OLYMPIAPARK MÜNCHEN

download OLYMPIAPARK MÜNCHEN

of 15

Transcript of OLYMPIAPARK MÜNCHEN

  • 7/27/2019 OLYMPIAPARK MNCHEN

    1/15

    OLYMPIAPARK MNCHENVenue of 1972 Summer Olympics, Munich, Germany.

    Submitted by :Aravind Bachu 10110007Hanan Qureshi 10110022

  • 7/27/2019 OLYMPIAPARK MNCHEN

    2/15

    Munich had the obligation tohost a Green Olympics for1972.

    The Site was a Ex-NaziSlaughterhouse.

    The new Stadia was toovershadow the previous

    memories of the 1936Olympics held in Germany

    under Hitlers Regime.

  • 7/27/2019 OLYMPIAPARK MNCHEN

    3/15

    The eye-catching TensileRoof Structure, covering theentire park was designed by

    Frei Otto

    MasterPlan by :Gnther Behnisch

    The Stadia is well-connectedwith the German Auto-Bahn.

  • 7/27/2019 OLYMPIAPARK MNCHEN

    4/15

    The Structure is based on a cable net pulled into shape by cables attached to large hollow s

    on 35m deep concrete foundations.

  • 7/27/2019 OLYMPIAPARK MNCHEN

    5/15

    Originally Constructed tohost 80,000 Spectators, it

    was later reduced to 69,000by 1990.

    It was the home ofBayern Munich FC

  • 7/27/2019 OLYMPIAPARK MNCHEN

    6/15

    The 291m Tall Olympiaturm was the broadcast tower. It has an observation deck at 190m a

    restaurant.The 1972 Munich Olympics were the first one to be broadcasted in colour

  • 7/27/2019 OLYMPIAPARK MNCHEN

    7/15

    The 4mm Plexi Glass sheet roof is attached directly to the cable net grid by flexible neopren

    100mm long. The whole roof behaves like a trampoline.

  • 7/27/2019 OLYMPIAPARK MNCHEN

    8/15

    The plexi-glass sheets currently in use were put in during a refurbishment in 1994-99, and wer

    as 3m x 3m sheets which were then cut to size in-situ.

  • 7/27/2019 OLYMPIAPARK MNCHEN

    9/15

    The interior space is defined by a tensile membrane that hangs about 1m below the cable net

    from curtain walling supported by exterior space-frames.

    The connection between the membrane roof and the curtain walling needs to be flexible eno

    movement of the cable net, and is provided by an ETFE cushion.

  • 7/27/2019 OLYMPIAPARK MNCHEN

    10/15

    These Pictures show the fixtures used in holding

    the panels together.

    The thinness of the plexi-glass combined with the

    flexible movement joints allow the cladding to

    move as the structure moves with wind, snow and

    thermal expansion loading.

    The steel columns rest on rubber lined ball and

    socket joints, allowing them to move freely inevery direction.

    Up to 1m flexibility is offered upon Snow-Loading.

  • 7/27/2019 OLYMPIAPARK MNCHEN

    11/15

    Munich Schwimmhalle :

    This pool is built completelyunder a tensile roof

    Structure.

    It was witness to Mark Spitzsrecord 7 Gold Haul.

    The Cobbled path leading toseating area is its notable

    feature.

  • 7/27/2019 OLYMPIAPARK MNCHEN

    12/15

    After the opening of Allianz Arena in 2005, Olympiapark is being exclusively used only for

    This file photo shows Michael Jacksons History Concert atOlympiaPark in 1

  • 7/27/2019 OLYMPIAPARK MNCHEN

    13/15

    Darkest Moment:

    11 Israeli athletes were murdered by the Palestinian terrorist group Black Septe

    Munich Olympiapark had a Open Layout in athlete village to foster friendship among athletes

    memories.This Photo shows the 80,000 mourners who turned up for the deceased at Olym

  • 7/27/2019 OLYMPIAPARK MNCHEN

    14/15

    Credits :

    WeWantToLearn.wordpress.com Arch Daily

    Wikipedia

    Flickr and Google Images

    International Olympic Council

  • 7/27/2019 OLYMPIAPARK MNCHEN

    15/15

    Thank You.