www.jca.co.uk OFFICE SPACE FIT OUT LONDON “The project was demanding as it involved working in a live and fully operational building. We were pleased to see how well JCA communicated with and managed all stakeholders and how transparent their approach was. We enjoyed working with such a professional and, most importantly, knowledgeable company.” Sally Ford, Head of Facilities, MUFG Securities EMEA Plc JCA was engaged to carry out a full redesign of an occupied office space consisting of trading rooms, meeting space and vending area. Changes to the mechanical and electrical layout of the office included installation of new fan coil units, fire suppresion system and new wall partitioning. The project was completed in a live building.

Transcript of OFFICE SPACE FIT OUT - JCA Engineering · 2018-09-07 · redesign of an occupied office space...

Page 1: OFFICE SPACE FIT OUT - JCA Engineering · 2018-09-07 · redesign of an occupied office space consisting of trading rooms, meeting space and vending area. Changes to the mechanical

www. jca.co.uk

OFFICE SPACE FIT OUT

LONDON

“The project was demanding as it involved working in

a live and fully operational building. We were pleased to

see how well JCA communicated with and managed all

stakeholders and how transparent their approach was.

We enjoyed working with such a professional and, most

importantly, knowledgeable company.”

Sally Ford, Head of Facilities, MUFG Securities

EMEA Plc

JCA was engaged to carry out a full redesign of an occupied office space consisting of trading rooms, meeting space and vending area. Changes to the mechanical and electrical layout of the office included installation of new fan coil units, fire suppresion system and new wall partitioning. The project was completed in a live building.