Office of Highway Safety
Grade Crossing AccidentElmwood Park, IllinoisNovember 23, 2005
Grade Crossing AccidentElmwood Park, IllinoisNovember 23, 2005
![Page 2: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/2.jpg)
Office of Highway Safety
IntroductionIntroduction
David S. Rayburn
![Page 3: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/3.jpg)
Investigative TeamInvestigative Team
• Dan Walsh Highway• Jennifer Morrison Vehicle• Burt Simon Human Performance• Hank Hughes Witnesses• James LeBerte Witnesses• Robert Accetta Forensic Mapping
![Page 4: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/4.jpg)
Investigative TeamInvestigative Team
• Chris Voeglie Electronic Recorders • Richard Hipskind Railroad Track• Jay Kivowitz Railroad Operations• Ruben Payan Railroad Signals• David Rayburn IIC/Highway• Mark Rosenker Member On-Scene
![Page 5: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/5.jpg)
Report Development StaffReport Development Staff
• Avis Clark Audio Visual• Robert Molloy Statistical
Research• Gwynne O’Reagan Editor• Julie Perrot Recommendations• Rafael Marshall Project Manager
![Page 6: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/6.jpg)
Parties To The InvestigationParties To The Investigation
• Illinois Commerce Commission (ICC)• Illinois Department of Transportation
(IDOT)• Village of Elmwood Park• Northern Illinois Regional Commuter Rail
Corporation (METRA)• Federal Railroad Administration (FRA)• Cook County Sheriff’s Office
![Page 7: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/7.jpg)
Safety IssueSafety Issue
Need for a grade separation
![Page 8: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/8.jpg)
Accident SummaryAccident Summary
![Page 9: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/9.jpg)
View of CrossingView of Crossing
![Page 10: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/10.jpg)
75th Avenue
West Grand Avenue
![Page 11: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/11.jpg)
Office of Highway Safety
HighwayHighway
David S. Rayburn
![Page 12: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/12.jpg)
![Page 13: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/13.jpg)
Grade Crossing TrafficGrade Crossing Traffic
• Average daily vehicle traffic: 20,900• Average daily train volume: 107
– 82 commuter trains– 25 freight trains
![Page 14: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/14.jpg)
Crossing FeaturesCrossing Features
Acute angle+ 4 highway lanes+ 3 railroad tracks+ Heavy traffic volume--------------------------------Unique grade crossing
![Page 15: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/15.jpg)
![Page 16: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/16.jpg)
Signals Preempted by Train TrafficSignals Preempted by Train Traffic
![Page 17: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/17.jpg)
Right Turns PrecludedRight Turns Precluded
![Page 18: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/18.jpg)
Desynchronization of Traffic LightsDesynchronization of Traffic Lights
![Page 19: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/19.jpg)
Grade Crossing Accident HistoryGrade Crossing Accident History
• Forty-five accidents since 1956, resulting in 7 fatalities and 27 injuries
• 2004 and 2005 accidents occurred on Thanksgiving Eve
![Page 20: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/20.jpg)
Preaccident Mitigation EffortsPreaccident Mitigation Efforts
• 2002: West Grand Avenue crossing the most hazardous in Illinois
• 2002-2005 IDOT/ICC safety efforts– Fiber optic traffic signal system– Public education– Signal coordination program – Overhead sign renewal and pavement
marking installation– Supplemental warning signs
![Page 21: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/21.jpg)
Postaccident Mitigation EffortsPostaccident Mitigation Efforts
• IDOT, ICC, and Village of Elmwood Park consensus on grade separation
• 2005-2007 IDOT/ICC safety efforts – Track speed reduced to 30 mph– Permanent changeable message warning sign
installed– Traffic signal timing modified– Bus stop east of grade crossing removed
![Page 22: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/22.jpg)
• 2005-2007 IDOT/ICC safety efforts – Operation Lifesaver efforts increased – Low-mount “Do Not Stop on Track” signs
and amber warning flashers installed – Crosshatch pavement markings within
the crossing area installed
Postaccident Mitigation EffortsPostaccident Mitigation Efforts
![Page 23: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/23.jpg)
• Purpose: to identify engineering options for improving grade crossing
• Three options identified– Highway overpass– Highway underpass– Lowered highway and raised rail (preferred
option)
• Next step: engineering and environmental assessment study
Feasibility StudyFeasibility Study
![Page 24: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/24.jpg)
Postaccident Events Postaccident Events
No further accidents since November 2005
![Page 25: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/25.jpg)
Summary of IssuesSummary of Issues
• Heavy train and vehicle traffic• Multiple traffic lanes and tracks• Skewed crossing angle• Grade crossing boundaries hard to judge• Three other crossings within ½ mile • Other three crossings interconnected,
causing congestion on West Grand Ave.• Result: Queuing of traffic onto tracks
![Page 26: Office of Highway Safety Grade Crossing Accident Elmwood Park, Illinois November 23, 2005.](https://reader035.fdocuments.in/reader035/viewer/2022070406/56649e0f5503460f94af93c2/html5/thumbnails/26.jpg)