    Prof. Raza KhanOperations ManagementLecture 41

    Operations

    Management

    Quick ResponseManufacturing/Management

  • 8/13/2019 OM Lec8 Quick Respose Manufacturing System

    2/14

    Prof. Raza KhanOperations ManagementLecture 42

    What is Quick Response

    Manufacturing?Recently popularized strategy of Time BasedCompetition (TBC)

    Using speed to gain competitive advantage

    Can be applied to any business (banking, insurance,hospitals, )

    Our focus is on Manufacturing companies This specific application of TBC is called

    Quick Response Manufacturing (QRM)

  • 8/13/2019 OM Lec8 Quick Respose Manufacturing System

    3/14

    Prof. Raza KhanOperations ManagementLecture 43

    What is Quick Response

    Manufacturing (contd)Quick Response Manufacturing implies Rapid development and introduction of new products

    Rapid delivery of existing products

    Potential for Reduction of Lead Times for allactivities

    50%, 75% or even 90% reduction!

    Opportunitiesand Challenges!

  • 8/13/2019 OM Lec8 Quick Respose Manufacturing System

    4/14

    Prof. Raza KhanOperations ManagementLecture 44

    Benefits of Quick Response

    InnovationShorter lead times to bring new products to market has many

    advantages:

    Beating the competition to market

    Hitting the market at the same time but with newer technology

    Plus doing it in less time with fewer resources!

    Concept MarketCompetition

    QRM CompanyConcept Market

    2010 20122011

    Concept Market Competition

    QRM CompanyConcept Market

    2010 20122011

  • 8/13/2019 OM Lec8 Quick Respose Manufacturing System

    5/14

    Prof. Raza KhanOperations ManagementLecture 45

    Benefits of Quick Response

    ProductionAim is to shorten Lead Times to manufacture existing

    products. Why is shortening lead times key tocompetitiveness?

    Obvious reasons: Fast response when customers have urgent need

    Happy customers mean more business

    Less obvious, but Fundamental Reason:Group Workshop

    What are all the types of Waste in the system (whole system)due to (because) of long lead times?

  • 8/13/2019 OM Lec8 Quick Respose Manufacturing System

    6/14

    Prof. Raza KhanOperations ManagementLecture 46

    The QRM Detective Learning one question to ask

    Results of asking the question

    Hence, less obvious but fundamental reason forimplementing QRM Higher quality, lower WIP, more productivity

    Elimination of all forms of waste

    Improved integration of processes, and better work environment

    Lower total operating cost

    Key Idea: Searching for ways of squeezing out time leads to all theimprovements

    Benefits of Quick Response

    Production (contd)

  • 8/13/2019 OM Lec8 Quick Respose Manufacturing System

    7/14

    Prof. Raza KhanOperations ManagementLecture 47

    Results of QRM Strategy Companies become formidable competitors!

    Typical Sales Pitch: Well deliver the product that you want (customized)

    Well deliver it faster than anyone else

    Well beat or match anyone elses price

    Our quality will be second to none

    There is no room for competition to get in!

    Typical Financial Results: Growth Rate: three times the average for that

    industry

    Profitability: twice the average for that industry

  • 8/13/2019 OM Lec8 Quick Respose Manufacturing System

    8/14

    Prof. Raza KhanOperations ManagementLecture 48

    QRM Principle

    Requires major organizational restructuring

    Why?

    Need to understand how most companiesare organized today

    QRM Principle:

    Find whole new ways of completing a job, with a

    primary focus on minimizing lead time

  • 8/13/2019 OM Lec8 Quick Respose Manufacturing System

    9/14

    Prof. Raza KhanOperations ManagementLecture 49

    The Response Time Spiral in Office

    Operations Long LeadTimes

    Inaccuracy in

    Planning

    Safety Time

    Inserted

    Large No. of

    Active Projects

    Hot Job

    Expediting

    Regular Jobs

    Delayed

    Depts. Need to

    Plan Ahead

    Past Performance

    Problems

    Loss of FocusUnacceptable Lead

    Times, or Planning

    Errors

    Additional Loss of

    Focus

  • 8/13/2019 OM Lec8 Quick Respose Manufacturing System

    10/14

    Prof. Raza KhanOperations ManagementLecture 410

    Eliminating the Spiral Cant be controlled: must be killed!

    Focus on reducing the consumption of time

    throughout the system

    Requires major paradigm shift in managementthinking

    QRM Principle:Find whole new ways of completing a job,

    with a primary focus on minimizing lead time

    Cost-Based Time-Based

  • 8/13/2019 OM Lec8 Quick Respose Manufacturing System

    11/14

    Prof. Raza KhanOperations ManagementLecture 411

    Cost Based ThinkingMinimizeCost

    Break into simple

    (specialized) steps

    Low Skills,

    Low Wages

    Functional

    Departments

    Managers

    Minimize Cost

    Minimize Resources,

    Maximize Efficiency,

    Maximize Utilization

    Ensure Backlog,

    Batching

    Long FeedbackLoops,

    Backtracking,

    Expediting

    Poor Quality,

    Long Lead Times!

    High Cost

  • 8/13/2019 OM Lec8 Quick Respose Manufacturing System

    12/14

    Prof. Raza KhanOperations ManagementLecture 412

    Seven Key Principles for RestructuringYour Company for Quick Response

    1. Organization Functional Product-Oriented

    Locate all resources

    needed to complete a

    given product together:

    Work cells

    2. Structure Hierarchical,Multi-Level

    Flat, Multi-

    TeamMany Cell-based

    teams

    3. TeamMembers

    Narrow,Specialized

    Cross-Trained

    Skills needed toperform multiple

    tasks in their cell

  • 8/13/2019 OM Lec8 Quick Respose Manufacturing System

    13/14

    Prof. Raza KhanOperations ManagementLecture 413

    Key Principles (contd)4. Management Top down

    Control

    Team

    Ownership

    Ownership of entire

    delivery process by cell-

    based teams

    5. Scheduling Complex,Centralized Simpler,Local

    Teams take

    responsibility forplanning and

    scheduling their

    resources and jobs

    6. Flow Goal isEfficiency

    Keep jobs

    moving

    Move jobs to

    next operation as

    soon as

    completed

    7. Improvement LocalizedEffects

    System-

    wide Effects

    Teams now

    discover ways to

    reduce lead time,

    improve quality

    and productivity

  • 8/13/2019 OM Lec8 Quick Respose Manufacturing System

    14/14

    Prof. Raza KhanOperations ManagementLecture 414

    QRM Principle Organize around main sequence of processing steps

    needed to serve the FTMS (Focused Target MarketSub-segment)

    Create a Quick Response Office Cell (Q-ROC)warning: do not re-organize entire company atonce. Q-ROC: A closed loop, co-located, multi-functional, cross-

    trained team that can complete all the processes needed for theproduct.

    This is office version of a cell