4.1. Connectivity

The project site is located at Plot no: 2-D1, 3rd

Phase Industrial area, Obadenahalli,

Doddaballapur taluk, Bangalore rural district. It is 3.92 Km away from Doddaballapur towards

NW direction. The excess road of the site is connected to Nagadenahalli road which is connected

to NH- 207 in North direction and nearest highway is National Highway-207 at a distance of

1.06 Km towards North direction. Doddaballapur Railway Station is 3.09 Km towards West

direction from the proposed project site. Obadenahalli is at a distance of 0.21 Km towards SW

direction from the project site. Hence, no new routes or alterations are required in this regard.

4.2. Land form, land use and land ownership

The proposed project is located in Obadenahalli village nearer to Doddaballapur taluk. M/s

STELIS Biopharma Pvt. Ltd. has purchased the industrial area plot from KIADB.

4.3. Topography (along with map)

The Doddaballapur taluk is bounded by Tumakuru district on NW direction, Bangalore district

on South direction, Chikkaballapura district is at NE direction and Kolar district on SE direction.

The Doddaballapur lies at a distance of 27.6 kms from the Bangalore rural district. The ground is

mostly of rocky upland, plateau and flat- topped hills at an elevation of about 900m above MSL.

16

Figure: Location of the proposed project site with 10Km radius demarcation on topo sheet

4.4. Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including

area under CRZ), shortest distances from the periphery of the project to periphery of the

forest, national parks, wild life sanctuary, eco sensitive areas, water bodies (distance from, the

HFL of the river)). In case of notified industrial area a copy of the Gazette notification should

be given.

Salient features Distance in Km

Obadenahalli 0.21 (SW)

Doddaballapur Railway Station 3.09 (W)

National Highway- 207 1.06 (N)

17

4.5. Existing Infrastructure

The proposed project is well connected by road. The approach road to the project site is National

Highway- 207. Water supply to the proposed project is from KIADB, in house bore well, outside

purchase. Electrical demand is from KPTCL and DG set will be used during the power cuts &

plant requirements. M/s STELIS Biopharma Pvt. Ltd. has a land comprising of following blocks:

1. Production block - Drug Product Formulation (DP block).

2. Ware house.

3. Utility.

4. Reception & lobby.

5. Canteen.

6. Security & Gate office.

7. Others- ETP, Tank farm area, Electrical substation & Fuel storage etc.

4.6. Climatic data from secondary sources

The climate in Doddaballapur district has max temperature is 33.50C and min. temperature is

150C. The Doddaballapur district receives lowest rainfall is 754 mm.

4.7. Social Infrastructure available

The approach road to the project site is NH- 207 which is in the North direction. KPTCL will

provide electricity to the industrial area & water requirement in the area is utilized from KIADB,

in house bore well & outside purchase. Government Hospital, Police Station, Fire Station,

Schools and Colleges are available at Doddaballapur which is located at 3.92 Km towards NW

direction from the proposed project site.

18

5. Planning

5.1. Planning concept (type of industries, facilities, transportation, etc.,) Town and

Country Planning Development authority classification.

The proposed project is M/s STELIS Biopharma Pvt. Ltd. manufacturing industry. Qualified and

Skilled man power is available in and around Doddaballapur & Bangalore both on permanent

and temporary basis. The company is planning to have good team of employees in all areas.

Looking in to long term planning, company will take all the necessary steps to develop a good

team of work force. The company will provide basic amenities to staff & employees.

The company will organize training classes for all the staff in the areas of Process up gradation,

Quality Control, cost reduction techniques, Environment & Safety aspects etc.

5.2. Population Projection:

Around 125 numbers of Qualified, Skilled and Semi-Skilled persons are employed in the

operation of proposed project. Hence, the population inflation in the area is negligible.

5.3. Land use planning

No. Type of Land Use Land Area in

Sq. mtrs

1 Actual Plinth Coverage (DP &

DS Block, Utilities, etc.) 12773.11

2 Actual Landscape 18849.29

3 Parking Area 1766.00

4 Internal Road 6294.00

5 Internal Pathways 790.60

Total Area 40473.00

5.4. Assessment of infrastructure Demand (Physical & Social).

There will not be any negative effect on the living conditions of people. Due to project activities,

the surrounding areas are expected to improve by way of socio-economic development due to

direct and indirect employment and the project will also lead to supporting utilities by improving

job & business opportunities in the locality.

