Office of the Executive Engineer,National Highway … SET OF DEVIATION Name of Work. :- Improvement...

20
Office of the Executive Engineer,National Highway Division No. IX, Nashik. Phone No: - 0253-2573270 Email:-[email protected] No. NH-IX/AB/Tender-2/591/ 2012 Date. 07 / 07 / 2012 To, The e-tendering Tenderers SUB:- Improvement to Riding Quality of Existing Carriage way in Km 161/570 to Km. 166/000 of Kalyan Ahmadmagar Pathardi Nanded Nirmal Road N.H.222 in the State of Maharashtra System Tender No.47 REF:- Pre bid meeting held in the office Chief Engineer, National Highway (P.W.) Konkan Bhavan, Navi Mumbai on Dated 29/06/2012 at 14.00 hrs. Please find enclosed herewith CSD of the pre bid meeting held in the office of the Chief Engineer, National Highway (P.W.) Konkan Bhavan, Navi Mumbai on 29/06/2012 in pursuant to the clause 7.3 of Volume I of the bidding document for the above mentioned work. 1. The CSD issued herewith shall be part of the bidding document & the bidders are requested to submit the CSD on line along with the bidding document. 2. No any other changes in terms & condition of Bid document except that are mentioned in CSD 3. The Bidders are requested to submit their offer considering the CSD and that offers shall be unconditional. The conditional offers are liable for rejection. D.A.- Common Set Of Deviation Executive Engineer National Highway Division No. IX Nashik

Transcript of Office of the Executive Engineer,National Highway … SET OF DEVIATION Name of Work. :- Improvement...

Office of the Executive Engineer,National Highway Division No. IX, Nashik. Phone No: - 0253-2573270 Email:[email protected] No. NH-IX/AB/Tender-2/591/ 2012 Date. 07 / 07 / 2012 To, The e-tendering Tenderers SUB:- Improvement to Riding Quality of Existing Carriage way in Km

161/570 to Km. 166/000 of Kalyan Ahmadmagar Pathardi Nanded Nirmal Road N.H.222 in the State of Maharashtra System Tender No.47

REF:- Pre bid meeting held in the office Chief Engineer, National Highway (P.W.) Konkan Bhavan, Navi Mumbai on Dated 29/06/2012 at 14.00 hrs.

Please find enclosed herewith CSD of the pre bid meeting held in the office of the Chief Engineer, National Highway (P.W.) Konkan Bhavan, Navi Mumbai on 29/06/2012 in pursuant to the clause 7.3 of Volume I of the bidding document for the above mentioned work.

1. The CSD issued herewith shall be part of the bidding document & the bidders are requested to submit the CSD on line along with the bidding document.

2. No any other changes in terms & condition of Bid document except that are mentioned in CSD

3. The Bidders are requested to submit their offer considering the CSD and that offers shall be unconditional. The conditional offers are liable for rejection.

D.A.- CCoommmmoonn SSeett OOff DDeevviiaattiioonn

Executive Engineer National Highway Division No. IX Nashik

Minutes of the Pre-tender Conference held in the chamber of the Chief Engineer, N.H. (P.W.) Maharashtra Konkan Bhavan, 5th Floor, Room No. 526, Navi Mumbai on 29-06-2012 at 14.00 P.M.

Name of Work :- Improvement to Riding Quality of Existing Carriageway in Km.161/570 to Km.166/000 of Kalyan Ahmednagar Pathardi Nanded Nirmal Road N.H.222 in the State of Maharashtra. (System Tender No. 47)

1. A pre tender conference open to all prospective tenderer was held in the office of the

Chief Engineer National Highway (P.W.) Maharashtra Konkan Bhavan Navi Mumbai on

dated 29-06-2012 at 14.00 P.M. The following officers & prospective tenderer attended the

Pre-bid meeting.

The following Officers were present for the Pre-tender Conference.

Sr.N. Name of the Officer Designation

[1] Shri. P.S. Mandpe Chief Engineer National Highway (P.W.)

Konkan Bhavan,Navi Mumbai [2] Shri. K. T. Patil Executive Engineer

National Highway Division No.IX, Nashik

2. Executive Engineer, National Highway Division No.9, Nashik told in the meeting that, bidder should send their pre bid queries through online upto 22-06-2012 however one bidder send his pre bid queries and M/s. N.K.Gade, Engineer & Govt. Contractor raised their pre bid queries vide fax letter dated 29-06-2012.

3. The Representative of M/s. Best Construction Company has attended the meeting. However M/s. Best Construction Company has raised various points vide their letter dated 29-06-2012. (The points raised by M/s. Best Construction Company in writing is same as points raised through online).

4. The points raised by M/s. Best Construction Company and M/s. N.K.Gade, Engineer

& Govt. Contractor clarification given during the meeting are as under.

Point raise by M/s. Best Construction, vide their letter dated 29-06-2012

Clarification

1. ¨É¶ÉÒxÉ®úÒ {ÉÉxÉ Gò. 11, 2:1:4 |ɨÉÉhÉä 1) Dozer-2 Nos. 2) Front end Loader-1 No., 3) Water Tanker-3 Nos. , 4) Tandom Roller-1 No. +) Dozer ´É Loader Bä´ÉVÉÒ Excavator ½þÒ ¨É¶ÉÒxÉ®úÒ MÉÞʽþiÉ vÉ®úÉ´ÉÒ. ¤É) Water Tanker 3 Bä´ÉVÉÒ 1 Water Tanker MÉÞʽþiÉ vÉ®úÉ´ÉÉ EòÉ®úhÉ EòɨÉÉSÉÒ ËEò¨ÉiÉ 5 EòÉä]õÒSªÉÉ +ÉiÉ +ɽäþ. Eò) Tandom Roller SÉÒ ¶ÉiÉÇ ®úqù Eò®úÉ´ÉÒ EòÉ®úhÉ ºÉÉ<Çb÷ {É]Âõ]õªÉÉSÉä EòÉ¨É ¡òHò 1772 CªÉÖ.ʨÉ]õ®ú <iÉEäòSÉ +ɽäþ ´É ¤ÉÉ¤É ¨ÉvªÉä Vibrator Roller {ÉÉʽþVÉä +ºÉä xɨÉÚnù Eäò±Éä±Éä +ɽäþ. ¦ÉÉMÉ Gò.4 {ÉÉxÉ xÉÆ.36 ´É®ú ÊxÉnæùʶÉiÉ Eäò±Éä|ɨÉÉhÉä Vibrator Roller Ênù±Éä

It was decided that, Excavator is allowed instead of Dozer and Roller, 1 Water Tanker is allowed instead of 3 Water Tanker and condition regarding Tandom Roller is deleted and said changes will be communicated through common set of deviation .

