OFFICE OF THE AUDITOR GENERAL · OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL iv 2....
Transcript of OFFICE OF THE AUDITOR GENERAL · OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL iv 2....
ROADS
HOSPITALS
1VALUE FOR MONEY AUDIT REPORT ON THE IMPLEMENTATION OF THE EXPRESS PENALTY SCHEME (EPS)
BY UGANDA POLICE FORCE | A REPORT BY THE AUDITOR GENERAL
OFFICE OF THE AUDITOR GENERAL
www.oag.go.ug | E-mail: [email protected]
T H E R E P U B L I C O F U G A N D A
D E C E M B E R , 2 0 1 51VALUE FOR MONEY AUDIT REPORT ON THE IMPLEMENTATION OF THE EXPRESS PENALTY SCHEME (EPS)
BY UGANDA POLICE FORCE | A REPORT BY THE AUDITOR GENERAL
OFFICE OF THE AUDITOR GENERAL
P.O.Box 7083, Kampala,Tel: +256 414 344 340 Fax: +256 414 345 674
E-mail: [email protected]
REG
ULA
TIO
N O
F TH
E C
ON
STR
UC
TIO
N S
ECTO
R B
Y M
INIS
TRY
OF
WO
RK
S A
ND
TR
AN
SPO
RT
A REPORT BY THE AUDITOR GENERAL
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT
T H E R E P U B L I C O F U G A N D A
DECEMBER, 2015
A REPORT BY THE AUDITOR GENERAL
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND
TRANSPORT
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
4
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
5
31st December 2015
The Rt. Hon. Speaker of ParliamentParliament of UgandaKampala
VALUE FOR MONEY AUDIT REPORT ON THE REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT (MoWT)
In accordance with Article 163 (3) of the Constitution of the Republic of Uganda 1995 (as amended) , I hereby submit my report on the value for money audit undertaken on the Regulation of the Construction Sector by Ministry of Works and Transport (MoWT).
My office intends to carry out a follow – up at an appropriate time regarding actions taken in relation to the recommendations in this report.I would like to thank my staff who undertook this audit and the staff of Ministry of Works and Transport for the assistance offered to my staff during the period of the audit.
John F. S. MuwangaAUDITOR GENERAL
AUDITOR GENERALAUDITOR GENERAL’S MESSAGE
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
6
TAB
LE O
F C
ON
TEN
TSTA
BLE
OF
CO
NTE
NTS
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
i
TABLE OF CONTENTS
LIST OF TABLES .......................................................................................................................ii
LIST OF ACRONYMS AND ABBREVIATIONS .......................................................................... iii
EXECUTIVE SUMMARY ............................................................................................................ iii
CHAPTER ONE1.0 INTRODUCTION ........................................................................................................... 2
1.1 Background to the audit .............................................................................................. 2
1.2 Motivation ..................................................................................................................... 2
1.3 Description of the audit area ....................................................................................... 3
1.4 Audit scope ................................................................................................................... 4
CHAPTER TWO2.0 AUDIT METHODOLOGY ............................................................................................... 6
2.1 Sampling ..................................................................................................................... 6
2.2 Data collection methods ............................................................................................ 6
CHAPTER THREE3.0 SYSTEMS AND PROCESS DESCRIPTION .................................................................... 9
3.1 Roles and responsibilities of key players .................................................................... 9
3.2 Process description ......................................................................................................10
CHAPTER FOUR4.0 FINDINGS, CONCLUSIONS AND RECOMMENDATIONS ...........................................13
4.1 Mandate and regulatory framework for construction industry .................................13
4.2 Dissemination of policies, laws, guidelines and standards .......................................18
4.3 Research on construction materials ..........................................................................19
4.4 Monitoring of compliance to construction standards ................................................20
4.5 Coordination of stakeholders ......................................................................................22
GLOSSARY OF TERMS ..................................................................................................................24
APPENDICES
APPENDIX I: Organizational Structure ........................................................................................25
APPENDIX II: Funding of the construction standards and quality management activities: .............26
APPENDIX III: List of documents reviewed ..................................................................................27
APPENDIX IV: List of interviews conducted..................................................................................28
APPENDIX V: Construction works executed by mowt. ..................................................................29
APPENDIX VI: Comparison of planned against actual activities under development of policies, laws ..........32
APPENDIX VII: Registration of Professionals planned against actual activities .......................................36
APPENDIX VIII: Monitoring and capacity building planned activities against actual activities ..........37
APPENDIX IX: Monitoring and undertaking research planned against actual activites .............................40
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
ii
Table 1: Methodology used ..................................................................................................... 7
Table 2: Funding for Development of policies under department of construction Standards ..14
Table 3: Funding for development of building works legislation ..........................................16
Table 4: Funding for development of road works legislation ................................................17
Table 5: Planned Inspection on Road Works in Local Governments ....................................20
Table 6: Funds budgeted and allocated for monitoring activities on road works ................21
Table 7: Planned Inspection on Building Works in Local Governments ...............................21
Table 8: Funds budgeted and actuals received for monitoring building works ...................21
Table 9: Funds budgeted and received in relation to coordination activities .......................23
ARB Architects Registration Board
COST Construction Sector Transparency Initiative
DANIDA Danish International Development Agency
DUCAR District Urban Community Access Roads
ERB Engineers Registration Board
GOU Government of Uganda
KCCA Kampala Capital City Authority
MDAs Ministries, Departments and Agencies
MELTC Mt. Elgon Labour Based Training Centre
MoWT Ministry of Works and Transport
MPS Ministerial Policy Statement
NCI National Construction Industry
NCP National Construction Policy
SRB Surveyors Registration Board
UCICO Uganda Construction Industry Commission
UIPE Uganda Institution of Professional Engineers
UNRA Uganda National Roads Authority
URF Uganda Road Fund
LIST OF TABLES
ABBREVIATIONS AND ACRONYMS
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
iii
INTRODUCTION
The Construction Industry in Uganda comprises both the building and civil engineering works and these contribute greatly to the Ugandan economy in delivering the physical infrastructure.
Over the years Government has increasingly realized that the management of the country’s physical infrastructure requires collaboration of the public and private sector. Government is also divesting itself of direct service delivery in order to improve the efficiency and effectiveness of public services. In Uganda, the construction sector grew by 8.2% in 2012/13 compared to 3.2% in 2011/12 becoming one of the fastest growing sectors contributing to employment opportunities and other related benefits. The sector contributed 13.7% to the total Gross Domestic Product (GDP) in 2012/13 alone.
It is therefore imperative that government ensures that there is a well-developed National Construction Industry (NCI) to implement physical infrastructure projects.The Ministry of Works and Transport has the overall responsibility of ensuring that there is efficient regulation of the construction sector in Uganda. The Ministry develops the laws, policies and ensures proper coordination and monitoring of other key stakeholders in the construction industry.
The Office of the Auditor General conducted a value for money study to establish whether the MoWT has taken adequate measures to ensure effective oversight over the construction sector. The audit focused on the Department of Construction Standards and Quality Management and covered three financial years 2012/13, 2013/14 and 2014/15.
KEY AUDIT FINDINGS Government has made efforts to streamline the Construction Sector through formulation of the National Construction policy, reform of the roads sector and encouraging of research in new technologies. In spite of these achievements, the audit has identified areas of improvement to ensure proper oversight of the Sector by the Ministry of Works and Transport as outlined below:
1. Mandate of the Ministry of Works and TransportAs a regulator, the Ministry of Works and Transport is responsible for policy development, monitoring and oversight of the construction sector. However, this regulatory function is hampered by its continued involvement in the implementation of various road construction projects in the country. During the period 2012/13 to 2013/14, the Ministry signed contracts for road construction works to the tune of UGX 50.2bn many of which are still being executed and supervised by the Ministry. This is in conflict with its oversight role and impacts negatively on its performance.
EXECUTIVE SUMMARY
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
iv
2. Development of Policies, Laws and StandardsWhereas the Ministry had managed to develop a policy for Development and strengthening the National Construction Industry (2010), there has been minimal progress to enact a law establishing the Uganda Construction Commission Industry to effectively regulate the Sector. The Ministry had planned to operationalize the Building Control Act(2013) by 30th June 2015; however, the accompanying regulations and the National Building Code required to operationalize it had not been developed. Similarly, the establishment of the National Building Review Board Secretariat planned by 30th June 2015 as prescribed by the Building Control Act 2013 to oversee the activities under building works and ensure adherence to the set rules and regulations, had not been put in place by December 2015.
In the absence of a building code, the country is exposed to higher risks of substandard construction and massive loss of human lives and infrastructure. Furthermore, the delay to put in place the Review Board means that there is no mechanism for enforcement of the key aspects of the Act, such as, monitoring building developments, overseeing, inspection and monitoring building committees and prescription of fees to be charged by the committees. It also means that there is no appeal mechanism for persons dissatisfied with the permitting process.
3. Strengthening and Support to Regulatory and Professional Bodies
The Ministry did not support secretariats of the regulatory bodies or review statutes, professional ethics and codes of conduct for members of each learned society (professional bodies) as required under the National Construction Industry Policy. Inadequate oversight over such regulatory bodies may breed conflicts of interest within the bodies, inadequate qualification requirements and more frequently inadequate discipline allowing incompetent or negligent practitioners to continue practicing regardless of their track record. This may eventually impact negatively on the quality of construction works.
4. Dissemination of Policies, laws, guidelines and standards
Throughout the 3 years under review, the Ministry prioritized and received funds for the dissemination of policies, guidelines and standards. However, an interface with District Engineers revealed that the Ministry had not circulated the Construction Policy as required under the Implementation Strategy. It was also established that no standards, guidelines or manuals had been disseminated for the last 10 years.Without access to the policy, manuals, standards and guidelines and training on their application the quality of construction works is compromised as the stakeholders never get to appreciate the standards.
5. Research on Construction MaterialsWhereas during the three years under review the Ministry planned and provided for research activities under the three departments of public structures, roads and bridges and construction standards, the funds received were expended on other activities.Failure to conduct research on construction materials or new technologies deprives the Ministry of the benefits accruing from technological advancements and innovations in the construction industry.
6. Monitoring of Compliance to construction standards
The department of construction standards and quality management is charged with the responsibility for conducting technical compliance audits to check compliance to set engineering standards governing roads and building works.It was established through review of the technical compliance reports that out of the planned 138 local governments, only 76 (representing 55%) were inspected for compliance to the set engineering standards. Furthermore, the Ministry was not monitoring road construction activities of other key agencies, such as, UNRA, Kampala City Council Authority (KCCA) and the Ministry of Local government, in spite of the fact that they are the major players in the construction sector.
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
v
Similarly, out of the one hundred and thirty planned inspections for compliance standards under the program for public structures, only forty-eight (representing 37% performance) were inspected. Failure to prioritise monitoring activities hinders achievement of set annual targets, thereby compromising the quality of the construction works. In the absence of a follow-up mechanism, timely corrective action may not be taken by the audited local governments to enhance compliance with set standards.
7. Coordination of StakeholdersThe Policy requires the Ministry in charge of public works to take responsibility for the coordination of line ministries and other stakeholders through establishment of Uganda Construction Industry Commission (UCICO). It was observed that there are many government ministries undertaking public works, particularly road works, such as the, Ministry of Local Government and the Ministry of Lands and Urban Development but there is no mechanism in place to ensure that their activities are properly coordinated to enable government to tap their synergies. The Construction commission which was to play the coordination role is yet to be established because the Ministry has not undertaken the adequate steps necessary for its establishment.
RECOMMENDATIONS1. The Ministry should refocus on its core mandate to enable effective provision of oversight
in the Construction Sector.2. The Ministry should always ensure that the funds received for oversight activities are
utilized towards the intended purposes3. The Ministry should expedite the finalization of the UCICO bill and development of the
Regulations and the Building code as planned. In addition, funding earmarked for such activities should be put to the intended purpose to enable the realization of the planned outputs.
4. The Ministry should prioritise the review of the roads manuals, standards and guidelines to take into account the current road traffic in the country.
5. The Ministry should always endeavour to disseminate the standards and training of stakeholders and also ensure that funds are utilized as intended to create awareness on quality aspects in the industry. Besides, holding workshops and seminars, the Ministry should also strive to strengthen its resource centre so that relevant information can be easily accessed.
6. The Ministry should always endeavor to carry out research activities as planned so as to promote the use of new and improved technologies, such as, usage of local construction materials.
7. A mechanism should be established to enable the follow-up of recommendations made in the technical compliance audit reports.
8. The Ministry should put in place a mechanism for proper coordination of MDAs implementing public works projects to avoid duplication of resources
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
vi
OVERALL AUDIT CONCLUSIONThe need to develop and support the national construction industry has for the last years been a priority on the national development agenda. It was envisaged that the implementation of the Construction policy would greatly contribute to the Government’s efforts in addressing the need for sustainable development based on effective public/private sector partnership.In spite of its mandate to formulate policy and provide oversight over the Construction Sector, the Ministry had continued to get involved in the implementation of various road construction projects in the country. In addition, the Ministry had not yet enacted a law to regulate the construction industry.
No support had been provided by the Ministry to the Regulatory and professional bodies to facilitate the review of the statutes, professional ethics and codes of conduct of members in the profession.
There was also very little the Ministry was doing in terms of research in new technologies, developing and enforcement of standards and monitoring the construction sector, a problem attributed to failure by the Ministry to put the resources allocated for the purpose to the intended use. If the Ministry is to play its oversight role effectively, it is imperative that funds allocated are optimally utilized to oversee the construction sector.
