Offshore Wind Energy Kentish Flats Extension Göran Loman
description
Transcript of Offshore Wind Energy Kentish Flats Extension Göran Loman
1 | A Greener Economy | Göran Loman | 2011.02.23
Offshore Wind EnergyKentish Flats ExtensionGöran Loman
Environment Conference, CanterburyA Greener Economy: Time for a Change?
February 23, 2011)
2 | A Greener Economy | Göran Loman | 2011.02.23
Agenda
• Vattenfall
• Wind power technology
• Kentish Flats
• Kentish Flats Extension
- Technical data
- Environmental impact
- Consenting process
- Programme
3 | A Greener Economy | Göran Loman | 2011.02.23
VATTENFALL
4 | A Greener Economy | Göran Loman | 2011.02.23
Vattenfall
Key facts• Owned by the Swedish State• Business
- Electricity: generation, transmission, distribution and sales
- Heat: production, distribution and sales
- Gas: distribution and sales
- Consulting and contracting activities in the energy sector
• Market
- Sweden, Denmark and Finland
- Germany, the Netherlands and Belgium
- The United Kingdom
• Wind power is a cornerstone of Vattenfall’s action on climate change
5 | A Greener Economy | Göran Loman | 2011.02.235
Vattenfall in the UK
• Acquired 90MW Kentish Flats through Elsam merger in 2005
• Acquired AMEC Wind Energy in November 2008
• Acquired Thanet Offshore Wind Energy in November 2008
• Acquired Eclipse Energy in November 2008
• Merger with Nuon in July 2009
6 | A Greener Economy | Göran Loman | 2011.02.23
WIND POWER
In fact it is quite easy
7 | A Greener Economy | Göran Loman | 2011.02.23
The kinetic energy of the wind
Pkin = 0,5 A v3
0
250
500
750
1 000
1 250
1 500
1 750
2 000
0 1 2 3 4 5 6 7 8 9 10
Wind speed, m/s
Po
we
r, k
W
90 ton/second!
8 | A Greener Economy | Göran Loman | 2011.02.23
Production
0%
2%
4%
6%
8%
10%
0 5 10 15 20 25Wind speed, m/s
Fre
qu
ence
0,0
0,5
1,0
1,5
2,0
2,5
3,0
3,5
0 5 10 15 20 25Wind speed, m/s
Po
wer
, MW
Weibull distribution Produktion curve
9 | A Greener Economy | Göran Loman | 2011.02.23
Wind resource, regional and local aspects
100%
125%
75%
Production
0
500 000
1 000 000
1 500 000
2 000 000
01-01-2011 08-01-2011 15-01-2011 22-01-2011 29-01-2011
Dai
ly p
rod
uct
ion
, kW
h
10 | A Greener Economy | Göran Loman | 2011.02.23
Park effects and vertical wind gradient
Vertical wind gradient
0
20
40
60
80
100
120
0,0 2,0 4,0 6,0 8,0 10,0
Wind speed, m/s
Le
ve
l a
bo
ve
su
rfa
ce
Hav
Jordbruk
11 | A Greener Economy | Göran Loman | 2011.02.23
KENTISH FLATS AND THE EXTENSION
12 | A Greener Economy | Göran Loman | 2011.02.2312
Kentish Flats
History
• Was completed in August 2005• At completion, the largest wind farm in the UK• Production corresponds to the consumption of
61,000 average households
Kentish Flats – Key Data
Rated power 90 MW (30 x 3.0MW)
Electricity generation 235 GWh/year
Location – Coast of Kent, England
Wind turbine type (Vestas) V90 / 3.0MWHub height 70 m Rotor diameter 90 mTip height 115 mFoundation type MonopileDepth of water ≈ 5 m (LAT)Distance from shore ≈ 8.5 kmDistance between wind turbines 700 m
Some facts
13 | A Greener Economy | Göran Loman | 2011.02.2313
Kentish Flats Extension
Focal points of EIA for KF2
• Birds - red throated divers• Outer Thames Estuary SPA • Marine navigational safety• Impact to commercial fishermen• Visual impact of additional turbines
•
Additional turbines up to 17Wind turbine type under evaluationHub height up to 85 mRotor diameter up to 120 mTip height up to 135 mCapacity 51 MWProduction 145-185 MWh/a
40,000-50,000 households
Some facts
14 | A Greener Economy | Göran Loman | 2011.02.23
The IPC Process (Applying for a DCO)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
IPC
Acceptance
Pre examination
Examination
IPC recommendation
Secr of State
Decision
Legal challange
Judical Review
M o n t h s
15 | A Greener Economy | Göran Loman | 2011.02.23
Programme for Kentish Flats Extension
2010 2011 2012 2013 2014Project startPre application processApplication handlingProcurementInstallationCompleted
Partly parallel time plan
16 | A Greener Economy | Göran Loman | 2011.02.2316