+ɽäþ. EòÉ®úhÉ Qty.of Item H.M.1772 Cum. <iÉEòÒSÉ +ºÉ±ªÉÉxÉä Tandom Roller SÉÒ +ɴɶªÉEòiÉÉ xÉɽþÒ.

2 {ÉÉxÉ Gò. 16 ´É®ú 24:1 |ɨÉÉhÉä 15 ±ÉÉJÉ {ÉÉʽþVÉä +ºÉä xɨÉÚnù Eäò±Éä±Éä +ɽäþ, ÊxÉÊ´ÉnùÉSÉÒ ®úCEò¨É {ɽþÉiÉÉ (158 ±ÉÉJÉ) <iÉEòÒSÉ +ɽäþ. iÉ®úÒ 5 ]õCEäò ({ÉÉSÉ ]õCEäò |ɨÉÉhÉä) ¯û.5.00 ±ÉÉJÉ <iÉEòÒ Eò®úÉ´ÉÒ.

It was clarified that, if the distance of the hot mix plant is not within 40 km. the additional FDR/TDR for mobilizing of plant is applicable. And for mobilizing of plant the contractor should submit additional performance security Rs. 5.00 lakhs instead of Rs. 15 lakhs and the said changes will be communicated through common set of deviation.

Point raised through online by M/s. Best

Construction,

Clarification

3 Instead of Dozer and Loader please consider excavator Machinery.

Already clarified as above.

4 As Tender cost is within 5 crores, Instead of 3 Water Tanker consider 1 Water Tanker.

5 As work of side shoulder (Qty. 1772 CU.M) (Section-4 PG-36) in Above Item You have mention Vibratory Roller, so there is no need of Tandem Roller, so Please cancelled condition of Tandem Roller.

6 As per PG 1624:1, for Mobilizations of Plant, Required is of Rs. 15 lakhs but tender cost is Rs. only 158 lakhs, so please consider 5 lakhs only for mobilization of plant.

Point raised by M/s. N.K.Gade, Engineer & Govt. Contractor vide their letter dated

29-06-2012

Clarification

7 ´É®úÒ±É ºÉÆnùÌ¦ÉªÉ EòɨÉÉSÉä ÊxÉÊ´ÉnùÉ ¡òÉì̈ ÉÇ ¨ÉvªÉä Price Variation Clause, Applicable xÉɽþÒ {É®ÆúiÉÖ b÷Éì±É®úSªÉÉ +´É¨ÉÖ±ªÉɨÉÖ³äý ´É VÉÉMÉiÉÒiÉ +κlÉ®úiÉä̈ ÉÖ³äý EòSSªÉÉ iÉä±ÉÉSªÉÉ ËEò¨ÉiÉÒiÉÒ±É SÉfø =iÉÉ®úÉ ¨ÉÖ³äý b÷ÉƤɮúÉSÉä ´É {Éä]ÅõÉä±ÉÒªÉ¨É iÉä±ÉÉSªÉÉ ËEò¨ÉiÉÒ |ÉiªÉäEò 15 Ênù´ÉºÉɱÉÉ ¤Énù±ÉiÉ +ºÉiÉÉiÉ. iªÉɨÉÖ³äý b÷ÉƤɮúÉSÉä ®äú]õ EòÉähÉÉSªÉÉ ½þÉiÉÉiÉ xɺɱªÉɨÉÖ³äý ¦ÉʴɹªÉÉiÉ ®äú]õ ´ÉÉfø±ªÉÉºÉ +ɨ½þɱÉÉ ¨ÉÉä`öÉ iÉÉä]õÉ ½þÉä>ð ¶ÉEòiÉÉä ¨½þhÉÖxÉ ¦ÉÉ´É ´ÉÉføÒSÉÉ ¨ÉÖqùÉ ±ÉÉMÉÖ Eò®úÉ´ÉÉ Ê½þ Ê´ÉxÉÆiÉÒ..

It was decided that, 13 months (including monsoon) period for completion of work is kept instead of 9 months and the irrespective changes shall made in NIT and the said changes will be communicated through common set of deviation .

The meeting was concluded with vote of thanks.

O.C.Approved by C.E. Chief Engineer National Highway (P.W.)

Konkan Bhavan, Navi Mumbai.

COMMON SET OF DEVIATION Name of Work. :-

Improvement to Riding Quality of Existing Carriageway in Km.161/570 to Km.166/000 of Kalyan Ahmednagar Pathardi Nanded Nirmal Road N.H.222 in the State of Maharashtra. (System Tender No. 47)

Sr No NIT

Page No.

Clause /Condition/Item/Line

No. NIT Provisions

Read as

1 Vol.II Page No.3

Section –I Details of works Time Stipulated for Completion :- Nine (9) Calendar

Months which will include the monsoon period, if any. Time Stipulated for Completion :- Thirteen (13) Calendar Months which will include the monsoon period, if any.

2 Vol.II Page No.4

Tender Notification under e-

Procuremen(Ist Call) Column No.7

PPeerriioodd ooff CCoommpplleettiioonn ::-- NNiinnee ccaalleennddaarr mmoonntthhss iinncclluuddiinngg

mmoonnss00oonn..

PPeerriioodd ooff CCoommpplleettiioonn ::-- TThhiirrtteeeenn ((1133)) ccaalleennddaarr mmoonntthhss

iinncclluuddiinngg mmoonnssoooonn..

3 Vol.II Page No.6

General Information of Contract

Sr.No.8

TTiimmee ssttiippuullaatteedd ffoorr ::-- NNiinnee ((99)) CCaalleennddaarr MMoonntthhss ffoorrmm tthhee

ddaattee ooff wwrriitttteenn oorrddeerr ttoo ssttaarrtt wwoorrkk iinncclluuddiinngg mmoonnssoooonn

ppeerriioodd..

TThhiirrtteeeenn ((1133)) CCaalleennddaarr MMoonntthhss ffoorrmm tthhee ddaattee ooff wwrriitttteenn

oorrddeerr ttoo ssttaarrtt wwoorrkk iinncclluuddiinngg mmoonnssoooonn ppeerriioodd..

4 Vol.II Page No.7

Notice inviting tender Sr.No.3

TTiimmee LLiimmiitt ffoorr CCoommpplleettiioonn ooff wwoorrkk ::-- NNiinnee ((99)) mmoonntthhss

iinncclluuddiinngg mmoonnssoooonn..