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
1
CH
AP
TER
ON
EC
HA
PTE
R O
NE
1
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
2
INTRODUCTION
1.1 BACKGROUND TO THE AUDITThe Construction Industry in Uganda comprises both the building and civil engineering works and these contribute greatly to the Ugandan economy in delivering the physical infrastructure. The Construction Industry is vital to the country’s economic development through the creation of business opportunities to suppliers of construction inputs, manufacturers of construction equipment, private contractors, materials laboratories and offering employment to professionals such as project managers and consultants, skilled (architects, surveyors and engineers) and unskilled labor as well.
Over the years, Government has increasingly realized that the management of the country’s physical infrastructure requires collaboration of the public and private sector. Government is also divesting itself of direct service delivery in order to improve the efficiency and effectiveness of public services. It is, therefore, imperative that government ensures that there is a well-developed National Construction Industry (NCI) to implement physical infrastructure projects.
1.2 MOTIVATIONIn Uganda, the construction sector grew by 8.2% in 2012/13, compared to 3.2% in 2011/12 becoming one of the fastest growing sectors contributing to employment opportunities and other related benefits. The sector contributed 13.7% to the total GDP in 2012/13 alone.1
Despite the growth, the sector still experiences challenges. The weak regulatory framework in the construction sector is one of the fundamental weaknesses in the industry demanding immediate attention. There is a consensus that the Public Health Act is too generic and out of date to address the sector’s special needs2.
According to the UN National Policies Review Report, 2011, the ineffectiveness of the regulators is a reflection of the shortcomings of the laws that established the institutions and defined their mandates. A combination of laws that do not empower institutions to act and a narrow scope of mandate have rendered them even weaker.
Furthermore, coordination deficiencies have been identified in the road construction sector which include: lack of common objectives across institutions like Ministry of Local Government, UNRA and Ministry of Lands, departments and agencies on transport issues , lack of integration between planning and delivery process across departments due to lack of comprehensive project cycle guidelines and divergence between wider government objectives
1 Statistical Abstract 2013 Pg 602 UN National Policies Review Report 2011 Page 71
CHAPTER ONE
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
3
(economic, social) and strategic transport objectives3 .In addition, a report on assessing public expenditure governance in Uganda’s road sector, 2014 reported lack of adequate capacity in the MoWT to undertake the monitoring of multiple projects being implemented concurrently as a major weakness in the sector.
The same report also indicates that Uganda is a member of the construction sector transparency (CoST) initiative which aims at promoting transparency and accountability in the construction sectors of member countries.However, there is a concern about the integrity of information on the roads sector, especially information on the condition of the road network. The road condition surveys are not consistently undertaken across the different institutions involved in implementation of road works. The implementing institutions and decision making processes too remain inaccessible to the majority of stakeholders.
It was on this basis that the Office of the Auditor General undertook the value for money audit to assess the extent to which the Ministry of Works was playing its oversight role of regulating the construction sector.
1.3 DESCRIPTION OF THE AUDIT AREA1.3.1 General DescriptionThe Ministry of works and transport has the overall responsibility of ensuring that there is effective regulation of the construction sector in Uganda. The Ministry develops the laws, policies and ensures proper coordination
3 ACODE Policy Research Series No.66 2014 Page 21 & 22
and monitoring of other key stakeholders in the construction industry. The Ministry executes this regulatory mandate through the Department of Construction Standards and Quality Management in close collaboration with the departments of Public structures and, Roads and Bridges. In the process of regulating the sector, the Ministry liaises and coordinates with other stakeholders namely: UNRA, KCCA, professional bodies, UNBS and the private sector, Ministry of Lands Housing and Urban Development, Ministry of Local Government and other project implementing MDAs.
1.3.2 Legal Frame work for Regulation the Construction sectorThe MoWT derives its mandate for regulating the construction sector from section 6.2 of the Policy for Development and Strengthening of the National Construction Industry 2010. In addition to the policy, the construction sector is regulated by the Building Control ACT (2013) and Uganda National Roads Authority (UNRA) ACT (2006)-Regulations, Uganda Road Fund (URF) ACT (2008)-Regulation. Furthermore professionals in the sector are regulated under the Engineers Registration ACT (Cap 271)-Regulations, Architects Registration ACT (Cap 269)-Regulation, and Surveyors Registration ACT (Cap 275)-Regulation. According to the National Construction Policy, MoWT is the policy implementing agency with the responsibility of oversight of the Uganda Construction Industry Commission and the regulatory bodies and coordination of the line ministries and other stakeholders.
1.3.2.1 Mandate“To plan, develop and maintain an economic, efficient and effective works and transport infrastructure and services; manage public buildings and develop standards in the construction industry”Vision“Reliable and safe works and transport infrastructure services.”Mission“To promote adequate, safe and well maintained works and transport infrastructure and services for socio-economic development of Uganda”.
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
4
1.3.2.2 Activities of the Ministry of Works and Transport• Developingpolicies,laws,standards,andguidelinesthatwouldensureeffective,safe,
efficient and adequate delivery of services in the construction industry.• Enforcingandregulatingthenationalconstructionstandards,testingandresearching
on materials of construction and evaluation of pavement/structures; • ProvidetechnicalsupportservicestootherGovernmentdepartmentsandagencies;• Monitoringtherelevantactivitiesintheconstructionindustry.Regulationofprofessionals
in the construction industry;• Regulatingandcoordinatingthenationalconstructionindustry;and• InitiateandformulateplansandpoliciesforthemanagementofPublicBuildings.
1.3.3 Organizational StructureThe regulation of the construction sector directly falls under the Directorate of Engineering and Works and this consists of 4 departments, namely: Construction Standards and Quality Management, Public Structures, Roads and Bridges, and Mechanical Engineering Services, which play various roles in regulating the sector. The details of the structure are shown in Appendix I.
1.3.4 FundingThe funding for the regulation of the construction sector is provided for under the Directorate of Engineering and Works where three departments have been allocated funding for the above activities. Details are attached in Appendix II.
1.3.5 Audit ObjectiveThe overall objective of the audit was to establish whether the MoWT has taken adequate measures to ensure effective oversight over the construction sector.
1.3.6 Audit QuestionsThe audit sought to answer the following audit questions which were developed from the overall audit objective: Qn 1: To what extent has the Ministry put in place the necessary legal/regulatory framework
to ensure proper oversight of the construction sector?Qn 2: To what extent has the Ministry ensured that the developed policies, laws, guidelines
and standards are disseminated?Qn 3: To what extent has research been conducted?Qn 4: How effective are the monitoring activities in ensuring stakeholder compliance with
the developed standards?Qn 5: What is the level of coordination between MoWT and, Line Ministries and other
Stakeholders?
1.4 AUDIT SCOPEThe audit focused on the effectiveness of the current measures geared at ensuring effective oversight of the construction sector by the Ministry of Works and Transport. The key focus area was the department of construction standards and Quality Management. A sample of district engineers and materials laboratories were visited to assess the extent to which the set standards have been disseminated and adhered to, and challenges experienced by the stakeholders in application of the set standards. The audit also involved visiting key government implementing agencies such as UNRA,KCCA and Ministry of lands to assess the level of coordination between them and the Ministry of Works and Transport. The audit covered three financial years 2012/13, 2013/14 and 2014/15.
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
5
CH
AP
TER
TW
OC
HA
PTE
R T
WO
2
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
6
AUDIT METHODOLOGYThe audit was conducted in accordance with the International Organization of Supreme Audit Institutions(INTOSAI) Performance Auditing Standards and the Value for Money Auditing guidelines prescribed in the Office of the Auditor General (OAG) VFM audit manual. The standards require that the audit is planned in a manner which ensures that an audit of high quality is carried out in an economic, efficient and effective way and in a timely manner.
2.1 SAMPLINGThe main focus of the study was on the processes within the Ministry of works for regulating the construction sector. To assess the effectiveness of the measures undertaken by MOWT, a sample of twelve (12) districts was selected seven of which had been monitored by MoWT and five not monitored on the application of the set engineering standards during the three years under review. The selection also included the three statutory bodies in the construction industry namely; Engineers Registration Board, Architects Registration Board, Surveyors Registration Board; the different Materials Testing laboratory branches in Gulu, Jinja, Mbarara, Kabarole and Mbale, Uganda National Roads Authority, Uganda Road Fund and Ministry of Lands, Housing and Urban Development, and Kampala Capital City Authority.
The districts selected were categorised according to the regions they are located. Three districts were selected from all the four regions that is East (Jinja, Mbale and Kamuli), Central (Masaka, Mityana and Mubende), West & South (Mbarara, Kabale and Kabarole), North (Gulu, Arua and Nebbi) This was done on the basis of districts monitored in the region by the Ministry and those that had not been visited by the MoWT during the period under review.
2.2 DATA COLLECTION METHODSThe data collection methods used involved document review, conducting interviews and physical inspections.
CHAPTER TWO
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
7
Table 1: Methodology used
Audit Question Methodology used
Qn 1. To what extent has the Ministry put in place the necessary legal/regulatory framework to ensure proper oversight of the construction sector?
The team reviewed the Policy for Development and Strengthening of the National Construction Industry, .the Building ACT, UNRA ACT, Road Design manuals, Standards and guidelines to appreciate the Construction sector regulatory aspects and interviews held with the MoWT Commissioners of the different programmes and district engineers to establish their roles Details of the reviewed documents and purpose for the review can be seen in Appendix III.
Qn 2: To what extent has the Ministry ensured that the developed policies, laws, guidelines and standards are disseminated?
The team reviewed MoWT Ministerial Policy Statements, budgets and training reports to ascertain the level of dissemination and training carried out, funds spent on dissemination and training of stakeholders on the use of standards, guidelines and manuals. The team also visited materials testing laboratories in selected districts, district local governments to ascertain their awareness, use and level of implementation of the set guidelines, standards and specifications.
Qn 3: To what extent has research been conducted?
The team conducted interviews with the Commissioner Quality Standards to establish whether the research process is adequate to achieve the desired objective.The team also interviewed the staff in the materials testing laboratories across the different regions to establish the extent to which the results have helped in the research and development of new technologies. The team also reviewed Ministerial policy statements, work plans and budgets to ascertain the level of prioritization of the activity. Further details of interviewees are attached in Appendix IV.
Qn 4: How effective are the monitoring activities in ensuring stakeholder compliance with the developed standards?
The monitoring checklists used by the departments of construction standards and quality assurance were reviewed to assess their comprehensiveness. Monitoring reports were also reviewed to ascertain the frequency and scope of monitoring activities, and the extent follow-up of recommendations. The team also interviewed commissioner construction standards and commissioner public structures to understand the extent to which the monitoring activities deter noncompliance.
Qn 5: What is the level of coordination between MoWT and, the line ministries and other stakeholders?
The team interviewed key stakeholders involved in the regulation of the construction sector to assess the level of coordination. These stakeholders included the district engineers, chairperson Engineers Registration Board, Executive Director Uganda Road Fund, Commissioner Ministry of Lands, Housing and Urban Development, Head of Mt Elgon Mbale, and contractors. In addition correspondences amongst these stakeholders were reviewed.
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
8
CH
AP
TER
TH
REE
CH
AP
TER
TH
REE
3
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
9
CHAPTER THREE
SYSTEMS AND PROCESS DESCRIPTION
3.1 ROLES AND RESPONSIBILITIES OF KEY PLAYERS
Director of Engineering and Works-MoWTThe role of the director is to provide strategic direction, leadership and responsibility for formulation, monitoring and evaluating of policies, laws and regulations, setting and regulating, planning and design for engineering and works.
Commissioner Construction Standards and Quality Management-MoWTThe commissioner develops policies, regulations, standards and guidelines and monitors their compliance in the construction industry; regulating professionals in the construction industry and providing technical support services to other government departments and agencies. These activities are done through review of construction standards, carrying out compliance technical audits, testing of construction materials and conducting research.
Commissioner, Roads and Bridges-MoWTThe commissioner is responsible for developing laws, standards and guidelines that would ensure effective, safe, efficient and adequate delivery of services in the construction industry. He is also responsible for review of policy guidelines on construction and maintenance of roads and bridges.
Commissioner, Public Structures-MOWTThe commissioner is responsible for developing laws, standards and guidelines that would ensure effective, safe, efficient and adequate delivery of services in the construction industry. He is also responsible for the review of policy guidelines on construction and maintenance of buildings.
Uganda National Roads AuthorityTo advise Government on policy matters concerning roads generally and, to assist in the co-ordination and implementation of the policy relating to roads9. It is also the Agency responsible for managing the provision and maintenance of the National Roads network in a more efficient and effective manner and rendering advisory services to Government.
Uganda Road FundTo finance maintenance of public roads, facilitate the delivery of road maintenance services, create an environment that is conducive to the efficient and effective maintenance of public works.
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
10
Engineers Registration BoardTo regulate and control engineers and their activities within Uganda and advise Government in relation to those functions4.
Architects Registration BoardTo regulate and maintain the standard of architecture in the country; to register architects; and to prescribe or regulate the conduct of architects in Uganda5.
Surveyors Registration BoardTo regulate and control the profession of surveyors and the activities of registered surveyors within Uganda, and to advise Government in relation to those functions6.
District and Municipal EngineersTo supervise construction taking place in their areas of jurisdiction.
Uganda National Bureau of Standards.The role of UNBS is to formulate and promote the use of national standards in the various sectors.
3.2 PROCESS DESCRIPTION3.2.1 Development of policies, standards, guidelines, manuals, and specificationsA team headed by the Commissioner, Construction Standards carries out research drawing on past experience of practitioners and benchmarking it with policies, standards, guidelines, manuals and specifications of other countries on the regulation of the construction sector in order to develop drafts.
