Theme: Theme:
Planning for ExhibitPlanning for ExhibitDesign andDesign and
Construction forConstruction for
Glasgow ScienceGlasgow ScienceCentre.Centre.
8/8/2019 Olympics games-group 2(corrected)
http://slidepdf.com/reader/full/olympics-games-group-2corrected 3/12
Topic: Topic:Planning for the Design andPlanning for the Design and
Construction of an InteractiveConstruction of an Interactive
Dynamo.Dynamo.
ByBy A hmadu Dabai Ibrahim(200811790) A hmadu Dabai Ibrahim(200811790)
Ebede Sylvester O.(200812115)Ebede Sylvester O.(200812115)IbnIbn--Mohammed, Taofeeq(200811248)Mohammed, Taofeeq(200811248)
Ojukonsin Tebe Larry(200811261)Ojukonsin Tebe Larry(200811261)
8/8/2019 Olympics games-group 2(corrected)
http://slidepdf.com/reader/full/olympics-games-group-2corrected 4/12
8/8/2019 Olympics games-group 2(corrected)
http://slidepdf.com/reader/full/olympics-games-group-2corrected 5/12
Item Selection .Item Selection .
Is it interactive?
Is it informative?
Is it entertaining?
Does it reflect principles of
Engineering and Ph ysical
Sciences?
Is it safe?
Choose Item for Exhibit
Is it Robust?
Y es
Y es
Y es
Y es
Y es
No
No
No
No
No
No
Item selected
Y es
8/8/2019 Olympics games-group 2(corrected)
http://slidepdf.com/reader/full/olympics-games-group-2corrected 6/12
Sequence of Operation.Sequence of Operation.
Visitor Approaches Exhibit.
Visitor turns handle.
Exhibit Senses Visitor.
Sound System asks Visitor If Interested in more demonstrations.
Sound System explains the output of the
Dynamo as displayed on the Display Unit and Light Bulb.
Sound system prompts Visitor to turn Dynamo handle.
Human Machine Interface is triggered.
The visitor is welcomed by the
exhibit and asked if interested
in the demonstration.
Demonstrationends.
Y es
No
No
8/8/2019 Olympics games-group 2(corrected)
http://slidepdf.com/reader/full/olympics-games-group-2corrected 7/12
System Block Diagram.System Block Diagram.
Human
Machine
Interface
Human
Sensor
Dynamo/Motor
Micro
Controller
Display
Unit
Voice codec/
Speaker
8/8/2019 Olympics games-group 2(corrected)
http://slidepdf.com/reader/full/olympics-games-group-2corrected 8/12
8/8/2019 Olympics games-group 2(corrected)
http://slidepdf.com/reader/full/olympics-games-group-2corrected 9/12
Work Breakdown Structure Work Breakdown Structure
Budget
Conception Construction Installation Documentation
Signage guideline
Interactive Dynamo
8/8/2019 Olympics games-group 2(corrected)
http://slidepdf.com/reader/full/olympics-games-group-2corrected 10/12
Activity Lists Activity Lists
Define Concept.Define Concept.
Develop System Block diagram.Develop System Block diagram.
Detailed Engineering Design.Detailed Engineering Design.
Design Stator, Rotor , CommutatorDesign Stator, Rotor , Commutatorand Brushes.and Brushes.
Design the Sensors, Control unitDesign the Sensors, Control unitand Humanand Human--MachineMachineInterface(HMI)Interface(HMI)
Design display unit and RotatingDesign display unit and Rotatinghandle.handle.
Design of Audio Systems and voiceDesign of Audio Systems and voicecodec.codec.
Write algorithm/pseudo-codes forthe controller.
Select programming lang. write andSelect programming lang. write anddebug program.debug program.
Design Frame Work/Casing.Design Frame Work/Casing. Design Low voltage power supplyDesign Low voltage power supply
unit.unit.
Check design deliverables forCheck design deliverables forconformity with various standards.conformity with various standards.
Prepare bill of materials.Prepare bill of materials.
Conception Detail Engineering Design
8/8/2019 Olympics games-group 2(corrected)
http://slidepdf.com/reader/full/olympics-games-group-2corrected 11/12
Activity Lists cont·d Activity Lists cont·d
Construction of all ElectricalConstruction of all Electricalcomponents and windings tocomponents and windings tospecification.specification.
Construction of all ElectronicConstruction of all Electroniccomponents and control units tocomponents and control units to
specificationspecification Burn program into controller forBurn program into controller for
control and voice messagescontrol and voice messages
Construct all Mechanical partsConstruct all Mechanical partsto Specificationsto Specifications
Construct Framework andConstruct Framework and
supportssupports Finishing/ Quality checksFinishing/ Quality checks
Assembling/ Integration of Assembling/ Integration of units/ Testing/Correctionsunits/ Testing/Corrections
Prepare all documentationsPrepare all documentations(electronic/hard copy and back (electronic/hard copy and back--up)up)
Prepare signage guideline.Prepare signage guideline.
Prepare base for gadget exhibition.Prepare base for gadget exhibition. Transport/couple Gadget to base Transport/couple Gadget to base
Display of signage guidelinesDisplay of signage guidelines
Construction. Documentation.
Signage Guidelines
Installation.
8/8/2019 Olympics games-group 2(corrected)
http://slidepdf.com/reader/full/olympics-games-group-2corrected 12/12
Project Planning Tools:Project Planning Tools:
Activity Precedence Table Activity Precedence Table
Network DiagramNetwork Diagram
Gantt ChartGantt Chart
Critical Path MethodCritical Path Method
Critical Path DiagramCritical Path Diagram
CrashingCrashing
Cost AnalysisCost Analysis
LevellingLevellingMicrosoft Office