TTiimmee LLiimmiitt ffoorr CCoommpplleettiioonn ooff wwoorrkk ::-- TThhiirrtteeeenn ((1133)) mmoonntthhss

iinncclluuddiinngg mmoonnssoooonn..

5 Vol.II Page No.9

Check List of accompaniments with the tender

Sr.No.4

EEaarrnneesstt mmoonneeyy iinn tthhee ffoorrmm ooff tteerrmm DDeeppoossiitt RReecceeiipptt ffoorr aa ppeerriioodd

ooff oonnee yyeeaarr iissssuueedd bbyy SScchheedduulleedd bbaannkk iinn tthhee nnaammee ooff tthhee

EExxeeccuuttiivvee EEnnggiinneeeerr,, NNaattiioonnaall HHiigghhwwaayy DDiivviissiioonn NNoo 33,, TThhaannee

ffrroomm tthhee llaasstt ddaattee ooff rreecceeiipptt ooff tteennddeerr oorr CCeerrttiiffiiccaattee ffoorr

EEaarrnneesstt mmoonneeyy iinn tthhee ffoorrmm ooff tteerrmm DDeeppoossiitt RReecceeiipptt ffoorr aa ppeerriioodd ooff

oonnee yyeeaarr iissssuueedd bbyy SScchheedduulleedd bbaannkk iinn tthhee nnaammee ooff tthhee EExxeeccuuttiivvee

EEnnggiinneeeerr,, NNaattiioonnaall HHiigghhwwaayy DDiivviissiioonn NNoo..99,, NNaasshhiikk ffrroomm tthhee llaasstt

ddaattee ooff rreecceeiipptt ooff tteennddeerr oorr CCeerrttiiffiiccaattee ffoorr EExxeemmppttiioonn ffoorr EEaarrnneesstt

EExxeemmppttiioonn ffoorr EEaarrnneesstt MMoonneeyy iiff aapppplliiccaabbllee.. MMoonneeyy iiff aapppplliiccaabbllee..

Sr No NIT

Page No.

Clause /Condition/Ite

m/Line No. NIT Provisions

Read as

6 Vol.II

Page No.12

Section –II Tender Data

Clause No.2.1.4

Sr.No.2,3,8&10

SSrr.. NNoo..

PPaarrttiiccuullaarrss ooff MMaacchhiinneerryy QQuuaannttiittyy

22 DDoozzeerr 22 NNooss.. 33 FFrroonntt EEnndd llooaaddeerr 11 NNoo.. 88 WWaatteerr TTaannkkaarr 33 NNooss.. 1100 TTaannddoomm RRoolllleerr 11 NNoo..

SSrr.. NNoo..

PPaarrttiiccuullaarrss ooff MMaacchhiinneerryy QQuuaannttiittyy

22 EExxccaavvaattoorr 11 NNoo.. 33 FFrroonntt EEnndd llooaaddeerr ---- 88 WWaatteerr TTaannkkaarr 11NNoo.. 1100 TTaannddoomm RRoolllleerr ----..

7 Vol.II Page No.14

Section –III Contract Data

Sr.No.2(f) f)Time allowed for the work from date of written order to commence :- Nine (9) Calendar Months Including Monsson.

f)Time allowed for the work from date of written order to commence :- Thirteen (13) Calendar Months Including Monsson.

8 Vol.II Page No.15

Section –III Contract Data

Sr.No.3

LLeevvyy ooff CCoommppeennssaattiioonn:: MMiilleessttoonnee ((PPaarrtt dduurraattiioonn wwiitthh rreessppeecctt ttoo ppeerriioodd ooff ccoommpplleettiioonn))

CCuummuullaattiivvee pphhyyssiiccaall ttaarrggeett ttoo bbee aacchhiieevveedd

IIff nnoott aacchhiieevveedd tthhee ccoommppeennssaattiioonn ppaayyaabbllee ppeerr ddaayy

MMiilleessttoonnee NNoo.. NNoo.. MMoonntthhss ffoorrmm tthhee ddaattee ooff wwoorrkk oorrddeerr

II 33 11%% RRss..55000000..0000 IIII 99 110000%% RRss..1100000000..0000

LLeevvyy ooff CCoommppeennssaattiioonn:: MMiilleessttoonnee ((PPaarrtt dduurraattiioonn wwiitthh rreessppeecctt ttoo ppeerriioodd ooff ccoommpplleettiioonn))

CCuummuullaattiivvee pphhyyssiiccaall ttaarrggeett ttoo bbee aacchhiieevveedd

IIff nnoott aacchhiieevveedd tthhee ccoommppeennssaattiioonn ppaayyaabbllee ppeerr ddaayy

MMiilleessttoonnee NNoo.. NNoo.. MMoonntthhss ffoorrmm tthhee ddaattee ooff wwoorrkk oorrddeerr

II 22 11%% RRss..55000000//-- IIII 66 6600%% RRss..1100,,000000//-- IIIIII 1133 110000%% RRss..1155,,000000//--

9 Vol.II Page No.15

Section –III Contract Data

Sr.No.6

Price VVaarriiaattiioonn CCllaauussee :: 11)) LLaabboouurr CCoommppoonneenntt :: NN..AA.. 22)) MMaatteerriiaall CCoommppoonneenntt ootthheerr tthhaann BBiittuummeenn aanndd cceemmeenntt :: NN..AA.. 33)) PPOOLL CCoommppoonneenntt :: NN..AA.. 44)) BBiittuummeenn CCoommppoonneenntt :: NN..AA.. 55)) HHYYSSDD && MMiilldd SStteeeell CCoommppoonneenntt :: NN..AA.. 66)) CCeemmeenntt CCoommppoonneenntt :: NN..AA.. CCoonnssuummeerr PPrriiccee IInnddeexx ((NNeeww SSeerriieess )) ffoorr IInndduussttrriiaall wwoorrkkeerrss ffoorr MMuummbbaaii cceenntteerr..

AAvveerraaggee pprriiccee ooff HH.. SS.. DD.. ffoorr MMuummbbaaii CCeenntteerr.. SSttaarr RRaatteess ffoorr 11.. BBiittuummeenn VVGG3300 :: RRss NN..AA.. 22.. CCeemmeenntt :: RRss.. NN..AA.. 33.. SStteeeell :: RRss.. NN..AA..