The development of policies, standards, guidelines and manuals is then spear-headed by the Commissioner, Construction Standards in consultation with the Commissioner Roads and Bridges, Commissioner Public Structures and, other stakeholders such as engineers, surveyors’ government ministries and departments, and training institutions. This is done through technical committees which are established to deliberate on standards, guidelines and manuals, for either roads
4 Section 3 of the Engineers’ Registration Act, 19695 Section 4 of the Architects Registration Act, Cap 2696 Section 3 of the Surveyors Registration Act, Cap 275
and bridges or buildings. The draft is then circulated by the Construction Standards officers to stakeholders and general public for comments which are then reviewed by the Ministry policy makers and incorporated in the final draft for presentation to National Standards Council of the UNBS for approval and declaration.
3.2.2 Dissemination of standardsThe approved and declared standards are then disseminated to key stakeholders by each of the different departments under the function of construction standards and quality management, such as, ministries and other government agencies, training institutions, local governments, contractors and the general public. Dissemination is done through training workshops to MDA’s, copies on the internet and various bookshops to all interested stakeholders and practitioners.
3.2.3 Monitoring for compliance to standards, polices and manualsTechnical Compliance auditsThe Commissioner, Construction Standards selects a sample of implementing agencies (Ministries, agencies, departments or local governments) to monitor and check on their compliance with the set policies, standards and manuals. During this process a team comprising of different experts develops a checklist to use in a cluster of local governments or the selected agencies to monitor their construction activities and check on their implementation of the standards. Included on the check list is ascertaining whether construction materials are tested for compliance with the set engineering standards. These technical compliance audits are conducted once every year. On conclusion of the audits a report is
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
11
prepared in which the key gaps noted and recommendations made are disseminated to stakeholders through regional workshops.
3.2.4 Review of standardsThe Commissioner, Construction Standards gathers performance feedback on the applicability and effectiveness of the previously set and/or existing engineering standards from implementing agencies, such as, Local Governments, Uganda Road Fund and UNRA. The Ministry, through consultative workshops with key players and implementing agencies then comes up with recommendations to be considered for improvement of the developed standards. The standards are then revised and modified by the Ministry and the whole process starts again from the point of implementation of policies, guidelines, manuals, standards and specification. 3.2.5 CoordinationMinistry of Works and Transport is mandated to promote, facilitate and supervise the construction industry in Uganda. However, for effective regulation of the sector there was need for coordination of these activities, especially when it comes to construction of roads and buildings.The construction industry ought to have been regulated through the involvement of various stakeholders, such as: Ministry of Lands, Housing and Urban Development, MoWT, Ministry of Local Government (MoLG), District Local Governments, Project contractors and engineers in order to harness the synergies that exist amongst the different stake holders.
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
12
CH
AP
TER
FO
UR
CH
AP
TER
FO
UR
4
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
13
CHAPTER FOUR
FINDINGS, CONCLUSIONS AND RECOMMENDATIONS
In an effort to streamline the construction sector, government formulated a construction policy to guide activities in the construction industry. It has also encouraged research in new technologies for use in the construction sector. However, despite these efforts, the study has identified some areas that require improvement in order to ensure improved oversight over the construction sector.
4.1 MANDATE AND REGULATORY FRAMEWORK FOR THE CONSTRUCTION INDUSTRY4.1.1 Mandate of the Ministry of Works and TransportMinistry of Works and Transport is mandated to plan, develop and maintain an economic, efficient and effective works and transport infrastructure and services; manage public buildings and develop standards in the construction industry. However, it was noted through review of financial records that the Ministry, in addition to its role of policy formulation and oversight, is also involved in the implementation of various road construction projects in the country. Review of the Ministry budgets and other financial records revealed that during the period 2012/13 to 2013/14, the Ministry signed contracts for road construction works to the tune of UGX 50.2bn, many of which are still being executed and supervised by the Ministry. Appendix V for details.
With the coming into force of the Construction Policy and new MoWT Establishment Structures, it was envisaged that the functions of policy formulation and oversight, and road administration (construction and maintenance) would be separated in order to have effective oversight over the sector. The continued involvement of the Ministry in the development and implementation of such projects is in conflict with its core mandate and may constrain the Ministry in fulfilling its oversight role in the Construction Sector.
Management ResponseThe Ministry continues to sign and implement infrastructure contracts due to institutional gaps, political directives and emergencies. The Ministry efforts to establish a DUCAR Agency which would be mandated with the development and maintenance of district and community access roads as well as bridges has not yielded much effort. There is therefore need for review of the mandate to include implementation of strategic projects of national importance, planning and coordinating national response to emergencies.
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
14
4.1.2 Development of Policies, Laws and StandardsThe key functions of the Ministry were to develop policies, laws, standards and guidelines for safe, efficient and adequate delivery of services in the construction industry.
a) Uganda Construction Industry CommissionSection 5.2.1 of the Policy for Development and Strengthening the National Construction Industry required MoWT to establish a Uganda Construction Industry Commission (UCICO) by an Act of Parliament to regulate the construction industry.
It was noted through document review that whereas the Ministry had managed to develop a policy for Development and strengthening the National Construction Industry (2010), the Act for the establishment of the Uganda Construction Commission Industry had not been enacted. The enactment of the UCICO Bill had been planned to be effected by 30th June 2012 but to date (5 years down the road) not much progress has been achieved.The major objectives of the bill were to establish the Uganda Construction Industry Commission to regulate and coordinate the construction industry, register contractors, consultants and other service providers engaged in the national construction industry.
Through an interview with the principal engineer under the programme of construction standards, the team was informed that the delay to finalize the bill was caused by limited funding that could not allow the different committees to convene and discuss standards in the different aspects of construction for subsequent incorporation in the bill. These aspects include materials testing, safety and occupational health and the building code. However, review of the Ministry policy statements and underlying financial records relating to the three years under review revealed that whereas the Ministry had planned to submit the draft UCICO Bill to cabinet and 64% (Table 2 below refers) of the budget was released for that purpose, among others, there was no documentary proof of implementation of this activity as detailed in Appendix VI.
Table 2: Funding for Development of policies under department of construction Standards
Financial YearConstruction Standards Department(Development of Policies, Laws and Standards)(UGX ’000’)
Planned Amount Released Actual Expenditure
2012/13 695,651 296,378 84,822
2013/14 1,420,033 959,924 655,916
2314/15 1,020,516 748,432 937,511
Totals 3,136,200 2,004,734 1,678,249
Source: OAG Analysis of budgets, releases and IFMS
The delay to enact the UCICO Act means that key functions envisaged under the Construction commission, including, but not limited to registration, classification and monitoring of contractors, consultants, suppliers and manufacturers that qualify to tender services in the construction industry, promotion of quality assurance cannot be effectively executed.
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
15
Management Response Whereas the UCICO Bill had been planned to be in effect by 30th June 2012, the process has not yet been concluded partly due to the protracted consultations involving the stakeholders in the Industry. A final consultative workshop was held on 16th April 2015. Drafting of the Cabinet Memo and submission of the Bill to the Cabinet will now proceed to conclusion.
b) Building Works LegislationAccording to the 5-year (2010/11-2014/15) implementation Action Plan of the Policy for the Development and Strengthening the National Construction Policy, review of Government policies and strategies was to be concluded by 30th June 2012. The Ministry had also planned to commence the operationalization of the Building Control Act by 30th June 2015. However, it was established through interviews with the Commissioner, Public Structures and review of documents that whereas the Building Act (2013) had been enacted, the accompanying regulations and the National Building Code required to operationalize it had not been developed. All building professionals should have a single point of reference that establishes common and transparent standards for public health, safety, f ire protection, structural efficiency and environmental integrity. A building code provides this set of uniform building regulations and standards for acceptable health and safety conditions in buildings. Usually compliance with building codes is mandatory for all practitioners. Without a building code the country is exposed to higher risks of exposure to substandard construction and massive loss of human lives and infrastructure.
In addition, whereas the Ministry had planned to set up a National Building Review Board secretariat by 30th June 2015 as prescribed by the Building Control Act 2013 to oversee the activities under building works and ensure adherence to the set rules and regulations the Board had not been put in place by the December 2015.The delay to put in place the Review Board means that there is no mechanism for the enforcement of the key aspects of the Act, such as, monitoring building developments, overseeing, inspection and monitoring building committees and prescription of fees to be charged by the committees. It also means that there is no appeal mechanism for persons dissatisfied with the permitting process.
The Ministry attributed the delay in operationalization of the Building Control Act to the transition in the heads of departments within the Ministry of Works and further explained that the activities that had been planned to operationalize the Act were then put on hold as there were no funds to finalise the development of the regulations and National Building Code.
However, review of the Ministry policy statements and the underlying financial records relating to the three financial years under review revealed that these activities were not implemented by the Ministry in spite of the budget allocations made towards them. Further details are shown in Appendix VI.Out of the budgeted amount of UGX1.4bn, the Ministry received a sum of UGX 1.02bn to cater for the development of the legislation under the programme for public structures as detailed in Table 3 below.
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
16
Table 3: Funding for development of building works legislation
Year Budgeted ‘000’ (UGX) Amount Released ‘000’ (UGX) Actual Expenditure ‘000’ (UGX)
2012/13 57,000 27,956 29,233
2013/14 726,800 517,383 521,858
2014/15 625,668 474,229 500,453
Totals 1,409,468 1,019,568 1,051,544
Source: OAG Analysis of MPS and IFMS system
Currently, the stakeholders are using the Public Health (Building) Rules (as developed from the Public Health Act, Cap 281) which are considered by the practitioners to be out-dated with regard to standards for structural designs, plumbing, electrical and mechanical installations, among others, and as such this undermines the achievement of the desired quality of construction.
Management ResponseOriginally the Bill had four documents comprising the Code and when the Act was passed by Parliament, an extra five (5) documents were added that would form the National Building Code. A concept paper that would lead to the operationalization of the Act was developed and approved by the Ministry’s Policy Meeting for implementation. The planned activities are now underway with the recently concluded working committee workshops held in October 2015 and they are expected to be concluded this Financial Year 2015/16.
c) Road Works LegislationThe current legislation governing road works comprise the Uganda Road Fund Act 2008, UNRA Act,2006; the Roads Act, Cap 358 (1949);the Access to Roads Act, CAP 350(1969); the Traffic and Road Safety Act, 1998, among others. The Ministry also developed the General Specifications for Roads and Bridge works and Force on Account Guidelines for road construction and the District & Urban Roads design Manual 2005. Records indicate that the Ministry had planned to review most of the above statutes, manuals and guidelines to make them relevant to the current environment. According to the Ministry, this was necessitated by the fact that some of the manuals and guidelines were developed at a time when there was less traffic. It was observed that the roads manuals and standards have not been revised to suit the current road network and environment. Whereas the Ministry attributed the delay to revise the manuals and guidelines to limited funding, analysis of the policy statements and underlying financial records indicated that UGX 6.3bn had been budgeted for this activity under the two programmes of Roads and Bridges and Construction standards during the years 2012/13, 2013/14 and 2014/15. However, out of a sum of UGX3.74bn (Table 4)that was released for the purpose, UGX 3.05bn was spent on other activities. Appendix VI refers for further details.
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
17
Table 4: Funding for development of road works legislation
Years Budget ‘000’ (UGX) Release ‘000’ (UGX) Actual Expenditure ‘000’ (UGX)
Roads & Bridges
Construction Standards
Roads & Bridges
Construction Standards
Roads & Bridges
Construction Standards
2012/13 1,017,452 695,651 516,660 296,378 61,886 84,822
2013/14 1,029,452 1,420,033 224,210 959,924 103,164 655,916
2014/15 1,158,139 1,020,516 994,529 748,432 1,209,003 937,511
Totals 3,205,043 3,136,200 1,735,399 2,004,734 1,374,053 1,678,249
6,341,243 3,740,133 3,052,302
Source: OAG Analysis of MPS and IFMS details
Roads constructed on the basis of out-dated manuals and standards may not achieve the desired quality and are prone to faster deterioration.
Management ResponseThe review of Standards and Manuals requires engagement of Consultancy services which cannot be adequately funded from recurrent budgets. The procurement of Consultants will proceed if resources are provided under the Development budget.
4.1.3 Strengthening and Support to Regulatory and Professional BodiesThe Policy for Development and Strengthening the National Construction Industry (2010) Sec 5.2.2 requires the Ministry to provide support to secretariats of the Regulatory bodies, review their statutes for effective regulation of the industry and Sec 6.2.2 (c) requires the Ministry to periodically review professional Ethics and Codes of Conduct for members of each of the learned societies in the construction industry. The current regulatory bodies include Engineers’ Registration Board, Architects’ Registration Board and Surveyors’ Registration Board and these work hand in hand with the professional bodies namely: Uganda Institute of Professional Engineers, Uganda Society of Architects and Institute of Surveyors of Uganda. All these bodies and associations operate under a separate legal framework and play various roles critical to the development and control of the construction sector.
It was established through interviews with the principal engineer construction standards that during the three year period under review, the Ministry did not support secretariats of the regulatory bodies or review statutes, professional ethics and codes of conduct for members of each learned society (professional bodies) as required. The Ministry has indicated that they are currently in the process of reviewing some of the sections of the statutes (ERA 1969), such as: Amendment of section 24, relating to Discipline of Engineering Professionals; Section 29 (A) on Code of Ethics and Section 29(B) on continuing professional development in order to address fundamental principles; fundamental rules; professional conduct and Enforcement of the Code of Ethics, among others.
Analysis of the budgets and expenditure for strengthening and supporting of regulatory and professional bodies revealed that out of the released amount of UGX 247m, only UGX 63.4m was spent during the three years under review mainly towards payment of subscription fees but activities like review of statutes, professional ethics and codes of conduct and registration of engineers were not prioritized. Details of expenditure in relation to this activity can be seen in Appendix VII.
