OLYMPIAPARK MÜNCHEN
-
Upload
aravind-bachu -
Category
Documents
-
view
220 -
download
0
Transcript of OLYMPIAPARK MÜNCHEN
-
7/27/2019 OLYMPIAPARK MNCHEN
1/15
OLYMPIAPARK MNCHENVenue of 1972 Summer Olympics, Munich, Germany.
Submitted by :Aravind Bachu 10110007Hanan Qureshi 10110022
-
7/27/2019 OLYMPIAPARK MNCHEN
2/15
Munich had the obligation tohost a Green Olympics for1972.
The Site was a Ex-NaziSlaughterhouse.
The new Stadia was toovershadow the previous
memories of the 1936Olympics held in Germany
under Hitlers Regime.
-
7/27/2019 OLYMPIAPARK MNCHEN
3/15
The eye-catching TensileRoof Structure, covering theentire park was designed by
Frei Otto
MasterPlan by :Gnther Behnisch
The Stadia is well-connectedwith the German Auto-Bahn.
-
7/27/2019 OLYMPIAPARK MNCHEN
4/15
The Structure is based on a cable net pulled into shape by cables attached to large hollow s
on 35m deep concrete foundations.
-
7/27/2019 OLYMPIAPARK MNCHEN
5/15
Originally Constructed tohost 80,000 Spectators, it
was later reduced to 69,000by 1990.
It was the home ofBayern Munich FC
-
7/27/2019 OLYMPIAPARK MNCHEN
6/15
The 291m Tall Olympiaturm was the broadcast tower. It has an observation deck at 190m a
restaurant.The 1972 Munich Olympics were the first one to be broadcasted in colour
-
7/27/2019 OLYMPIAPARK MNCHEN
7/15
The 4mm Plexi Glass sheet roof is attached directly to the cable net grid by flexible neopren
100mm long. The whole roof behaves like a trampoline.
-
7/27/2019 OLYMPIAPARK MNCHEN
8/15
The plexi-glass sheets currently in use were put in during a refurbishment in 1994-99, and wer
as 3m x 3m sheets which were then cut to size in-situ.
-
7/27/2019 OLYMPIAPARK MNCHEN
9/15
The interior space is defined by a tensile membrane that hangs about 1m below the cable net
from curtain walling supported by exterior space-frames.
The connection between the membrane roof and the curtain walling needs to be flexible eno
movement of the cable net, and is provided by an ETFE cushion.
-
7/27/2019 OLYMPIAPARK MNCHEN
10/15
These Pictures show the fixtures used in holding
the panels together.
The thinness of the plexi-glass combined with the
flexible movement joints allow the cladding to
move as the structure moves with wind, snow and
thermal expansion loading.
The steel columns rest on rubber lined ball and
socket joints, allowing them to move freely inevery direction.
Up to 1m flexibility is offered upon Snow-Loading.
-
7/27/2019 OLYMPIAPARK MNCHEN
11/15
Munich Schwimmhalle :
This pool is built completelyunder a tensile roof
Structure.
It was witness to Mark Spitzsrecord 7 Gold Haul.
The Cobbled path leading toseating area is its notable
feature.
-
7/27/2019 OLYMPIAPARK MNCHEN
12/15
After the opening of Allianz Arena in 2005, Olympiapark is being exclusively used only for
This file photo shows Michael Jacksons History Concert atOlympiaPark in 1
-
7/27/2019 OLYMPIAPARK MNCHEN
13/15
Darkest Moment:
11 Israeli athletes were murdered by the Palestinian terrorist group Black Septe
Munich Olympiapark had a Open Layout in athlete village to foster friendship among athletes
memories.This Photo shows the 80,000 mourners who turned up for the deceased at Olym
-
7/27/2019 OLYMPIAPARK MNCHEN
14/15
Credits :
WeWantToLearn.wordpress.com Arch Daily
Wikipedia
Flickr and Google Images
International Olympic Council
-
7/27/2019 OLYMPIAPARK MNCHEN
15/15
Thank You.