Price VVaarriiaattiioonn CCllaauussee :: 11)) LLaabboouurr CCoommppoonneenntt :: 66 %% 22)) MMaatteerriiaall CCoommppoonneenntt ootthheerr tthhaann BBiittuummeenn aanndd cceemmeenntt ::2255 %% 33)) PPOOLL CCoommppoonneenntt :: 66 %% 44)) BBiittuummeenn CCoommppoonneenntt :: 6633 %% 55)) HHYYSSDD && MMiilldd SStteeeell CCoommppoonneenntt :: AAccttuuaallVVoo66)) CCeemmeenntt CCoommppoonneenntt :: AAccttuuaall 77)) CC..II.. && DD..II PPiippee CCoommppoonneenntt :: AAccttuuaallIIIIII.. CCoonnssuummeerr PPrriiccee IInnddeexx ((NNeeww SSeerriieess )) ffoorr IInndduussttrriiaall wwoorrkkeerrss ffoorr MMuummbbaaii cceenntteerr..

AAvveerraaggee pprriiccee ooff HH.. SS.. DD.. ffoorr MMuummbbaaii CCeenntteerr.. RRaatteess ffoorr 11.. BBiittuummeenn VVGG3300 :: RRss 4455,,887777//MMTT VVGG1100 :: RRss..4444,,884477//MMTT 22.. CCeemmeenntt :: RRss.. 44660000//MMTT 33.. SStteeeell :: RRss..4455,,000000//MMTT

10 Vol.II

Page No.21

Section IV Memorandu

m (d)

dd.. GGiivvee SScchheedduullee ((wwhheerree nneecceessssaarryy)) ooff ddaatteess bbyy wwhhiicchh vvaarriioouuss iitteemmss aarree ttoo bbee ccoommpplleetteedd..

TTiimmee aalllloowweedd ffoorr tthhee wwoorrkk ffrroomm ddaattee ooff wwrriitttteenn oorrddeerr ttoo ccoommmmeennccee NNiinnee ((99)) ccaalleennddaarr MMoonntthhss iinncclluuddiinngg MMoonnssoooonn

dd.. GGiivvee SScchheedduullee ((wwhheerree nneecceessssaarryy)) ooff ddaatteess bbyy wwhhiicchh vvaarriioouuss iitteemmss aarree ttoo bbee ccoommpplleetteedd..

TTiimmee aalllloowweedd ffoorr tthhee wwoorrkk ffrroomm ddaattee ooff wwrriitttteenn oorrddeerr ttoo ccoommmmeennccee TThhiirrtteeeenn ((1133)) ccaalleennddaarr MMoonntthhss iinncclluuddiinngg MMoonnssoooonn

11 Vol.II

Page No.

Section XII Drawing

BAR CHART The Modified Barchart is enclosed herewith as Annexture-A

O.C. Approved by C.E. Chief Engineer National Highway (P.W.)

Konkan Bhavan, Navi Mumbai

Office of the Executive Engineer,National Highway Division No. IX, Nashik. Phone No: - 0253-2573270 Email:[email protected] No. NH-IX/AB/Tender-2/ 592/ 2012 Date. 07 / 07 / 2012 To, The e-tendering Tenderers

SUB:- Improvement to Riding Quality of Existing Carriage way in Km 218/500 to Km. 230/000 of Kalyan Ahmadmagar Pathardi Nanded Nirmal Road N.H.222

in the State of Maharashtra System Tender No.48

REF:- Pre bid meeting held in the office Chief Engineer, National Highway (P.W.) Konkan Bhavan, Navi Mumbai on Dated 29/06/2012 at 14.00 hrs.

Please find enclosed herewith CSD of the pre bid meeting held in the office of the Chief Engineer, National Highway (P.W.) Konkan Bhavan, Navi Mumbai on 29/06/2012 in pursuant to the clause 7.3 of Volume I of the bidding document for the above mentioned work.

1. The CSD issued herewith shall be part of the bidding document & the bidders are requested to submit the CSD on line along with the bidding document.

2. No any other changes in terms & condition of Bid document except that are mentioned in CSD

3. The Bidders are requested to submit their offer considering the CSD and that offers shall be unconditional. The conditional offers are liable for rejection.

D.A.- CCoommmmoonn SSeett OOff DDeevviiaattiioonn

Executive Engineer National Highway Division No. IX Nashik

.

Minutes of the Pre-tender Conference held in the chamber of the Chief Engineer, N.H. (P.W.) Maharashtra Konkan Bhavan, 5th Floor, Room No. 526, Navi Mumbai on 29-06-2012 at 14.00 P.M.

Name of Work :- “Improvement to Riding Quality of Existing Carriageway in Km.218//550 to Km. 230/000 of Kalyan Ahmednagar Pathardi Nanded Nirmal Road N.H.222 in the State of Maharashtra” (System Tender No. 48)

1. A pre tender conference open to all prospective tenderer was held in the office of the

Chief Engineer National Highway (P.W.) Maharashtra Konkan Bhavan Navi Mumbai on

dated 29-06-2012 at 14.00 P.M. The following officers & prospective tenderer attended the

Pre-bid meeting.

The following Officers were present for the Pre-tender Conference.

Sr.N. Name of the Officer Designation

[1] Shri. P.S. Mandpe Chief Engineer National Highway (P.W.)

Konkan Bhavan,Navi Mumbai [2] Shri. K. T. Patil Executive Engineer

National Highway Division No.IX, Nashik

2. Executive Engineer, National Highway Division No.9, Nashik told in the meeting that, bidder should send their pre bid queries through online upto 22-06-2012 however one bidder send his pre bid queries and M/s. R.R.Kapoor, Engineer & Contractor raised their pre bid queries vide fax letter dated 29-06-2012.

3. The Representative of M/s. Best Construction Company has attended the meeting.

4. The points raised by M/s. R.R.Kapoor, Engineer & Contractor and through

online and their clarification given during the meeting are as under.

Point raised through online Clarification

1. As per Section 2.1.2, work completed of Rs.371 lakhs as single work of any one in Last Three Financial Years Instead of this single work of any one of last preceding five financial years to be consider. (As per section 2.1.3 you have consider Qty. of work in continuous one year period during last five years.

It was clarified that, the contractor should completed single similar nature of work in any one of the preceding five financial years instead of three financial years and the said changes will be communicated through common set of deviation.

2. Instead of Dozer and Loader please consider excavator Machinery.

It was decided that, Excavator is allowed instead of Dozer and Roller, 1 Water Tanker is allowed instead of 3 Water Tanker and condition regarding Tandom Roller is deleted and said changes will be communicated through common set of deviation .

3 As tender cost is within 5 crores , instead of 3 water tanker consider 1 water tanker.

4 As work of side shoulder (Qty. 4828.13 CU.M.) (PG-37 Sr,No.6) in above item you have mention Vibratory Roller, So There is no need of Tadem Roller , so please cancelled condition of Tandem Roller.