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
18
Inadequate oversight over such regulatory bodies may breed conflicts of interest within the bodies, inadequate qualification requirements and more frequently inadequate discipline allowing incompetent or negligent practitioners to continue practicing regardless of their track record. This may eventually impact negatively on the quality of construction works.
Management ResponseThe consultative process to amend the Engineers Registration Act, Cap. 271, has been concluded. The Draft Engineers Registration (Amendment) Bill, 2015 is planned for submission to Cabinet for approval by March 2016.
ConclusionIn spite of its mandate to formulate policy and provide oversight over the Construction Sector, the Ministry has continued to get involved in the implementation of various road construction projects in the country. This has negatively impacted on the effective provision of oversight in the Sector.In addition, the Ministry has not yet enacted a law to regulate the construction industry. Delays were also noted in the review of the existing roads manuals, standards and guidelines. No support has been provided to the Regulatory and professional bodies to facilitate review of the statutes, professional ethics and codes of conduct and in such circumstances, the legal/regulatory framework in its current state is not robust enough to enable the Ministry to provide effective oversight in the Construction Industry.
Recommendations• TheMinistryshouldrefocusonitscoremandate
to enable effective provision of oversight in the Construction Sector.
• TheMinistryshouldprioritisefinalisationofthe UCICO bill.
• TheMinistryshouldendeavourtofinalizethedevelopment of the Regulations and the Building code as planned.
• Inaddition,fundingearmarkedforsuchactivitiesshould be put to the intended purpose to enable the realization of the planned outputs.
• TheMinistryshouldalsoprioritisethereviewof
the roads manuals, standards and guidelines to take into account the current road traffic in the country.
• TheMinistryshouldensurethatstrengthening and support to the regulatory and professional bodies is prioritized as envisaged under the policy.
4.2 DISSEMINATION OF POLICIES, LAWS, GUIDELINES AND STANDARDSThe Implementation Strategy for the Policy for Development and Strengthening the National Construction Industry requires the Ministry for public works and transport to publicise the policy widely by producing and distributing copies to stakeholders and conducting workshops or seminars to highlight the key policy statements, strategies and required actions.It was established through interface with twelve (12) District engineers that the Ministry had not circulated the policy as required. This was also confirmed by the principal engineer responsible for construction standards who revealed that for the last ten years no standards, guidelines or manuals had been disseminated to stakeholders.
The audit team attributed the Ministry’s inability to disseminate the necessary policy, guidelines and standards to diversion of resources earmarked for the activity. For instance, whereas the Ministry had budgeted for dissemination activities under the output-development and dissemination of policies, laws and standards in the three departments (Roads and Bridges, Construction Standards and Public Structures) to the tune of UGX7.7bn over the three
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
19
years, a sum of UGX 4.1bn was spent on other activities out of the released amount of UGX 4.76bn as detailed in Appendix VI). Without access to the policy, manuals, standards and guidelines and training on their application, the quality of construction works is compromised as the stakeholders never get to appreciate the standards.
Management ResponseWhenever these documents are reviewed and updated, copies are made available to the MDAs However, due to the high level of staff turnover in the MDAs there is a tendency of staff to move with these documents wherever they relocate thus depriving the MDAs of the documentation. Otherwise copies of the documents are available in the Ministry both in hard and soft copy.In addition to holding of sensitisation seminars and workshops, the Ministry will strive to strengthen its Resource Centre so that relevant information can be easily accessed both in soft and hard form.
ConclusionWhereas the Ministry budgets for the dissemination of the developed policies standards and guidelines, the funds received in this regard are not utilised for the purpose.
RecommendationThe Ministry should always prioritize the dissemination of the standards and training of stakeholders and also ensure that funds are utilized as intended to create awareness on quality aspects in the industry. Besides holding workshops and seminars, the Ministry should also strive to strengthen its resource centre so that relevant information can be easily accessed.
4.3 RESEARCH ON CONSTRUCTION MATERIALSThe policy for the national construction industry requires the Ministry to undertake research and incorporate the research findings of new technologies in the specifications and standards for design and implementation of physical infrastructure facilities. To undertake this, during the three years under review the Ministry planned and provided for research activities under the three departments of public structures, roads and bridges and construction standards.It was established through interview with the Engineer-in-Chief that since 1990 when a research on Strengthening & Development of Materials Testing was undertaken, there has not been any other research carried out by the Ministry in spite of availability of personnel charged with that responsibility. The few research activities the Ministry was involved in were through collaboration with the donors but these have also not been finalized or completed.The inability to carry out research was partly a result of failure by the Ministry to put funds to the intended purpose. For example, the funds amounting to UGX 3.2bn that were released towards monitoring of compliance to construction standards and undertaking research were spent towards funding activities not related to the research function as detailed in Appendix IX.Failure to conduct research on construction materials or new technologies deprives the Ministry of the benefits accruing from technological advancements and innovations in the construction industry.
Management ResponseDeveloping and strengthening of quality management was a project under the Development budget that was used to fund research and procurement of laboratory equipment from 2003 -2010. Since then there has not been any dedicated funding towards research. Effective research undertaking is usually limited by availability of funds.
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
20
ConclusionThe Ministry does not undertake research as envisaged in the policy statements because of diversion of funding earmarked for the purpose. This hinders the adoption of new and improved technologies in the construction sector.
RecommendationThe Ministry should always endeavor to carry out research activities as planned so as to promote use of new and improved technologies such as usage of local construction materials.
4.4 MONITORING OF COMPLIANCE TO CONSTRUCTION STANDARDSThe Department of Construction Standards and Quality Management is charged with the responsibility for conducting technical compliance audits to check compliance with set engineering standards governing roads and building works.
Roads Works:It was established through interviews with the Commissioner, Construction Standards and review of the technical compliance reports that out of the planned one hundred and thirty eight (138) local governments, only seventy six (76) representing 55% were inspected for compliance with the set engineering standards. Further details are indicated in Table 5 below showing planned visits against actual visits for the three years under review.
Table 5: Planned Inspection on Road Works in Local Governments
Particulars Planned Visits Actual Visits
2012/13 49 28
2013/14 49 20
2014/15 40 28
Totals 138 76
Source: OAG Analysis of MPS and underlying financial records
Furthermore, the Ministry was not monitoring road construction activities of other key agencies, such as, UNRA, KCCA and Ministry of Local government in spite of the fact that they are the major players in the construction sector.
It was observed that for those local governments on which compliance audits were carried out, the Ministry did not have a follow up mechanism to track the progress made in implementation of recommendations. Some of the gaps mentioned in the reports (2013/14 and 2014/15) included failure on the part of districts to observe road reserves and conduct materials testing. According to the reports, the quality of materials was determined visually and by feeling.
Whereas the Ministry attributed this anomaly to limited funding for the above activity, analysis of the budgets, releases and underlying financial records also indicated that during the three year period, the Ministry budgeted for this activity under the two programmes of Roads and Bridges and Construction standards to a tune of UGX 3.06bn as indicated in Table 6 below:
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
21
Table 6: Funds budgeted and allocated for monitoring activities on road works
Years Budget Amount Released Actual Expenditure
Roads & Bridges ‘000’(UGX)
Construction Standards ‘000’ (UGX)
Roads & Bridges‘000’ (UGX)
Construction Standards‘000’ (UGX)
Roads and Bridges‘000’ (UGX)
Construction Standards ‘000’ (UGX)
2012/13 159,060 98,000 46,027 24,942 115,424 73,918
2013/14 148,000 905,618 126,577 651,326 138,960 689,344
2014/15 348,000 1,405,618 325,314 1,066,593 312,093 1,115,540
Totals 655,060 2,409,236 497,918 1,742,861 566,477 1,878,802
3,064,296 2,240,779 2,445,279
Source: OAG Analysis of MPS and IFMS system
However out the released amount of UGX 2.24bn for this purpose, UGX2.45bnwas spent on other activities as detailed in Appendix IX.
Building WorksAudit established through interviews with the Commissioner Public Structures and document review that out of the one hundred thirty planned inspections for compliance standards in the program for public structures; only forty eight (representing 37% performance) were inspected. Details of planned inspections for compliance can be seen in Table 7below.
Table 7: Planned Inspection on Building Works in Local Governments
Particulars Planned Actuals
2012/13 40 23
2013/14 40 13
2014/15 50 12
Totals 130 48
Source: OAG Analysis of MPS and underlying financial statements
Whereas the Ministry attributed this anomaly to limited funding for the above activity, analysis of the budgets, releases and underlying financial records indicated that the Ministry budgeted for this activity under the programme of public structures to a tune of UGX 2.05bn as indicated in Table 8 below:
Table 8: Funds budgeted and actuals received for monitoring building works
Year Budget ‘000’ (UGX) Release ‘000’ (UGX) Actual ‘000’ (UGX)
2012/13 643,101 130,545 48,500
2013/14 626,916 129,317 47,689
2014/15 786,193 704,922 718,156
Totals 2,056,210 964,784 814,345
Source: OAG Analysis of MPS and IFMS system
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
22
However of UGX 964m that was released, a sum of UGX 814m was spent onunrelated activities. (Details in Appendix VIII)Failure to prioritise monitoring activities hinders achievement of set annual targets, thereby compromising quality of the construction works. In the absence of a follow-up mechanism, timely corrective action may not be taken by the audited local governments to enhance compliance with set standards.
Management Response
Road WorksThe effective monitoring of the MDAs activities is usually curtailed by limited funding.Feedback mechanisms and monitoring framework have been developed and will be continuously refined and implemented in order to perfect them.Monitoring of road works under UNRA, KCCA and MoLG will be intensified. An MoU for monitoring road works in District Local Governments and urban councils will be concluded between MoWT and URF to streamline their respective monitoring roles on the DUCAR network.Building WorksThe department of Public Structures is currently constrained in both its human resource capacity and facilities because it is getting a lot of MDAs’ requests and thus in trying to fulfil its mandate by attending to requests from MDAs, it finds that the exercise of monitoring on-going construction works is affected. The staffing level is at twenty five (25) in number out of the approved structure of thirty seven (37) and thus operating at 66% capacity. The remedy is to scale up the workforce and facilities/equipment/tools by recruiting more staff and a proposal has already been made to Ministry of Public Service.
ConclusionFailure to undertake monitoring activities as planned impacts negatively on set targets. Additionally, lack of a follow-up mechanism renders monitoring ineffective.
RecommendationThe Ministry should always ensure that funds received for monitoring activities are utilized as
planned. The Ministry should ensure that Annual Performance Agreements are signed with UNRA and MoUs entered into with other Agencies like KCCA, MoLG, Local and Urban Councils to streamline their respective monitoring roles. A mechanism should be established to enable follow-up of recommendations made in the technical compliance audit reports.
4.5 COORDINATION OF STAKEHOLDERSThe Policy required the Ministry in charge of public works to take responsibility for the coordination of line ministries and other stakeholders through establishment of a UCICO. It was established that coordination challenges are prevalent in the sector. For instance the review of documentation revealed that there are many government ministries undertaking public works particularly road works such as Ministry of Local Government under CAAIP ,District Support Livelihood programme, Millennium villages projects and; Ministry of Lands-Albertine Region Sustainable Development project and Municipal Council Infrastructure Projects. As explained earlier, the Ministry is also involved in the implementation of road works and ignoring its oversight role.Some of these works would ordinarily be undertaken by UNRA or other agencies and local governments mandated to implement them but owing to weaknesses in coordination government cannot harness the synergies that exist amongst the different players. The Construction commission which was to play the coordination role is yet to be established because the Ministry has not undertaken adequate steps necessary for its establishment. A review of the MPS for the three years and underlying financial records revealed that whereas the Ministry had planned for submission of a draft UCICO bill to cabinet and establishment of UCICO under the two outputs of ‘Policies, Laws, guidelines, plans and strategies and, ‘Monitoring and Capacity Building Support’, and a sum of UGX5.29bn released in this regard, UGX 4.8bn was not used for the intended purposes. Details can be seen in Table 9 below:
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
23
Table 9: Funds budgeted and received in relation to coordination activities
Financial Year
Development of Policies, Laws and Standards “000” (UGX)
Monitoring and Capacity Building “000” (UGX)
Planned Release Actual Exp Planned Release Actual Exp
2012/13 695,651 296,378 84,822 - -
2013/14 1,420,033 959,924 655,916 1,950,000 1,700,040 1,455,436
2014/15 1,020,516 748,432 937,511 1,848,866 1,589,054 1,684,717
Totals 3,136,200 2,004,734 1,678,249 3,798,866 3,289,094 3,140,153
Source: OAG Analysis of planned and actual expenditure
Management ResponseThe Ministry continues to perform its oversight role in the construction sector and also implement infrastructure works of national importance which are not catered for elsewhere. The Ministry is also involved in planning and coordinating national responses in emergencies in the sector. UCICO will take over the coordination role when it is eventually established in January 2017.In addition, the Draft Roads Bill scheduled for enactment by January 2017 will streamline the roles of MDAs in planning and implementation of road works.
ConclusionManagement’s efforts are appreciated. However, the Ministry has not put in place a coordination mechanism to harmonize the different stakeholder activities aimed at achieving of common goals in the Construction Sector. This results in duplication of activities and roles leading to resource wastage.
RecommendationThe Ministry should put in place a proper coordination mechanism among government entities implementing public works in order to harmonize their different activities and avoid duplication and resource wastage. In addition the Ministry should expedite the enactment of the UCICO bill to enhance coordination amongst the key government institutions and other stakeholders in the sector.
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
24
GLOSSARY OF TERMSBest practice: A desirable and appropriate standard, process, procedure, method or system in relation to the delivery process.
Construction: The act of building or constructing something.
Construction Industry: An industry that builds physical infrastructure and comprises the regulators, professionals, contractors, consultants, manufacturers and suppliers.Contractor: A person or body of persons who undertakes to execute and complete construction works.