19

5.5. Amenities/facilities

The company will provide all basic amenities to staff & employees such as Medical Health,

Children education, transport, canteen facility, clothing, family welfare etc. as per policy of the

company.

20

6. Proposed Infrastructure

6.1. Industrial Area (Processing area)

No. Type of Land Use Land Area in Sq.

mtrs.

1 DS Block (Ware House) 3500.00

2 DP Block 4442.70

3 Utility Block 835.11

4 Reception & Lobby 445.00

5 Canteen 881.70

6 Security & Gate Office 172.80

7 Others (ETP, Tank farm area,

Electrical substation & Fuel storage) 2495.80

8 Actual Landscape 18849.29

9 Parking Area 1766.00

10 Internal Road 6294.00

11 Internal Pathways 790.60

Total Area 40473.00

6.2. Residential Area (non-processing area)

No housing is provided with in the proposed project site.

6.3. Green Belt

Green belt with selected perennial plant species like Mango, Sapota, Custered, Coconut, Neem

tree, Lawn etc., are grown in and around the site.

6.4. Social Infrastructure

The proposed project is a located in KIADB industrial area, Obadenahalli village, Doddaballapur

taluk having good infrastructure facility.

6.5. Connectivity Traffic and Transportation Road/Rail/Metro/Water ways etc.

The project site is located in Obadenahalli Village, Doddaballapur taluk, Bangalore. It is 3.92

Km away from Doddaballapur. The approach road to the proposed site is Obadenahalli road at a

21

distance of 0.21 Km towards SW direction and National Highway- 207 is at 1.06 Km in North

direction. Doddaballapur Railway Station is 3.09 Km towards West direction from the proposed

project site. Obadenahalli is well connected to the major destinations by road. Hence, no new

routes or alterations are required in this regard.

6.6. Drinking Water management (Source & Supply of water)

The source of water is from KIADB, In house bore well, outside purchase. 10 KLD of water will

be provided for domestic purpose.

6.7. Sewerage System

About 9 KLD of waste water is generated from domestic purpose which is sent to the STP for

further treatment.

6.8. Industrial waste management

The industry shall adopt and follow an environmental management plan for abatement of

pollution and overall enhancement of the quality of environment in and around the unit. It is

mainly concentrating for zero discharge of effluents is concerned.

About 6 KLD of domestic & biological effluent is generated from process and domestic effluent

and it will be sent to Effluent Treatment Plant (ETP) for further treatment. Treated effluent will

be reused for land scape & green belt development.

6.9. Solid waste management

Solid waste shall collected & stored in HDPE drums and disposed to TSDF facility.

6.10. Power requirement & Supply/Source

The company requires 3500 KVA Power connection for the proposed project and the same will

be arranged by KPTCL. The company is also proposing to install 3 no’s DG set of 1500 KVA as

standby.

22

7. Rehabilitation and Resettlement (R&R) Plan

7.1. Policy to be adopted (Central/State) in respect of the project affected persons

including home oustees, land oustees, and landless labourers (a brief outline to be given).

Not applicable, since M/s STELIS Biopharma Pvt. Ltd. has purchased the property in KIADB

industrial area from KIADB for manufacturing Monoclonal Antibodies and Therapeutic

Proteins.

23

8. Project Schedule & Cost Estimation

8.1. Project Schedule

The company is planning to procure ancillary machinery and have its trial production in June,

2017. The commercial production is planned to start from Aug 2017.

8.2. Cost Estimates

The estimated cost of the project is Rs. 248 Crores. Investment breakups of the proposed project

are tabulated below:

Description Amount ( In Rs. in Lakhs )

Land & Building 680.00

Plant and Machinery 1550.00

Working capital margin & Contingencies 160.00

Capital Investment 2480.00

24

9. Analysis of proposal (Final recommendation)

9.1. Financial and social benefits with special emphasis on the benefit to the local people

including tribal population, if any, in the area.

Qualified and skilled man power is available in nearby places, both on temporary and permanent

basis.

The company is planning to have good team of employees in all areas. Looking in to long term

planning, company will take all the necessary steps to develop a good team of work force. The

company will provide all basic amenities to staff & employees such as Medical Health, Children

education, transport, canteen facility, clothing, family welfare etc. as per policy of the company.

The company will organize training classes for all the staff in the areas of process up gradation,

quality control, cost reduction techniques, environmental safety, etc.