5 D.L. period is 36 months (PG No.15 SR.No.4) consider D.L. Period As 24 months.

Provision in NIT shall prevail

6 Time limit for completion of work is 11 months consider as 13 months, also consider price variations clause.

It was decided that, 13 months (including monsoon) period for completion of work is kept instead of 11 months and the irrespective changes shall made in NIT and the said changes will be communicated through common set of deviation .

Point raised by M/s. R.R.Kapoor,

Engineer & Contractor vide their letter

dated 29-06-2012

Clarification

7 1) Plant Mobilization should be taken in the from of B.G. instead of FDR. 2) Trial pit details should be given. 2) Defect Liability Period should be 12 months.

Provision in NIT shall prevail

The meeting was concluded with vote of thanks.

O.C.Approved by C.E. Chief Engineer National Highway (P.W.)

Konkan Bhavan, Navi Mumbai.

COMMON SET OF DEVIATION

Name of Work. :- “Improvement to Riding Quality of Existing Carriageway in Km.218//550 to Km. 230/000 of Kalyan Ahmednagar Pathardi Nanded Nirmal Road N.H.222 in the State of Maharashtra” (System Tender No. 48)

Sr No NIT

Page No.

Clause /Condition/Item/Line

No. NIT Provisions

Read as

1 Vol.II Page No.3

Section –I Details of works Time Stipulated for Completion :- Eleven (11) Calendar

Months which will include the monsoon period, if any. Time Stipulated for Completion :- Thirteen (13) Calendar Months which will include the monsoon period, if any.

2 Vol.II Page No.4

Tender Notification under e-

Procuremen(Ist Call) Column No.7

PPeerriioodd ooff CCoommpplleettiioonn ::-- Eleven ccaalleennddaarr mmoonntthhss iinncclluuddiinngg

mmoonnss00oonn..

PPeerriioodd ooff CCoommpplleettiioonn ::-- TThhiirrtteeeenn ((1133)) ccaalleennddaarr mmoonntthhss

iinncclluuddiinngg mmoonnssoooonn..

3 Vol.II Page No.6

General Information of Contract

Sr.No.8

TTiimmee ssttiippuullaatteedd ffoorr ::-- Eleven (11)CCaalleennddaarr MMoonntthhss ffoorrmm

tthhee ddaattee ooff wwrriitttteenn oorrddeerr ttoo ssttaarrtt wwoorrkk iinncclluuddiinngg mmoonnssoooonn

ppeerriioodd..

TThhiirrtteeeenn ((1133)) CCaalleennddaarr MMoonntthhss ffoorrmm tthhee ddaattee ooff wwrriitttteenn

oorrddeerr ttoo ssttaarrtt wwoorrkk iinncclluuddiinngg mmoonnssoooonn ppeerriioodd..

4 Vol.II Page No.7

Notice inviting tender Sr.No.3

TTiimmee LLiimmiitt ffoorr CCoommpplleettiioonn ooff wwoorrkk ::-- Eleven (11)

mmoonntthhss iinncclluuddiinngg mmoonnssoooonn..

TTiimmee LLiimmiitt ffoorr CCoommpplleettiioonn ooff wwoorrkk ::-- TThhiirrtteeeenn ((1133)) mmoonntthhss

iinncclluuddiinngg mmoonnssoooonn..

5 Vol.II Page No.9

Check List of accompaniments with the tender

Sr.No.4

EEaarrnneesstt mmoonneeyy iinn tthhee ffoorrmm ooff tteerrmm DDeeppoossiitt RReecceeiipptt ffoorr aa ppeerriioodd

ooff oonnee yyeeaarr iissssuueedd bbyy SScchheedduulleedd bbaannkk iinn tthhee nnaammee ooff tthhee

EExxeeccuuttiivvee EEnnggiinneeeerr,, NNaattiioonnaall HHiigghhwwaayy DDiivviissiioonn NNoo 33,, TThhaannee

ffrroomm tthhee llaasstt ddaattee ooff rreecceeiipptt ooff tteennddeerr oorr CCeerrttiiffiiccaattee ffoorr

EEaarrnneesstt mmoonneeyy iinn tthhee ffoorrmm ooff tteerrmm DDeeppoossiitt RReecceeiipptt ffoorr aa ppeerriioodd ooff

oonnee yyeeaarr iissssuueedd bbyy SScchheedduulleedd bbaannkk iinn tthhee nnaammee ooff tthhee EExxeeccuuttiivvee

EEnnggiinneeeerr,, NNaattiioonnaall HHiigghhwwaayy DDiivviissiioonn NNoo..99,, NNaasshhiikk ffrroomm tthhee llaasstt

ddaattee ooff rreecceeiipptt ooff tteennddeerr oorr CCeerrttiiffiiccaattee ffoorr EExxeemmppttiioonn ffoorr EEaarrnneesstt

EExxeemmppttiioonn ffoorr EEaarrnneesstt MMoonneeyy iiff aapppplliiccaabbllee.. MMoonneeyy iiff aapppplliiccaabbllee..

-2-

Sr No NIT

Page No.

Clause /Condition/Ite

m/Line No. NIT Provisions

Read as

6 Vol.II

Page No.12

Section –II Tender Data

Clause No.2.1.4

Sr.No.2,3,8&10

SSrr.. NNoo..

PPaarrttiiccuullaarrss ooff MMaacchhiinneerryy QQuuaannttiittyy

22 DDoozzeerr 22 NNooss.. 33 FFrroonntt EEnndd llooaaddeerr 11 NNoo.. 88 WWaatteerr TTaannkkaarr 33 NNooss.. 1100 TTaannddoomm RRoolllleerr 11 NNoo..

SSrr.. NNoo..

PPaarrttiiccuullaarrss ooff MMaacchhiinneerryy QQuuaannttiittyy

22 EExxccaavvaattoorr 11 NNoo.. 33 FFrroonntt EEnndd llooaaddeerr ---- 88 WWaatteerr TTaannkkaarr 11NNoo.. 1100 TTaannddoomm RRoolllleerr ----..

7 Vol.II Page No.14

Section –III Contract Data

Sr.No.2(f) f)Time allowed for the work from date of written order to commence :- Eleven (11) Calendar Months Including Monsson.

f)Time allowed for the work from date of written order to commence :- Thirteen (13) Calendar Months Including Monsson.