Consultant: Any firm, or individual, joint venture or team of firms and or individuals engaged to give professional advice or service at a fee, but not as an employee of the party that engages it, him or her.
Labour Based Technology: The economically efficient employment of as great a proportion of labour as is technically feasible, to produce as high a standard of the physical infrastructure as demanded by the specification and allowed by the funding available.
Physical Infrastructure: A country’s fundamental system of transportation (roads and building) communication and other aspects of its physical capabilities.
Policy: Course of action that has been officially chosen and agreed upon by government or an organization.
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
25
LIST OF APPENDICES
APPENDIX I: ORGANIZATIONAL STRUCTURE
Ass. Comm. District & community access roads
Director/Eng and Works
and Quality Management Roads and bridges
Ass. Comm. Material
Ass. Comm. Quality assurance
Ass. Comm. Bridges and
drainage
Ass. Comm. Urban roads
Principal
Surveyor
Ass. Comm.
Public Structures
Mechanical Engineering Services
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
26
AP
PEN
DIX
II: F
UN
DIN
G O
F TH
E C
ON
STR
UC
TIO
N S
TAN
DA
RD
S A
ND
QU
ALI
TY M
AN
AG
EMEN
T A
CTI
VITI
ES:
Year
sO
utpu
tD
evel
op p
olic
ies,
Law
s, g
uide
lines
an
d st
rate
gies
Mon
itor
ing
& U
nder
taki
ng R
esea
rch
Mon
itor
ing
and
capa
city
bui
ldin
gR
egis
trat
ion
of E
ngin
eers
Pro
gram
me
Bud
get
(UG
X 00
0)R
elea
seAc
tual
Exp
(U
GX
000)
Bud
get
(UG
X 00
0)R
elea
seAc
tual
Exp
(U
GX
000)
Bud
get
(UG
X 00
0)R
elea
seAc
tual
Exp
(U
GX
000)
Bud
get
(UG
X 00
0)R
elea
se
Actu
al
Exp
(UG
X 00
0)
2012
/13
Roa
ds a
nd
brid
ges
1,0
17,4
52
516,
660
61,8
86 1
59,0
60
46,0
2711
5,42
4 9
8,94
0 35
,858
65,2
35
Con
stru
ctio
n St
anda
rds
695
,651
29
6,37
884
,822
98,
000
24,9
4273
,918
-
108,
000
50,0
00
Pub
lic
Stru
ctur
es 5
7,00
0 27
,956
29,2
33 6
43,1
01
130,
545
48,5
00 9
7,00
0 43
,790
58,9
83 3
5,00
0 12
,000
11,7
80
2013
/14
Roa
ds a
nd
brid
ges
1,0
29,4
52
224,
210
103
,164
148
,000
12
6,57
7 1
38,9
60
2,3
68,0
00
1,85
7,27
0 2
,350
,884
Con
stru
ctio
n St
anda
rds
1,4
20,0
33
959,
924
655
,916
905
,618
65
1,32
6 6
89,3
44
1,9
50,0
00
1,70
0,40
4 1
,455
,436
1
08,0
00
113,
817
Pub
lic
Stru
ctur
es 7
26,8
00
517,
383
521
,858
626
,101
12
9,31
7 4
7,68
9 3
5,00
0 25
,851
25,
938
35,0
0027
,398
2014
/15
Roa
ds a
nd
brid
ges
1,1
58,1
39
994,
529
1,2
09,0
03 3
48,0
00
325,
314
312
,093
1
,835
,000
1,
586,
873
1,6
75,7
31
Con
stru
ctio
n St
anda
rds
1,0
20,5
16
748,
432
937
,511
1,4
05,6
18
1,06
6,59
3 1
,115
,540
1
,848
,866
1,
589,
054
1,6
84,7
17
108
,000
Pub
lic
Stru
ctur
es 6
25,6
68
474,
229
500
,453
786
,193
70
4,92
2 7
18,1
56
362
,000
26
5,38
7 2
84,0
63
60,
000
43,8
39 5
1,63
9
TOTA
LS7,
750,
711
4,75
9,70
14,
103,
846
5,11
9,69
1 3,
205,
563
3,02
1,78
2 8,
594,
806
7,06
8,62
97,
476,
769
454,
000
247,
054
63,4
19
Sour
ce: O
AG A
naly
sis
of B
udge
ts a
nd A
ctua
l Exp
endi
ture
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
27
APPENDIX III: LIST OF DOCUMENTS REVIEWED
Document Reviewed Purpose of the Review
Statistical Abstract 2013To assess Uganda’s construction industry statistical performance
United Nations Conference on Trade and Development (UNCTAD)
To gather the various opinions of key construction players on the relevance of the existing laws
ACODE Policy Research SeriesTo assess the effectiveness of Uganda’s construction laws
Engineers’ Registration Act, 1969To establish the functions of the Engineering Registration Board
Architects Registration ACTTo establish the functions of Architects Registration Board in the construction industry
Surveyors Registration ACTTo establish the functions of Surveyors Registration Board in the construction industry
MoWT Inspection ReportsTo determine and asses the objectives and outputs of the inspection Reports
Policy for Development andStrengthening the NationalConstruction Industry – Uganda
To establish the different roles and functions of the various construction industry key players and the recommendations for the betterment of the construction Industry
Compliance Technical Audit ReportsTo obtain evidence on whether the set objectives were addressed.
Developed standards, guidelines and specifications
To assess their applicability to the construction industry.
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
28
APPENDIX IV: LIST OF INTERVIEWS CONDUCTED
Position Reason for interview
Engineer in chiefTo understand the role he plays in construction standards related to both roads and bridges and building works.
Commissioner Construction Standards and Quality Management
• To obtain the roles of construction standards and quality assurance
department in the regulation of the construction sector.
• To understand how the department relates with other MDA’s and other
key stakeholders in the industry.
• How compliance audits are carried out
• Frequency of monitoring and evaluation of planned activities especially of
MDA’s implementing construction projects of roads and bridges.
• To establish the major challenges to regulation of the construction sector
(Roads & Bridges)
• To establish suggested solutions to address the obstacles above to achieve
the intended objectives
Data collection Officer - UNRA
•The process of quality control and assurance in UNRA projects•How UNRA ensures compliance in all its projects •How UNRA relates with the MoWT Construction quality and assurance
department•Whether MoWT carries out any standards compliance audits for any of
the projects undertaken by UNRA
KCCA Director and Deputy Directors of Engineering and Technical Services
•The role of KCCA in regulation of the construction sector ( Housing, Roads and water works)
•The process for roads construction regulation by KCCA, what steps are followed and who are the key staff and priority documents used during this process
•How KCCA ensures compliance in all its projects•How KCCA relates with the MoWT Construction quality and assurance
department
Projects Manager - Uganda Institute of Professional Engineers (UIPE)
•Role of UIPE in the regulation of the construction sector•Role of UIPE in the governance of Engineers on construction projects•Challenges faced by UIPE•Suggested solutions to the challenges faced
Executive Director – Uganda Road Fund
•The operation framework of URF•How URF ensures quality compliance in all its projects•How URF relates with MoWT•Whether MoWT carries out compliance audit on URF funded projects•Whether URF makes proposals to MoWT regarding updates of existing
standards•Whether URF shares lessons learnt with MoWT on its projects•Challenges faced and suggested solutions
Chairman – Engineering Registration Board
•What carrier development activities ERB is carrying out for the registered members
•How ERB relates with MDAs •Challenges and suggested solutions
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
29
APPENDIX V: CONSTRUCTION WORKS EXECUTED BY MOWT
National Roads Division (MoWT) 2012/13
Road Name Location Contractor Contract Amount (UGX)
Interconnectivity programme
Buyobyo-Mutufu bridge, Buwasa Health Center IV-BuyobyoSubcounty,BuwalasiSubcounty-Nagudde,Bampanga-Mahaya,Sironko Trading center-Kibende, Busamaga Grower's Society-Mayitu-Katulu in Sironko District
Sironko Femisa International Ltd 255,887,550
Busabi-Namanda-Bugega in Butaleja District Butaleja Baino Technical services 216,657,000
Irundu Trading Center-Budipa Fish landing, Kabukye-Itanyinyi, Gwase-Nabitula,Bugaya-Beekula in Kamuli District
Kamuli Jid Construction Co.(U) Ltd 261,203,250
Olupe-Ongerei,Kaserede-Kokudulu,Kanyatam-Kakures,KanatamOlimai-Kabukol Swamp crossing and KumiOsera roads in Kumi District
Kumi M/s GQ Investments Ltd 213,034,500
Kidetok-Kanugu-Olwa-Obangin,Kadungulu-Iruko-Ajuba,Adwenyi-Tororo-Ogelak,Ogangai-Odapakol-Openduru,Ongota-Okokoma,Odwenyi-aagule,Oculura-Otimong
M/s Omole Drive Contractors 192,833,550
Bugeyo-Butamira (7Km) and Church Access road Kasu and Sons Engineering workshop Ltd
178,059,630
Kankamba-yanukuzi-Kalungulu (4.8Km),Kiwangala-Kigaba (3Km),Kyanukuzi-Ngereko-Kalugulu(5.7Km),Ngereko-Manja-Kigaba(2Km),Ngereko-Kalagala(2Km),Kaswa-Senya-Bisanje(4.7Km) and Nkoni-Kisansala-Mitimikalu(5.0Km)
M/s Efra Ltd 317,653,007
Kyambogo-Gayaza-Kakinzi-Buzirandulu-Kakabalayandwe (12.9Km) and Mwendangobe swamp crossing
M/s CGH Establishment Ltd
405,028,690
Kanyambeho-Katentebere-Gweri-Kaitambatamba-Rubingo road (4.4Km) and swamp crossing,Kagusu road (2.2Km)Gweri primary access road (1.2Km)
M/s Sixway engineering Works Ltd
355,959,870
Nyakisenyi-NyarugandoKabaranga-Murago-Nyakishoroza M/s Summit
Project Ltd 455,944,800
Pekele-Agujopi-Pamojoa M/s Alba engineering Works Ltd
242,835,495
Karamoja Roads Development Programme
Girik river-Lokales-Karita and Girika river bridge (30m span) Eastern builders
and Engineers 4,402,518,282
Loroo-KatekekileandMoroto-Nakiloro-Kenya Border roads Mulowooza&
Brothers 8,724,053,200
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
30
Lokichar-Turtuko-Nyakwae road & Construction of Nyakwea Bridge (21m span) M/s Omega
Construction 5,331,066,500
URBAN ROADS DIVISION
Kajara-Taxi park in Kyenjojo TC Kyenjojo Force on Account 320,000,000
District road in Kapchorwa TC Kapchorwa Force on Account 596,808,136
Bwanda Convent road Masaka Force on Account 628,492,426
Mwanga road in Nali Kyankwanzi Force on Account
BRIDGES DIVISION
Manafwa bridge
Marvel contrcators and Road Maintenance (u) Ltd
1,757,075,472
Aswa bridge Alkom Investments 186,201,400
Kaguta Bridge Coil(U) Ltd 1,421,849,000
Birara Bridge M & B engineers 1,765,894,500
Okokor Bridge MML Road construction Co. Ltd
400,037,000
Simu-Pondo bridge Hands Uganda 546,546,000
Mpongo swamp crossing M&B Engineers 689,213,700
Nyanga Swamp crossing Sixway Engineering Works Ltd
895,694,000
Saaka Swamp crossing Mulowooza& Brothers Ltd 2,687,205,557
Alla 2 Paerl Shelter promoters (U) Ltd 716,111,000
Social Infrastructure development for promoting and resettlement of IDPs in Northern Uganda Spencon services
Ltd (Package 1) 8,698,593
Subtotal 34,163,863,515
FY 13/14
Upgrading works on Kakungulu Estate Rds phase 2
Akright Kakungulu
M/s Summit projekt ltd 1,659,975,900
Rehabilitation of Irundu- Nakalongo- Buwangala. Gwase Pri Sch- Wagawaga- Idoome Lot 3 Buyende M/S Kasu & Sons
Eng Workshop 299,927,775
Rehabilitation of selected community access roads in Wakiso and Luwero Districts Luwero M/s Kato
Investments Ltd 1,427,492,400
Rehabilitation of Aminit- Oculio & Dokolo- Opai (12km). Abulabula- Opiya- Afrigoi (7km); Adwenyi- Agule (5km); Adukutu- Adiding(4km)& Agule- Pingiri- Akumoi- Okidi Lot 4
SerereM/s Wiyeda General Suppliers & contractors ltd
875,440,500
Rehabilitation of Kalagi- Musalaba- Kiszi- Ibanda- Kabare lot 11 Kyankwanzi M/s Tegeka
Enterprises Ltd 394,989,000
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
31
Rehabilitation of Omukajija- Rwemambo (5km); Buhumiro- Karo- Karungi- Katoma- Buhindaje river road (11km); Kagarama- Kyakabara Junction rd (6km) and installation of 3x2 500mm dia culvert at Buhinda rivercrossing
Ibanda and Rubirizi M/s Dawasihi Ltd 962,248,035
Rehabilitation of Kikonge- Rwemba H/C in Kitijo; Rwamabonda- Kabukyera Rutuguru Butamba- Kyenkike
Ntungamo M/s Near construction Ltd 501,044,250
Rehabilitation of Agwiciri- Anyongo Lot 10 KoleM/S Higstan technical Services ltd
287,623,350
Rehabilitation of Nive pri Sch rd (3km); Ociba coast rd (5km); Barifa stadium (4km); River-oil division Hqtrs (3km); Onduparaka (4km)
Arua M/s Concerted contractors Ltd 380,483,250
URBAN ROADS DIVISION
Reconstruction of 0.8km tarmac on Moi rd Kapchorwa TC Kapchorwa Force Account 568,032,000
Reconstruction of 0.8km tarmac on Julius Avenue Katakwi TC Katakwi Force Account 297,818,000
Construction of 2nd bituminous seal on Sika Mudali-Bwanda Convent rd Masaka Force Account 310,614,300
BRIDGES DIVISION
Construction of Agule Ferry Landing Kumi M/s Hands Uganda ltd 1,653,530,183
Construction of Okokorio Ferry Landing Katakwi M/s BVS construction Ltd 2,230,878,835
Construction of Nyagak bridge Zombo M/S Sixway Eng works ltd 619,039,300
Construction of Mayenze, Mwikaye and Lukale bridges in Manafwa district Manafwa
M/S Marvel Contractors and Road Maintenance Ltd
1,757,075,472
Construction of kaguta bridge Lira M/s Coil Ltd 1,421,849,000
Construction of Okokor bridge KumiM/s MML Road Construction Co. Ltd
400,037,000
Sub-total 16,048,098,550
Grand total 50,220,660,658
Source: OAG Analysis of Ministerial Policy Statements
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
32
AP
PEN
DIX
VI:
CO
MP
AR
ISO
N O
F P
LAN
NED
AG
AIN
ST A
CTU
AL
AC
TIVI
TIES
UN
DER
DEV
ELO
PM
ENT
OF
PO
LIC
IES,
LA
WS
Par
ticu
lars
Pro
gram
me
Pla
nned
Act
ivit
ies
Act
ual A
ctiv
itie
s Ex
pens
edB
udge
ted
(UG
X)R
elea
se
Act
ual
Expe
ndit
ure
Expe
ndit
ure
(UG
X)
2012
/13
Roa
ds a
nd
Bri
dges
Rev
iew
rep
orts
, col
lect
dat
a,
deve
lop
man
uals
and
gui
delin
esSe
ttle
men
t of u
tility
bill
s (E
lect
rici
ty a
nd W
ater
), C
onso
lidat
ed
Allo
wan
ce, T
rave
l to
Turk
ey
1,01
7,45
2,00
051
6,66
0,00
061
,886
,000
Con
stru
ctio
n St
anda
rds
Con
sult
ing
natio
nal c
onst
ruct
ion
indu
stry
sta
keho
lder
s.
