On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

34
On-line Sorting Technologies for CCA Treated Wood July 9, 2001

Transcript of On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

Page 1: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

On-line Sorting Technologies for CCA Treated Wood

July 9, 2001

Page 2: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

Objective

To design and implement an automated system to effectively sort CCA-treated wood from other wood types at C&D facilities

Page 3: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

Project Tasks

Task 1: Construct Shelter

Task 2: Construct Conveyor

Task 3: Lab Test and Develop Detector

Task 4: Install and Field Test Conveyor & Detector

Task 5: Operate Sorting System and Document Performance

Page 4: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

Description 2000 2001

M A M J J A S O N D J F M A M J J A S

Task 1: Construct Shelter X

Task 2 Construct Conveyor X

Task 3: Develop Detector X X

Task 4: Install/Test X

Task 5: Operate X

Environ. Cert. & Scope X

Progress Reports X X X X

Final Report X

Page 5: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

SHELTER

Page 6: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

Participants

• Metal shelter design, fabrication and assembly – Trident

• Concrete slab design – Sarasota County• Concrete form, control room – Meyer and

Gabbert• Concrete pour, anchor bolts and project

management – Anderson and Ellis• Electrical – Claxton Electric

Page 7: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

Pull permit, construct concrete

form, electrical

Permit Review by BDAnd Zoning

6 Wks

1.5 Wks

1 Wk

Pour concrete and allow for curing

Permit application completed and submitted to building department (BD)

Delivery and assembly of

shelter

Schedule and Timeline

October

18 25

November

9 16 30

December

8 18 30

2+ WksPull permit,

construct concrete form

Permit Review by BDAnd Zoning

6 Wks

3 Wks

1 Wk

Pour concrete and allow for curing

Permit application completed and submitted to building department (BD)

Delivery and assembly of

shelterSchedule and Timeline

October

18 25

November

9 16 30

December

8 21 27 29

3 days

January 2001

5 8

Electrical conduits installed

***Control room and final electrical wiring installed on January 23, 2001

Page 8: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

Shelter Completed in January 2001• Interior control room built with recycled

materials (from on-site) by Meyer and Gabbert

• Electrical installation will continue with wiring for conveyor and control room

Page 9: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.
Page 10: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.
Page 11: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.
Page 12: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.
Page 13: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.
Page 14: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

Control Room

Page 15: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.
Page 16: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

Control Room

Page 17: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

CONVEYOR

Page 18: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

CCA-TREATED

WOOD

INCLINE CONVEYOR

OT

HE

R W

OO

DT

YP

ES

RO

L L- OF

F

30’2.5’

4.5’2.5’10’10’26’

5’

10.5’ Horizontal Guideto Align Wood

1’

Electric Panel for Conveyor

ROLLERCONVEYOR

BELTCONVEYOR

40’

North

IncomingMixed Wood

SPUR CONVEYOR

7’

Roof SupportColumn

10’45o

4’

Shear Arm

Conveyor Layout: February 6, 2001

ControlRoom

Page 19: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

Conveyor – Cross Section

Ta b le Ro lle r C o nve yo r Be lt C o nve yo rInc line d

Be lt C o nve yo r

Ro ll-o ff

12 ’

305’ 10’ 15’

3 ’

O

XRF De te c to r

La se rC o nve yo r, 5’ wid e

Page 20: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.
Page 21: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.
Page 22: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

Removable Roller

Spur Conveyor

Mounting For Shear Arm

Page 23: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.
Page 24: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

Wood Sort

• Pallet Study 100 pallets tested and 0 were CCA-treated

• Wood Sort3 construction piles and 1 demolition piles were sorted

Page 25: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

Wood Sort

Page 26: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

Wood Sort

Page 27: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.
Page 28: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.
Page 29: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.
Page 30: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

Waste Pile 1

Page 31: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

Waste Pile 2

Page 32: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

Waste Pile 3

Page 33: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

Waste Pile 4

Page 34: On-line Sorting Technologies for CCA Treated Wood July 9, 2001.

DETECTORS

laser

x-ray