8 Vol.II Page No.15

Section –III Contract Data

Sr.No.3

LLeevvyy ooff CCoommppeennssaattiioonn:: MMiilleessttoonnee ((PPaarrtt dduurraattiioonn wwiitthh rreessppeecctt ttoo ppeerriioodd ooff ccoommpplleettiioonn))

CCuummuullaattiivvee pphhyyssiiccaall ttaarrggeett ttoo bbee aacchhiieevveedd

IIff nnoott aacchhiieevveedd tthhee ccoommppeennssaattiioonn ppaayyaabbllee ppeerr ddaayy

II 22 MMoonntthhss 2200%% RRss..55000000..0000 IIII 66 MMoonntthhss 5500%% RRss..1100000000..0000 IIIIII 1133 MMoonntthhss 110000%% RRss..1155000000..0000

LLeevvyy ooff CCoommppeennssaattiioonn:: MMiilleessttoonnee ((PPaarrtt dduurraattiioonn wwiitthh rreessppeecctt ttoo ppeerriioodd ooff ccoommpplleettiioonn))

CCuummuullaattiivvee pphhyyssiiccaall ttaarrggeett ttoo bbee aacchhiieevveedd

IIff nnoott aacchhiieevveedd tthhee ccoommppeennssaattiioonn ppaayyaabbllee ppeerr ddaayy

MMiilleessttoonnee NNoo.. NNoo.. MMoonntthhss ffoorrmm tthhee ddaattee ooff wwoorrkk oorrddeerr

II 22 MMoonntthhss 11..3366%% RRss..55000000..0000 IIII 66 MMoonntthhss 6600%% RRss..1100000000..0000 IIIIII 1133 MMoonntthhss 110000%% RRss..1155000000..0000

O.C. Approved by C.E. Chief Engineer

National Highway (P.W.) Konkan Bhavan, Navi Mumbai

9 Vol.II Page No.15

Section –III Contract Data

Sr.No.6

Price VVaarriiaattiioonn CCllaauussee :: 11)) LLaabboouurr CCoommppoonneenntt :: NN..AA.. 22)) MMaatteerriiaall CCoommppoonneenntt ootthheerr tthhaann BBiittuummeenn aanndd cceemmeenntt :: NN..AA.. 33)) PPOOLL CCoommppoonneenntt :: NN..AA.. 44)) BBiittuummeenn CCoommppoonneenntt :: NN..AA.. 55)) HHYYSSDD && MMiilldd SStteeeell CCoommppoonneenntt :: NN..AA.. 66)) CCeemmeenntt CCoommppoonneenntt :: NN..AA.. CCoonnssuummeerr PPrriiccee IInnddeexx ((NNeeww SSeerriieess )) ffoorr IInndduussttrriiaall wwoorrkkeerrss ffoorr MMuummbbaaii cceenntteerr..

AAvveerraaggee pprriiccee ooff HH.. SS.. DD.. ffoorr MMuummbbaaii CCeenntteerr.. SSttaarr RRaatteess ffoorr 11.. BBiittuummeenn VVGG3300 :: RRss NN..AA.. 22.. CCeemmeenntt :: RRss.. NN..AA.. 33.. SStteeeell :: RRss.. NN..AA..

Price VVaarriiaattiioonn CCllaauussee :: 11)) LLaabboouurr CCoommppoonneenntt :: 66..0033 %% 22)) MMaatteerriiaall CCoommppoonneenntt ootthheerr tthhaann BBiittuummeenn aanndd cceemmeenntt :: 2211..9944 %% 33)) PPOOLL CCoommppoonneenntt :: 33..4477 %% 44)) BBiittuummeenn CCoommppoonneenntt :: 6688..3311 %% 55)) HHYYSSDD && MMiilldd SStteeeell CCoommppoonneenntt :: 00..1199 %%VVoo 66)) CCeemmeenntt CCoommppoonneenntt :: AAccttuuaall 77)) CC..II.. && DD..II PPiippee CCoommppoonneenntt :: AAccttuuaallIIIIII.. CCoonnssuummeerr PPrriiccee IInnddeexx ((NNeeww SSeerriieess )) ffoorr IInndduussttrriiaall wwoorrkkeerrss ffoorr MMuummbbaaii cceenntteerr..

AAvveerraaggee pprriiccee ooff HH.. SS.. DD.. ffoorr MMuummbbaaii CCeenntteerr.. RRaatteess ffoorr 11.. BBiittuummeenn VVGG3300 :: RRss 4455887777..0000//MM..TT.. BBiittuummeenn VVGG1100 :: RRss 4444887777..0000//MM..TT.. 22.. CCeemmeenntt :: RRss..44660000..0000//MM..TT.. 33.. SStteeeell :: RRss.. 4455000000..0000//MM..TT..

10 Vol.II

Page No.21

Section IV Memorandu

m (d)

dd.. GGiivvee SScchheedduullee ((wwhheerree nneecceessssaarryy)) ooff ddaatteess bbyy wwhhiicchh vvaarriioouuss iitteemmss aarree ttoo bbee ccoommpplleetteedd..

TTiimmee aalllloowweedd ffoorr tthhee wwoorrkk ffrroomm ddaattee ooff wwrriitttteenn oorrddeerr ttoo ccoommmmeennccee Eleven (11) ccaalleennddaarr MMoonntthhss iinncclluuddiinngg MMoonnssoooonn

dd.. GGiivvee SScchheedduullee ((wwhheerree nneecceessssaarryy)) ooff ddaatteess bbyy wwhhiicchh vvaarriioouuss iitteemmss aarree ttoo bbee ccoommpplleetteedd..

TTiimmee aalllloowweedd ffoorr tthhee wwoorrkk ffrroomm ddaattee ooff wwrriitttteenn oorrddeerr ttoo ccoommmmeennccee TThhiirrtteeeenn ((1133)) ccaalleennddaarr MMoonntthhss iinncclluuddiinngg MMoonnssoooonn

11 Vol.II

Page No.

Section XII Drawing

BAR CHART The Modified Barchart is enclosed herewith as Annexture-A

Office of the Executive Engineer,National Highway Division No. IX, Nashik. Phone No: - 0253-2573270 Email:[email protected] No. NH-IX/AB/Tender-2/593/ 2012 Date. 07 / 07 / 2012 To, The e-tendering Tenderers SUB:- Improvement to Riding Quality of Existing Carriage way in Km

295/00 to Km. 303/100 of Kalyan Ahmadmagar Pathardi Nanded Nirmal Road N.H.222 in the State of Maharashtra System Tender No.49

REF:- Pre bid meeting held in the office Chief Engineer, National Highway (P.W.) Konkan Bhavan, Navi Mumbai on Dated 29/06/2012 at 14.00 hrs.

Please find enclosed herewith CSD of the pre bid meeting held in the office of the Chief Engineer, National Highway (P.W.) Konkan Bhavan, Navi Mumbai on 29/06/2012 in pursuant to the clause 7.3 of Volume I of the bidding document for the above mentioned work.