Com
pilin
g a
repo
rt o
n co
mm
ents
fr
om s
take
hold
ers.
Pre
pare
a D
raft
Cab
inet
Mem
o fo
r U
CIC
O.
Pay
men
t of u
tility
bill
s, P
urch
ase
of c
able
s, w
ires
and
hea
dset
s, R
epai
r of
mot
or v
ehic
le69
5,65
1,00
029
6,37
8,00
084
,822
,000
Pub
lic S
truc
ture
s
Pro
duct
ion
and
dist
ribu
tion
of
the
Bui
ldin
g C
ontr
ol A
ctH
oldi
ng c
onsu
ltat
ive
mee
tings
/w
orks
hop
for
final
rev
iew
of
build
ing
regu
latio
ns, c
odes
and
gu
idel
ines
Appo
intm
ent a
nd in
augu
ratio
n of
the
Nat
iona
l Bui
ldin
g R
evie
w
Boa
rd(N
BR
B) a
nd s
ettin
g up
Se
cret
aria
t
Pay
men
t of u
tility
bill
s, s
uppl
y of
mea
ls a
nd r
efre
shm
ent,
mot
or v
ehic
le
mai
nten
ance
57,0
00,0
0027
,956
,000
29,2
33,0
00
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
33
2013
/14
Roa
ds a
nd
Bri
dges
Form
ulat
ing
polic
ies
in th
e ro
ads
subs
ecto
r, p
repa
ratio
n of
gu
idel
ines
and
man
uals
for
the
deve
lopm
ent a
nd m
aint
enan
ce
of r
oads
, bri
dges
and
dra
inag
e st
ruct
ures
Trai
ning
at C
SC, s
ettl
emen
t of b
ills
(tel
epho
ne, w
ater
and
ele
ctri
city
), co
nsol
idat
ed a
llow
ance
s, r
epai
r of
veh
icle
s, in
spec
tion
of IC
T eq
uipm
ent,
faci
litat
ion
for
offic
ial d
utie
s at
land
ing
site
s an
d f/
a, a
ir
ticke
ts, p
er d
iem
and
con
fere
nce
fees
in S
A,
1,02
9,45
2,00
022
4,21
0,00
010
3,16
4,96
4
Con
stru
ctio
n St
anda
rds
Rev
isin
g th
e ro
ads
act a
nd
acce
ss to
roa
ds a
ct, r
evie
win
g te
nder
doc
umen
ts fo
r ro
ad a
nd
brid
ge w
orks
, sub
mit
draf
t bill
fo
r la
w to
reg
ulat
e th
e na
tiona
l co
nstr
uctio
n in
dust
ry to
cab
inet
, pr
epar
ing
draf
t bill
for
amen
ding
th
e En
gine
ers
regi
stra
tion
act
(196
9)
Con
solid
ated
allo
wan
ce to
sta
ff, q
uart
erly
med
icat
ion
to s
taff
, ove
rtim
e al
low
ance
, set
tlem
ent o
f bill
s (w
ater
, ele
ctri
city
and
tele
phon
e), a
ir
ticke
t for
trav
el to
Nai
robi
, per
diem
and
faci
litat
ion
for
infr
astr
uctu
re
conf
eren
ce in
Sou
th A
fric
a, s
ubsi
sten
ce a
llow
ance
to c
arry
out
(in
vent
ory,
ass
essm
ent o
f off
icer
s du
e fo
r re
tirem
ent,
tech
nica
l au
dit o
f Mity
ana,
Mub
ende
and
oth
ers,
), fa
cilit
atio
n fo
r fo
llow
up
on
impl
emen
tatio
n of
PS
adm
inis
trat
ive
finan
cial
and
HR
M p
olic
ies,
pr
intin
g an
d su
pply
of p
ublic
ser
vice
cod
e of
con
duct
boo
klet
s an
d R
OM
gui
delin
es, p
er d
iem
trav
el to
Ista
nbul
, pre
side
nt’s
man
ifest
o pu
blic
atio
n, fu
el,
paym
ent o
f tui
tion
fees
, per
form
ance
enh
ance
men
t tr
aini
ng a
t Civ
il Se
rvic
e co
llege
, tra
nspo
rt o
n re
tirem
ent,
per
diem
to
atte
nd m
eetin
g on
sta
ndar
d ga
uge
railw
ay in
Mom
basa
,
1,42
0,03
3,00
095
9,92
4,00
065
5,91
6,79
4
Pub
lic S
truc
ture
s
Ope
ratio
naliz
ing
the
build
ing
cont
rol a
ct, a
ppro
ving
and
di
ssem
inat
ing
build
ing
regu
latio
ns, c
odes
and
gu
idel
ines
Off
ice
impr
est f
or o
ffic
e op
erat
ion
activ
ities
, fac
ilita
tion
for
payr
oll
veri
ficat
ion,
con
solid
ated
allo
wan
ces,
set
tlem
ent o
f bill
s (w
ater
, el
ectr
icity
and
tele
phon
e), p
aym
ent f
or a
ir ti
cket
s, c
onst
ruct
ion
of
side
dra
ins
alon
g Ju
lius
aven
ue, a
llow
ance
for
team
s co
ordi
natin
g pr
epar
atio
n an
d co
mpi
latio
n of
aud
it qu
erie
s, a
llow
ance
to c
oord
inat
e an
d pr
epar
e bu
dget
fram
ewor
k pa
pers
, fum
igat
ion
serv
ices
, fue
l, fu
nds
for
Mba
rara
reg
iona
l fee
der
road
s m
echa
nica
l wor
ksho
p, s
hort
listin
g of
app
licat
ions
for
jobs
at r
egio
nal w
orks
hops
, gua
rd s
ervi
ces,
per
di
em tr
avel
to K
enya
, pay
men
t of i
nter
net s
ervi
ces
from
Dec
201
3 to
M
arch
201
4, p
repa
ratio
n of
min
iste
rial
pol
icy
stat
emen
ts, a
ir ti
cket
s,
cate
ring
ser
vice
s, c
lean
ing
serv
ices
, per
die
m a
nd tr
avel
to S
outh
Afr
ica
for
conf
eren
ce (i
nfra
stru
ctur
e pr
ojec
t fin
anci
ng),
sitt
ing
allo
wan
ce fo
r co
ntra
ct c
omm
ittee
, fla
g st
ate
impl
emen
tatio
n w
orks
hop
726,
800,
000
517,
383,
000
521,
858,
261
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
34
2014
/15
Roa
ds a
nd
Bri
dges
Dev
elop
ing
man
uals
and
gu
idel
ines
, col
lect
ing
data
, re
view
ing
repo
rts,
Per
die
m to
trav
el to
Tur
key,
sub
sist
ence
allo
wan
ce to
att
end
inte
rnat
iona
l day
of t
he e
lder
ly, p
erdi
em a
nd v
isa
fees
to tr
avel
to
Cai
ro, a
llow
ance
for
staf
f wor
king
on
reha
bilit
atio
n of
moi
Ave
nue-
Kap
chor
wa
TC, c
onso
lidat
ed a
llow
ance
s, b
ills
(wat
er, e
lect
rici
ty a
nd
tele
phon
e), s
ittin
g al
low
ance
for
shor
t-lis
ting
appl
ican
ts fo
r B
isin
a fe
rry
crew
, fac
ilita
tion
for
hand
over
cer
emon
ies
for
F/A
for
wes
tern
and
ea
ster
n re
gion
s, fa
cilit
atio
n fo
r ve
rific
atio
n of
inte
rim
pay
men
t inv
oice
fo
r in
stal
latio
n of
fixe
d w
eigh
brid
ges,
insp
ectio
n an
d m
onito
ring
of
rese
alin
g w
orks
in u
rban
loca
l gov
ernm
ents
, per
die
m to
att
end
the
9th n
orth
ern
corr
idor
inte
grat
ion
sum
mit
kiga
li, fa
cilit
atio
n to
col
lect
da
ta fo
r fo
rmul
atio
n of
new
gui
delin
es fo
r ef
fect
ive
plan
ning
, per
die
m
to K
igal
i TIF
A bo
ard,
per
die
m a
nd tu
ition
whi
le tr
avel
ling
to G
alile
e,
allo
wan
ces
for
MoP
S pe
rson
nel t
o co
mpi
le M
inis
try
cont
ract
sta
ff
payr
oll,
serv
ices
ren
dere
d du
ring
laun
ch o
f sta
ndar
d ga
uge
railw
ay
proj
ect,
site
han
dove
r of
site
s, p
er d
iem
to a
tten
d re
view
wor
ksho
p fo
r ce
ntra
l cor
rido
r in
fras
truc
ture
dev
elop
men
t in
Tanz
ania
, per
die
m to
co
nduc
t due
dili
genc
e on
SG
S,
1,15
8,13
9,00
099
4,52
9,00
01,
209,
003,
444
Con
stru
ctio
n St
anda
rds
Subm
ittin
g dr
aft m
emo
to
cabi
net,
prep
are
a dr
aft c
abin
et
mem
o fo
r am
ende
d ER
A,
prep
are
TOR
s to
und
erta
ke th
e re
view
of g
ener
al s
peci
ficat
ions
fo
r ro
ads
and
brid
ges,
pre
pare
TO
Rs
for
deve
lopm
ent o
f ESI
A gu
idel
ines
for
wat
er a
nd r
ailw
ay
tran
spor
t pro
ject
s
Con
solid
ated
allo
wan
ces,
bill
pay
men
t (w
ater
, ele
ctri
city
and
te
leph
one)
, tec
hnic
al a
udit
of in
sir
onko
and
oth
er d
istr
icts
, ins
pect
ion
of r
egio
nal m
echa
nica
l wor
ksho
ps, t
rave
l to
Kig
ali,
mon
itori
ng o
f va
riou
s pr
ojec
ts, s
ittin
g of
con
trac
ts c
omm
ittee
, tra
vel t
o So
roti
for
NR
M
natio
nal c
eleb
ratio
ns, f
umig
atio
n se
rvic
es, m
onito
ring
and
insp
ectio
n of
land
ing
site
s, tr
eatm
ent,
atte
ndin
g ta
rehe
sita
cel
ebra
tions
in M
orot
o,
gath
erin
g in
form
atio
n fr
om M
inis
try
pers
onne
l in
upco
untr
y st
atio
ns, T
V an
noun
cem
ents
, pur
chas
e of
uri
nal a
nd to
ilet f
ittin
gs fo
r ad
min
istr
atio
n bl
ock,
mon
itori
ng o
f dep
loym
ent o
f F/A
equ
ipm
ent,
audi
t ver
ifica
tion
of c
ertif
icat
es, p
urch
ase
of p
ensi
on fo
rms,
pro
visi
on o
f med
ia a
nd
publ
ic r
elat
ions
ser
vice
s, R
esid
entia
l m
eetin
g fo
r th
e te
chni
cal t
ask
com
mitt
ee fo
r th
e pr
opos
ed D
evt b
y As
hok,
1,02
0,51
6,00
074
8,43
2,00
093
7,51
1,72
8
Pub
lic S
truc
ture
s
Hol
ding
con
sult
ativ
e m
eetin
gs/
wor
ksho
ps fo
r fin
al r
evie
w o
f bu
ildin
g re
gula
tions
, cod
es a
nd
guid
elin
es, a
ppoi
ntm
ent a
nd
inau
gura
tion
of th
e na
tiona
l bu
ildin
g re
view
boa
rd (N
BR
B),
cond
uctin
g a
recr
uitm
ent
exer
cise
for
for
NB
RB
se
cret
aria
t, ho
ldin
g w
eekl
y an
d m
onth
ly d
epar
tmen
tal a
nd
divi
sion
al m
eetin
gs a
nd m
inut
es
circ
ulat
ed
Dat
a co
llect
ion
on tr
affic
flow
pat
tern
s al
ong
l.kyo
ga, p
aym
ent o
f bill
s (w
ater
, ele
ctri
city
, tel
epho
ne),t
opog
raph
ic s
urve
y of
kab
iriz
i roa
d,
trav
el to
ber
lin, r
epai
r an
d se
rvic
ing
of fi
re e
xtin
guis
hers
, ins
pect
ion
of
wor
ks, a
tten
ding
NR
M c
eleb
ratio
ns, s
uppl
y of
mea
ls a
nd r
efre
shm
ents
, ae
rodr
ome
insp
ectio
n, a
dver
tisin
g fo
r co
ntra
ctor
on
luka
ya p
roje
ct,
repa
ir o
f veh
icle
s, s
uppl
y of
kitc
hen
appl
ianc
es, m
onito
ring
of r
oads
, si
te a
sses
smen
t and
ven
ue p
repa
ratio
n fo
r in
tern
atio
nal w
omen
’s d
ay
cele
brat
ion
in k
ibaa
le, p
aym
ent o
f tui
tion
fees
, pay
men
t of a
ir ti
cket
s,
stan
dard
gau
ge w
orks
hops
, fac
ilita
ting
audi
t ins
pect
ion
by P
PD
A, fo
llow
up
of p
rogr
ess
of r
epai
rs o
n M
V K
alan
gala
, ins
pect
ion
of c
onst
ruct
ion,
su
pply
of o
ffic
e co
nsum
able
s, p
rint
ing
and
supp
ly o
f Min
istr
y le
tter
head
s, s
uppl
y of
new
spap
ers
625,
663,
000
474,
229,
000
500,
453,
639
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
35
TOTA
LS7,
750,
711,
000
4,75
9,70
1,00
04,
103,
846,
000
Sour
ce: O
AG A
naly
sis
of b
udge
ts a
nd w
orkp
lans
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
36
AP
PEN
DIX
VII:
REG
ISTR
ATI
ON
OF
PR
OFE
SSIO
NA
LS P
LAN
NED
AG
AIN
ST A
CTU
AL
AC
TIVI
TIES
.
F/Y
Pro
gram
me
Pla
nned
Act
ivit
ies
Act
ual A
ctiv
itie
s Ex
pens
edB
udge
ted
(UG
X)R
elea
seA
ctua
l Exp
(UG
X)
2012
/13
Con
stru
ctio
n St
anda
rds
Con
trib
utio
n of
sub
scri
ptio
n fe
e fo
r 25
Reg
iste
red
Engi
neer
sC
ontr
ibut
ion
tow
ards
pay
men
t of s
alar
ies
for
the
Secr
etar
iats
Con
trib
utio
n to
war
ds m
aint
enan
ce o
f Sec
reta
riat
veh
icle
s
108,
000,
000
50,0
00,0
00
Pub
lic S
truc
ture
s
Pay
men
t of a
nnua
l sub
scri
ptio
n fe
es.
Pay
men
t of p
rofe
ssio
nal p
ract
ice
exam
s fo
r D
epar
tmen
t st
aff
Supp
ortin
g an
d m
onito
ring
act
iviti
es o
f pro
fess
iona
l bo
dies
.
Annu
al S
ubsc
ript
ion
for
arch
itect
s an
d su
rvey
ors
35,0
00,0
0012
,000
,000
11,7
80,0
00
2013
/14
Con
stru
ctio
n St
anda
rds
Pay
men
t of a
nnua
l sub
scri
ptio
n an
d co
ntin
uous
pr
ofes
sion
al d
evel
opm
ent,
supp
ort t
o ER
B a
nd U
IPE
secr
etar
iats
108,
000,
000
113,
817,
000
Pub
lic S
truc
ture
s
Annu
al C
ontr
ibut
ions
to in
tern
atio
nal p
rofe
ssio
nal b
odie
s,
annu
al s
ubsc
ript
ion
fees
for
arch
itect
s an
d su
rvey
ors,
m
onito
ring
and
sup
port
to s
urve
yors
and
arc
hite
cts
prof
essi
onal
bod
ies
35,0
00,0
0027
,398
,000
2014
/15
Con
stru
ctio
n St
anda
rds
Pay
men
t of a
nnua
l sub
scri
ptio
n an
d co
ntin
uous
pr
ofes
sion
al d
evel
opm
ent,
supp
ort t
o ER
B a
nd U
IPE
secr
etar
iats
108,
000,
000
Pub
lic S
truc
ture
s
Annu
al C
ontr
ibut
ions
to in
tern
atio
nal p
rofe
ssio
nal b
odie
s,
annu
al s
ubsc
ript
ion
fees
for
arch
itect
s an
d su
rvey
ors,
m
onito
ring
and
sup
port
to s
urve
yors
and
arc
hite
cts
prof
essi
onal
bod
ies
Con
trib
utio
ns to
pro
fess
iona
l an
d st
atut
ory
bodi
es,
subs
crip
tion
for
arch
itect
s an
d su
rvey
ors
in M
inis
try,
co
ntri
butio
n to
inte
rnat
iona
l pr
ofes
sion
al b
odie
s
60,0
00,0
0043
,839
,000
51,6
39,1
01
Tota
ls45
4,00
0,00
043
,839
,000
63,4
19,1
01
Sour
ce: O
AG A
naly
sis
of b
udge
t and
wor
kpla
ns
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
37
AP
PEN
DIX
VIII
: MO
NIT
OR
ING
AN
D C
AP
AC
ITY
BU
ILD
ING
PLA
NN
ED A
CTI
VITI
ES A
GA
INST
AC
TUA
L A
CTI
VITI
ES.
Par
ticu
lars
Pro
gram
me
Pla
nned
Act
ivit
ies
Act
ual A
ctiv
itie
s Ex
pens
edB
udge
ted
(UG
X)R
elea
seA
ctua
l Ex
pend
itur
e(U
GX)
2012
/13
Roa
ds a
nd B
ridg
es
-Sup
ervi
sion
-Rep
orts
pre
pare
d-R
oad
mai
nten
ance
usi
ng fo
rce
acco
unt
Con
solid
ated
Allo
wan
ce, S
uppl
y of
car
boni
zed
fuel
boo
ks fo
r pe
tro
98,9
40,0
0035
,858
,000
65,2
35,0
00
Con
stru
ctio
n St
anda
rds
Staf
f sal
arie
s fo
r U
CIC
O S
ecre
tari
at
Pub
lic S
truc
ture
s
Audi
ting
of c
onst
ruct
ion
wor
ks
unde
rtak
en b
y ot
her
depa
rtm
ents
an
d th
epu
blic
Pre
para
tion
of te
chni
cal a
sses
smen
t re
port
sSi
te in
spec
tion
and
test
ing
for
safe
ty
and
adhe
renc
e to
reg
ulat
ions
Con
solid
ated
Allo
wan
ce, P
urch
ase
of s
tatio
nery
, Per
diem
to
Turk
ey, S
ettl
emen
t of e
lect
rica
l and
wat
er b
ill, s
ettl
emen
t of
clea
ning
ser
vice
s97
,000
,000
43,7
90,0
0058
,983
,000
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
38
2013
/14
Roa
ds a
nd B
ridg
es
Atte
ndin
g pa
rlia
men
tary
pub
lic o
utre
ach
foru
m, r
epai
r of
ve
hicl
es, p
urch
ase
of m
etal
det
ecto
r, s
ettl
emen
t of b
ills
(tel
epho
ne, w
ater
and
ele
ctri
city
), ph
otoc
opyi
ng a
nd b
indi
ng,
supp
ly o
f gab
ion
boxe
s an
d m
attr
esse
s, s
uppl
y of
met
allic
cu
lver
ts,
2,36
8,00
0,00
01,
857,
270,
000
2,35
0,88
4,50
5
Con
stru
ctio
n St
anda
rds
Subs
iste
nce
allo
wan
ces,
ass
essi
ng a
nd m
onito
ring
dat
a co
llect
ion
on d
istr
ict a
nd u
rban
roa
ds, s
ettl
emen
t of b
ills
(wat
er, e
lect
rici
ty a
nd te
leph
one)
, fum
igat
ion,
dis
cuss
ion
of e
ngin
eers
reg
istr
atio
n bi
ll, a
tten
ding
NC
TTC
A m
eetin
g in
Kig
ali,
supp
ly o
f sta
tione
ry, i
nspe
ctio
n of
roa
ds, g
uard
se
rvic
es, a
tten
ding
pro
fess
iona
l dev
elop
men
t cou
rses
, se
rvic
ing
and
repa
ir o
f fir
e ex
tingu
ishe
r, p
ublic
atio
n of
pr
esid
ents
man
ifest
o, tr
affic
sur
veys
, con
stru
ctio
n of
sto
ne-
pitc
hed
drai
ns a
long
Jul
ius
aven
ue, s
uppl
y of
mea
ls, t
rave
l to
Buj
umbu
ra, t
rave
l to
Bag
amoy
o, tr
avel
to M
omba
sa,
trav
el to
kig
ali f
or a
irsp
ace
mgt
, rep
air
of v
ehic
les,
sup
ply
of
com
pute
r ca
rtri
dges
, sup
ply
of b
atte
ries
for
MV
kala
ngal
a,
trav
el to
Bei
jing
for
due
dilig
ence
on
CC
ECC
, sup
ply
of
curt
ains
and
net
s, m
aint
enan
ce o
f equ
ipm
ent f
or u
rban
ro
ads
rese
alin
g pr
ojec
ts.
1,95
0,00
0,00
01,
700,
404,
000
1,45
5,43
6,71
6
Pub
lic S
truc
ture
s
Trav
el to
Mom
basa
for
SGR
mee
ting,
dat
a co
llect
ion
on r
oad
safe
ty c
halle
nges
, att
endi
ng w
omen
’s d
ay c
eleb
ratio
ns,
trav
el to
Kig
ali f
or T
TCA
polic
y or
gans
mee
ting,
trav
el to
M
omba
sa fo
r IS
CO
S m
eetin
g
35,0
00,0
0025
,851
,000
25,9
38,6
18
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
39
2014
/15
Roa
ds a
nd B
ridg
es
Pro
curi
ng c
onsu
ltan
ts fo
r m
onito
ring
an
d ev
alua
tion
of N
atio
nal,
dist
rict
and
urb
an r
oads
; rev
iew
of
cons
ulta
nts
repo
rts;
trai
ning
of s
taff
Supp
ly o
f sta
tione
ry it
ems,
rep
air
of v
ehic
les,
car
ryin
g ou
t in
vent
ory
of T
oror
o-P
akw
ach
line,
topo
grap
hica
l sur
vey
of
L.B
isin
iya,
insp
ectio
n an
d m
onito
ring
of r
oads
, pre
para
tion
of p
relim
inar
y bu
dget
est
imat
es fo
r FY
15/1
6,as
sess
ing
of r
oad
safe
ty r
egul
atio
ns, m
onito
ring
of f
orce
acc
ount
ac
tiviti
es, r
esea
rch
fund
for
Msc
tech
nolo
gy I
nnov
atio
n an
d in
dust
rial
dev
elop
men
t, pa
ymen
t of b
ills
(wat
er, e
lect
rici
ty
and
tele
phon
e), i
nspe
ctio
n an
d m
onito
ring
of l
andi
ng s
ites,
re
habi
litat
ion
of k
asal
a-ki
ya-k
ikun
yu r
oad,
pay
men
t to
polit
ical
ass
ista
nts,
sup
ply
of c
ulve
rts,
follo
w-u
p of
rep
airs
on
MV
Kal
anga
la, f
acili
tatio
n to
TLB
mem
bers
, per
die
m
for
trav
el a
nd tr
aini
ng to
Gal
ilee,
con
vers
ion
of w
orks
hop
build
ings
into
off
ices
, sup
ply
of c
onst
ruct
ion
mat
eria
ls fo
r U
RR
uni
ts, p
aym
ent o
f tax
es fo
r pi
ck-u
ps
1,83
5,00
0,00
01,
586,
873,
000
1,67
5,73
1,86
1
Con
stru
ctio
n St
anda
rds
Subm
issi
on o
f dra
ft c
abin
et
mem
o fo
r es
tabl
ishi
ng o
f UC
ICO
, tr
aini
ng o
f sta
ff o
n qu
ality
con
trol
an
d m
anag
emen
t, un
dert
akin
g se
nsiti
zatio
n m
eetin
gs, r
evie
win
g en
gine
erin
g de
sign
s an
d te
nder
do
cum
ents
, rev
iew
ing
envi
ronm
enta
l im
pact
sta
tem
ents
, ass
essi
ng M
DA’
s te
chni
cal c
apac
ity g
aps,
car
ryin
g ou
t fie
ld v
isits
on
sele
cted
UN
RA
proj
ects
, fac
ilita
tion
wor
ksho
ps fo
r tr
aini
ng o
n in
nova
tion
tech
nolo
gies
Car
ryin
g ou
t tec
hnic
al a
udit
in v
ario
us d
istr
icts
, tra
vel t
o K
igal
i, pr
epar
atio
n of
bud
get f
ram
ewor
k pa
per,
pay
men
t of
tuiti
on, a
tten
ding
mee
ting
of E
AC c
ounc
il of
min
iste
rs,
asse
ssin
g co
nditi
on o
f lan
ding
site
s, s
uppl
y of
sta
tione
ry
item
s, p
aym
ent o
f bill
s (E
lect
rici
ty, w
ater
and
tele
phon
e),
trav
el to
DR
C, m
onito
ring
and
sup
ervi
sion
of c
omm
unity
ro
ads
in d
istr
icts
, sup
ply
of m
eals
and
ref
resh
men
ts, s
uppl
y of
pri
nted
mat
eria
ls, t
rave
l to
Swed
en, t
rave
l to
rwan
da
for
SGR
join
t tec
hnic
al c
omm
ittee
, con
sult
atio
n w
orks
hop
to d
iscu
ss th
e dr
aft E
ngin
eers
Reg
istr
atio
n bi
ll, p
aym
ent
of tu
ition
, sup
ply
of c
onst
ruct
ion
mat
eria
ls fo
r U
RR
uni
ts,
trav
el to
chi
na, t
rave
l to
Ger
man
y, p
rint
ing
and
supp
ly o
f M
inis
try
lett
erhe
ads,
1,84
8,86
6,00
01,
589,
054,
000
1,68
4,71
7,49
0
Pub
lic S
truc
ture
s
Supp
ly o
f com
pute
r ca
rtri
dges
, sup
ply
of u
tens
ils, t
rave
l to
Kig
ali,
repa
ir o
f air
con
ditio
ners
, ins
pect
ion
and
mon
itori
ng
of r
ehab
ilita
ted
and
cons
truc
ted
road
s, in
spec
tion
and
licen
sing
of P
SV in
nor
ther
n U
gand
a, p
urch
ase
of p
rese
nts
to v
isiti
ng m
inis
ters
, pay
men
t for
bill
s (w
ater
, ele
ctri
city
an
d te
leph
one)
, sup
ply
of n
ewsp
aper
s, tr
avel
to K
igal
i for
JT
C m
eetin
g, a
tten
ding
ISC
OS
mee
ting,
tech
nica
l aud
it of
di
stri
cts,
att
endi
ng c
ounc
il of
min
iste
rs in
Tan
zani
a, tr
avel
to
Kig
ali a
nd J
uba,
sup
ply
of e
quip
men
t for
dat
a re
cove
ry
cent
er, p
rint
ing
and
supp
ly o
f Min
istr
y le
tter
head
s, c
ondi
tion
asse
ssm
ent o
f roa
ds, p
rocu
rem
ent o
f sta
ff ID
s,
362,
000,
000
265,
387,
000
284,
063,
959
Tota
l8,
594,
806,
000
7,06
8,62
9,00
07,
476,
773,
149
Sour
ce: O
AG A
naly
sis
of b
udge
t and
wor
kpla
ns
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
40
AP
PEN
DIX
IX: M
ON
ITO
RIN
G A
ND
UN
DER
TAK
ING
RES
EAR
CH
; PLA
NN
ED A
GA
INST
AC
TUA
LS A
CTI
VITI
ES
Par
ticu
lars
Pro
gram
me
Pla
nned
Act
ivit
ies
Act
ual A
ctiv
itie
s Ex
pens
edB
udge
ted
(UG
X)R
elea
seA
ctua
l Exp
endi
ture
(U
GX)
2012
/13
Roa
ds a
nd
Bri
dges
-Ins
pect
ion
-Sup
ervi
sion
-Pre
para
tion
of r
epor
tsC
onso
lidat
ed a
llow
ance
and
sup
ply
of
carb
oniz
ed fu
el b
ooks
159,
060,
000
46,0
27,0
0011
5,42
4,00
0
Con
stru
ctio
n St
anda
rds
Con
duct
ing
test
ing
on c
onst
ruct
ion
mat
eria
ls s
ubm
itted
to th
e la
bora
tory
.C
arry
ing
out q
ualit
y co
ntro
l on
cons
truc
tion
site
s.U
nder
taki
ng r
esea
rch
on
cons
truc
tion
mat
eria
ls.