1. The CSD issued herewith shall be part of the bidding document & the bidders are requested to submit the CSD on line along with the bidding document.

2. No any other changes in terms & condition of Bid document except that are mentioned in CSD

3. The Bidders are requested to submit their offer considering the CSD and that offers shall be unconditional. The conditional offers are liable for rejection.

D.A.- CCoommmmoonn SSeett OOff DDeevviiaattiioonn

Executive Engineer National Highway Division No. IX Nashik

Minutes of the Pre-tender Conference held in the chamber of the Chief Engineer, N.H. (P.W.) Maharashtra Konkan Bhavan, 5th Floor, Room No. 526, Navi Mumbai on 29-06-2012 at 14.00 P.M.

Name of Work :- Improvement to Riding Quality to Kalyan Ahmednagar Pathardi Nanded Nirmal Road N.H.222 in Km. 295/000 to 303/100 in the State of Maharashtra. (System Tender No. 49)

1. A pre tender conference open to all prospective tenderer was held in the office of the

Chief Engineer National Highway (P.W.) Maharashtra Konkan Bhavan Navi Mumbai on

dated 29-06-2012 at 14.00 P.M. The following officers & prospective tenderer attended the

Pre-bid meeting.

The following Officers were present for the Pre-tender Conference.

Sr.N. Name of the Officer Designation [1] Shri. P.S. Mandpe Chief Engineer

National Highway (P.W.) Konkan Bhavan,Navi Mumbai

[2] Shri. K. T. Patil Executive Engineer National Highway Division No.IX,

Nashik 2. Executive Engineer, National Highway Division No.9, Nashik told in the meeting that, bidder should send their pre bid queries through online upto 22-06-2012 however one bidder send his pre bid queries and M/s. R.R.Kapoor, Engineer & Contractor raised their pre bid queries vide fax letter dated 29-06-2012.

3. The Representative of M/s. Best Construction Company has attended the meeting. However M/s. Best Construction Company has raised various points vide their letter dated 29-06-2012. (The points raised by M/s. Best Construction Company in writing is same as points raised through online).

4. The points raised by M/s. Best Construction Company and M/s. R.R.Kapoor,

Engineer & Contractor clarification given during the meeting are as under.

Point raise by M/s. Best Construction

Company, vide their letter dated 29-06-2012 Clarification

1. PG No.-15 (SR No.4) Defect Liability Period is 36 months consider defect liability period of 24 months.

Provision in NIT shall prevail

2. Work period is 8 months consider as 13 months, consider price variation clause.

It was decided that, 13 months (including monsoon) period for completion of work is kept instead of 8 months and the irrespective changes shall made in NIT and the said changes will be communicated through common set of deviation .

Point raised by M/s. R.R.Kapoor,

Engineer & Contractor vide their

letter dated 29-06-2012

Clarification

3 1) Plant Mobilization should be taken in the from of B.G. instead of FDR. 2) Defect Liability Period should be 12 months.

Provision in NIT shall prevail

The meeting was concluded with vote of thanks.

O.C.Approved by C.E.(NH) O.C.Approved by C.E.

For Chief Engineer National Highway (P.W.)

Konkan Bhavan, Navi Mumbai.

COMMON SET OF DEVIATION

Name of Work. :- Improvement to Riding Quality to Kalyan Ahmednagar Pathardi Nanded Nirmal Road N.H.222 in Km. 295/000 to 303/100 in the State of Maharashtra. (System Tender No. 49)

Sr No NIT

Page No.

Clause /Condition/Item/Line

No. NIT Provisions

Read as

1 Vol.II Page No.3

Section –I Details of works Time Stipulated for Completion :- Eight (8) Calendar

Months which will include the monsoon period, if any. Time Stipulated for Completion :- Thirteen (13) Calendar Months which will include the monsoon period, if any.

2 Vol.II Page No.4

Tender Notification under e-

Procuremen(Ist Call) Column No.7

PPeerriioodd ooff CCoommpplleettiioonn ::-- Eight ccaalleennddaarr mmoonntthhss iinncclluuddiinngg mmoonnss00oonn..

PPeerriioodd ooff CCoommpplleettiioonn ::-- TThhiirrtteeeenn ((1133)) ccaalleennddaarr mmoonntthhss iinncclluuddiinngg mmoonnssoooonn..

3 Vol.II Page No.6

General Information of Contract

Sr.No.8

TTiimmee ssttiippuullaatteedd ffoorr ::-- Eight (8) CCaalleennddaarr MMoonntthhss ffoorrmm tthhee ddaattee ooff wwrriitttteenn oorrddeerr ttoo ssttaarrtt wwoorrkk iinncclluuddiinngg mmoonnssoooonn ppeerriioodd..

TThhiirrtteeeenn ((1133)) CCaalleennddaarr MMoonntthhss ffoorrmm tthhee ddaattee ooff wwrriitttteenn oorrddeerr ttoo ssttaarrtt wwoorrkk iinncclluuddiinngg mmoonnssoooonn ppeerriioodd..

4 Vol.II Page No.7

Notice inviting tender Sr.No.3

TTiimmee LLiimmiitt ffoorr CCoommpplleettiioonn ooff wwoorrkk ::-- Eight (8) mmoonntthhss iinncclluuddiinngg mmoonnssoooonn..

TTiimmee LLiimmiitt ffoorr CCoommpplleettiioonn ooff wwoorrkk ::-- TThhiirrtteeeenn ((1133)) mmoonntthhss iinncclluuddiinngg mmoonnssoooonn..

5 Vol.II Page No.9

Check List of accompaniments with the tender

Sr.No.4

EEaarrnneesstt mmoonneeyy iinn tthhee ffoorrmm ooff tteerrmm DDeeppoossiitt RReecceeiipptt ffoorr aa ppeerriioodd ooff oonnee yyeeaarr iissssuueedd bbyy SScchheedduulleedd bbaannkk iinn tthhee nnaammee ooff tthhee EExxeeccuuttiivvee EEnnggiinneeeerr,, NNaattiioonnaall HHiigghhwwaayy DDiivviissiioonn NNoo 33,, TThhaannee ffrroomm tthhee llaasstt ddaattee ooff rreecceeiipptt ooff tteennddeerr oorr CCeerrttiiffiiccaattee ffoorr EExxeemmppttiioonn ffoorr EEaarrnneesstt MMoonneeyy iiff aapppplliiccaabbllee..