Car
ryin
g ou
t tes
ts
Rep
air
of s
helv
es a
nd c
abin
ets
in tr
ansp
ort
sect
ion,
Allo
wan
ce fo
r as
sets
ver
ifica
tion,
sup
ply
of s
tatio
nery
and
sup
ply
of c
arbo
nize
d fu
el
book
s
98,0
00,0
0024
,942
,000
73,9
18,0
00
Pub
lic
Stru
ctur
esSi
te in
spec
tion
and
test
ing
for
safe
ty
and
adhe
renc
e to
reg
ulat
ions
.
Sett
lem
ent o
f util
ity b
ills,
Con
solid
ated
Al
low
ance
, Pur
chas
e of
cab
les,
wir
es a
nd h
ead
sets
643,
101,
000
130,
545,
000
48,5
00,0
00
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT | A REPORT BY THE AUDITOR GENERAL
41
2013
/14
Roa
ds a
nd
Bri
dges
Allo
wan
ces
for
depa
rtm
enta
l act
iviti
es,
colle
ctin
g in
form
atio
n on
roa
ds u
nder
re
habi
litat
ion,
rep
air
of v
ehic
les,
mon
itori
ng
of d
istr
ict r
oads
, car
ryin
g ou
t ass
essm
ent
of K
alan
gala
land
ing
site
s in
vent
ory,
dep
osit
on fu
el, m
onito
ring
act
iviti
es o
f upc
ount
ry
aero
drom
es, c
ondu
ctin
g of
ficia
l oat
h an
d oa
th
of s
ecre
cy, a
tten
ding
mee
tings
on
SGR
in
Mom
basa
, ins
pect
ing
and
licen
sing
of i
nlan
d w
ater
ves
sel,
trav
el to
Nai
robi
for
SGR
join
t R
egio
nal f
inan
cing
mec
hani
sm, t
rip
to Is
rael
’s
Bus
rap
id tr
ansi
t sys
tem
s
148,
000,
000
126,
577,
000
138,
960,
626
Con
stru
ctio
n St
anda
rds
Tech
nica
l aud
it of
dis
tric
t roa
ds, s
ensi
tizat
ion
of
inla
nd w
ater
tran
spor
t ves
sels
, dat
a co
llect
ion
on s
elec
ted
road
s, d
iscu
ssio
n of
eng
inee
rs
regi
stra
tion
bill,
dis
cuss
ion
of a
men
dmen
ts
to th
e ro
ad a
ct, f
acili
tatio
n fo
r SG
R te
chni
cal
com
mitt
ee, a
tten
ding
64th
ses
sion
of t
echn
ical
co
mm
ittee
of I
MO
in L
ondo
n, s
uppl
y of
furn
iture
, tr
avel
to T
urke
y, tr
avel
to M
omba
sa, t
uitio
n fo
r m
aste
r’s
degr
ee, p
re-r
etir
emen
t tra
inin
g,
reco
rds
man
agem
ent a
nd p
erfo
rman
ce
enha
ncem
ent t
rain
ing,
pro
cure
men
t of
phot
ocop
ier
tone
rs, m
aint
enan
ce o
f equ
ipm
ent
for
the
urba
n ro
ads
rese
alin
g pr
ojec
t, se
rvic
ing
and
repa
ir o
f fir
e ex
tingu
ishe
rs
905,
618,
000
651,
326,
000
689,
344,
252
Pub
lic
Stru
ctur
es
Allo
wan
ce fo
r de
part
men
tal a
ctiv
ities
, att
endi
ng
wom
en’s
day
cel
ebra
tions
, fue
l, se
ttle
men
t of
bills
(wat
er, e
lect
rici
ty a
nd te
leph
one)
, add
ress
st
aff o
n di
scip
line,
per
form
ance
mgt
and
co
mpl
etio
n of
App
rais
al fo
rms,
insp
ectio
n of
co
nstr
uctio
n w
ork,
wor
ksho
p on
Tan
ga-A
rush
a-M
usom
a po
rt P
roje
ct,
626,
101,
000
129,
317,
000
47,6
89,9
70
2014
/15
Roa
ds a
nd
Bri
dges
Mon
itori
ng, p
repa
ratio
n of
rep
orts
Sett
lem
ent o
f bill
s (e
lect
rici
ty, w
ater
and
te
leph
one)
, out
of p
ocke
t and
tran
sit a
llow
ance
in
Indi
a, m
onito
ring
the
use
and
man
agem
ent
of r
oad
equi
pmen
t, de
sign
ing
and
deve
lopi
ng a
w
ebsi
te, i
nspe
ctio
n an
d m
onito
ring
of l
andi
ng
site
s on
L.V
icto
ria,
col
lect
ing
data
on
new
pe
rson
nel r
ecru
ited
unde
r F/
A, p
erdi
em a
nd
tuiti
on w
hile
trai
ning
in G
alile
e, fu
el d
epos
it,
cons
olid
ated
allo
wan
ces,
reh
abili
tatio
n of
ka
sala
-Kiy
a-K
ikun
yura
od b
y Fo
rce
Acco
unt,
cond
uctin
g du
e de
ligig
ence
SG
S, in
spec
tion
and
veri
ficat
ion
rega
rdin
g m
udsl
ides
, sup
ply
of s
tatio
nery
item
s, s
ite v
isits
for
wei
gh b
ridg
e st
atio
ns, m
eetin
g on
mar
itim
e sa
fety
in
Tanz
ania
,
348,
000,
000
325,
314,
000
312,
093,
768
Con
stru
ctio
n St
anda
rds
Con
duct
ing
mat
eria
ls te
stin
g,
qual
ity c
ontr
ol, c
ondu
ctin
g ge
otec
hnic
al in
vest
igat
ions
, co
nduc
ting
gend
er a
udits
in
MD
As, c
arry
ing
out e
nvir
onm
enta
l an
d so
cial
impa
ct a
sses
smen
t de
velo
pmen
t pro
ject
s, u
nder
taki
ng
tech
nica
l aud
its o
f on-
goin
g an
d co
mpl
eted
roa
d pr
ojec
ts,
unde
rtak
ing
mat
eria
l tes
ting,
qua
lity
cont
rol a
nd r
esea
rch,
und
erta
king
en
viro
nmen
tal c
ompl
ianc
e au
dits
on
on-
goin
g pr
ojec
ts in
MD
As,
unde
rtak
ing
tech
nica
l aud
its o
f on-
goin
g an
d co
mpl
eted
UN
RA
road
pr
ojec
ts, c
arry
ing
out p
avem
ent
eval
uatio
n, c
arry
ing
out i
nnov
ativ
e re
sear
ch o
n co
nstr
uctio
n m
ater
ials
Col
lect
ing
traf
fic fl
ow p
atte
rns
on l.
Kyo
ga,
mon
itori
ng r
oad
proj
ects
impl
emen
ted
by D
LGs,
jo
ined
up
insp
ectio
ns o
f DLG
s w
ith M
oPS,
sup
ply
of to
ner
cart
ridg
es, p
aym
ent f
or 1
0th J
TSR
, su
pply
of b
atte
ries
, att
endi
ng H
RC
B m
eetin
g in
K
igal
i, tr
avel
to A
rush
a, s
uppl
y , i
nsta
llatio
n an
d co
mm
issi
onin
g of
equ
ipm
ent f
or d
ata
reco
very
ce
ntre
, des
igni
ng a
nd d
evel
opin
g a
web
site
, tr
avel
to c
hina
acc
ompa
nyin
g th
e pr
esid
ent t
o si
gn S
GR
con
trac
t, tr
avel
to K
igal
i, su
pply
of
stat
ione
ry it
ems,
pay
men
t for
air
tick
ets,
sup
ply
of c
onst
ruct
ion
mat
eria
ls fo
r U
RR
Uni
ts, p
rint
ing
and
supp
ly o
f Min
istr
y le
tter
head
s,
1,40
5,61
8,00
01,
066,
593,
000
1,11
5,54
0,86
4
Pub
lic
Stru
ctur
es
Con
solid
ated
allo
wan
ces,
air
tick
ets,
allo
wan
ces
for
polit
ical
ass
ista
nts,
trav
el ti
me
stud
y on
na
tiona
l roa
ds, m
onito
ring
of p
roje
cts,
res
earc
h fu
nd fo
r m
aste
rs s
tude
nts,
pri
ntin
g an
d su
pply
of
Min
istr
y le
tter
head
s, tr
avel
to J
uba
and
Kiig
ali
for
mee
ting
on S
GR
, tui
tion
for
MB
A, s
ervi
cing
of
veh
icle
s
786,
193,
000
704,
922,
000
718,
156,
776
Tota
l5,
119,
691,
000
3,20
5,56
3,00
03,
021,
786,
25
Sour
ce: O
AG A
naly
sis
of b
udge
t and
wor
k pl
ans
T H E R E P U B L I C O F U G A N D A
ROADS
HOSPITALS
1VALUE FOR MONEY AUDIT REPORT ON THE IMPLEMENTATION OF THE EXPRESS PENALTY SCHEME (EPS)
BY UGANDA POLICE FORCE | A REPORT BY THE AUDITOR GENERAL
OFFICE OF THE AUDITOR GENERAL
www.oag.go.ug | E-mail: [email protected]
T H E R E P U B L I C O F U G A N D A
D E C E M B E R , 2 0 1 51VALUE FOR MONEY AUDIT REPORT ON THE IMPLEMENTATION OF THE EXPRESS PENALTY SCHEME (EPS)
BY UGANDA POLICE FORCE | A REPORT BY THE AUDITOR GENERAL
OFFICE OF THE AUDITOR GENERAL
P.O.Box 7083, Kampala,Tel: +256 414 344 340 Fax: +256 414 345 674
E-mail: [email protected]
REG
ULA
TIO
N O
F TH
E C
ON
STR
UC
TIO
N S
ECTO
R B
Y M
INIS
TRY
OF
WO
RK
S A
ND
TR
AN
SPO
RT
A REPORT BY THE AUDITOR GENERAL
REGULATION OF THE CONSTRUCTION SECTOR BY MINISTRY OF WORKS AND TRANSPORT