EEaarrnneesstt mmoonneeyy iinn tthhee ffoorrmm ooff tteerrmm DDeeppoossiitt RReecceeiipptt ffoorr aa ppeerriioodd ooff oonnee yyeeaarr iissssuueedd bbyy SScchheedduulleedd bbaannkk iinn tthhee nnaammee ooff tthhee EExxeeccuuttiivvee EEnnggiinneeeerr,, NNaattiioonnaall HHiigghhwwaayy DDiivviissiioonn NNoo..99,, NNaasshhiikk ffrroomm tthhee llaasstt ddaattee ooff rreecceeiipptt ooff tteennddeerr oorr CCeerrttiiffiiccaattee ffoorr EExxeemmppttiioonn ffoorr EEaarrnneesstt MMoonneeyy iiff aapppplliiccaabbllee..

-2-

Sr No NIT

Page No.

Clause /Condition/Ite

m/Line No. NIT Provisions

Read as

7 Vol.II Page No.15

Section –III Contract Data

Sr.No.2(e) e)Time allowed for the work from date of written order to commence :- Eight (8) Calendar Months Including Monsson.

e)Time allowed for the work from date of written order to commence :- Thirteen (13) Calendar Months Including Monsson.

8 Vol.II

Page No.15

Section –III Contract Data

Sr.No.3

LLeevvyy ooff CCoommppeennssaattiioonn::

MMiilleessttoonnee ((PPaarrtt dduurraattiioonn wwiitthh rreessppeecctt ttoo ppeerriioodd ooff ccoommpplleettiioonn))

CCuummuullaattiivvee pphhyyssiiccaall ttaarrggeett ttoo bbee aacchhiieevveedd

IIff nnoott aacchhiieevveedd tthhee ccoommppeennssaattiioonn ppaayyaabbllee ppeerr ddaayy

MMiilleessttoonnee NNoo.. NNoo.. MMoonntthhss ffoorrmm tthhee ddaattee ooff wwoorrkk oorrddeerr

II 44 6611%% RRss..11000000..0000 IIII 44 110000%% RRss..55000000..0000

LLeevvyy ooff CCoommppeennssaattiioonn::

MMiilleessttoonnee ((PPaarrtt dduurraattiioonn wwiitthh rreessppeecctt ttoo ppeerriioodd ooff ccoommpplleettiioonn))

CCuummuullaattiivvee pphhyyssiiccaall ttaarrggeett ttoo bbee aacchhiieevveedd

IIff nnoott aacchhiieevveedd tthhee ccoommppeennssaattiioonn ppaayyaabbllee ppeerr ddaayy

MMiilleessttoonnee NNoo.. NNoo.. MMoonntthhss ffoorrmm tthhee ddaattee ooff wwoorrkk oorrddeerr

II 22 00..3311%% RRss..55000000..0000 IIII 77 4400%% RRss..1100000000..0000 IIIIII 1133 110000%% RRss..1155000000..0000

9 Vol.II Page No.16

Section –III Contract Data

Sr.No.6

Price VVaarriiaattiioonn CCllaauussee :: 11)) LLaabboouurr CCoommppoonneenntt :: NN..AA.. 22)) MMaatteerriiaall CCoommppoonneenntt ootthheerr tthhaann BBiittuummeenn aanndd cceemmeenntt :: NN..AA.. 33)) PPOOLL CCoommppoonneenntt :: NN..AA.. 44)) BBiittuummeenn CCoommppoonneenntt :: NN..AA.. 55)) HHYYSSDD && MMiilldd SStteeeell CCoommppoonneenntt :: NN..AA.. 66)) CCeemmeenntt CCoommppoonneenntt :: NN..AA.. CCoonnssuummeerr PPrriiccee IInnddeexx ((NNeeww SSeerriieess )) ffoorr IInndduussttrriiaall wwoorrkkeerrss ffoorr MMuummbbaaii cceenntteerr..

AAvveerraaggee pprriiccee ooff HH.. SS.. DD.. ffoorr MMuummbbaaii CCeenntteerr.. SSttaarr RRaatteess ffoorr 11.. BBiittuummeenn VVGG3300 :: RRss NN..AA.. 22.. BBiittuummeenn VVGG1100 :: RRss NN..AA..

Price VVaarriiaattiioonn CCllaauussee :: 11)) LLaabboouurr CCoommppoonneenntt :: 55%% 22)) MMaatteerriiaall CCoommppoonneenntt ootthheerr tthhaann BBiittuummeenn aanndd cceemmeenntt :: 99%% 33)) PPOOLL CCoommppoonneenntt :: 2299%% 44)) BBiittuummeenn CCoommppoonneenntt :: 5577%% CCoonnssuummeerr PPrriiccee IInnddeexx ((NNeeww SSeerriieess )) ffoorr IInndduussttrriiaall wwoorrkkeerrss ffoorr MMuummbbaaii cceenntteerr..

AAvveerraaggee pprriiccee ooff HH.. SS.. DD.. ffoorr MMuummbbaaii CCeenntteerr.. RRaatteess ffoorr 11.. BBiittuummeenn VVGG3300 :: RRss.. 4455887777..0000 // MM..TT.. 22.. BBiittuummeenn VVGG1100 :: RRss 4444884477..0000 // MM..TT..

10

Vol.II

Page No.21

Section IV Memorandu

m (d)

dd.. GGiivvee SScchheedduullee ((wwhheerree nneecceessssaarryy)) ooff ddaatteess bbyy wwhhiicchh vvaarriioouuss iitteemmss aarree ttoo bbee ccoommpplleetteedd..

TTiimmee aalllloowweedd ffoorr tthhee wwoorrkk ffrroomm ddaattee ooff wwrriitttteenn oorrddeerr ttoo ccoommmmeennccee EEiigghhtt ((88)) ccaalleennddaarr MMoonntthhss iinncclluuddiinngg MMoonnssoooonn

dd.. GGiivvee SScchheedduullee ((wwhheerree nneecceessssaarryy)) ooff ddaatteess bbyy wwhhiicchh vvaarriioouuss iitteemmss aarree ttoo bbee ccoommpplleetteedd..

TTiimmee aalllloowweedd ffoorr tthhee wwoorrkk ffrroomm ddaattee ooff wwrriitttteenn oorrddeerr ttoo ccoommmmeennccee TThhiirrtteeeenn ((1133)) ccaalleennddaarr MMoonntthhss iinncclluuddiinngg MMoonnssoooonn

12 Vol.II

Page No.

Section XII Drawing

BAR CHART The Modified Barchart is enclosed herewith as Annexure-A

O.C. Approved by C.E. For Chief Engineer National Highway (P.W.)

Konkan Bhavan, Navi Mumbai