Office of Coast Survey NRB 2013 Debrief for BOH LT Michael C. Davidson Chief, Navigation Response...
-
Upload
gertrude-flynn -
Category
Documents
-
view
222 -
download
0
Transcript of Office of Coast Survey NRB 2013 Debrief for BOH LT Michael C. Davidson Chief, Navigation Response...
![Page 1: Office of Coast Survey NRB 2013 Debrief for BOH LT Michael C. Davidson Chief, Navigation Response Branch.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfa31a28abf838c96b45/html5/thumbnails/1.jpg)
Office of Coast Survey
Office of Coast SurveyOffice of Coast Survey
NRB 2013 Debrief for BOHLT Michael C. Davidson
Chief, Navigation Response Branch
![Page 2: Office of Coast Survey NRB 2013 Debrief for BOH LT Michael C. Davidson Chief, Navigation Response Branch.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfa31a28abf838c96b45/html5/thumbnails/2.jpg)
Rapid Maritime Response
NRT6
NRT1
NRT2
NRT5
Galveston TX
Panama City FL
Jacksonville FL
USCG RDCNew London CT
NOS Navigation Response Teams
MIST 1 and AUVSilver Spring MD
Bay Hydro IISolomons MD
MIST 2DRC – Mobile AL
NRT4
San Francisco CA
NRT3 – Temporarily offlineNewport OR
![Page 3: Office of Coast Survey NRB 2013 Debrief for BOH LT Michael C. Davidson Chief, Navigation Response Branch.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfa31a28abf838c96b45/html5/thumbnails/3.jpg)
Office of Coast Survey
![Page 4: Office of Coast Survey NRB 2013 Debrief for BOH LT Michael C. Davidson Chief, Navigation Response Branch.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfa31a28abf838c96b45/html5/thumbnails/4.jpg)
Office of Coast Survey
Basic Stats
• Metrics MTS Ports surveyed – 11/13• Survey Project Instructions Issued – 17• Survey Projects Submitted – 12• Response Surveys Conducted – 12• DTONs submitted – 23?• Days of Operations - 268
![Page 5: Office of Coast Survey NRB 2013 Debrief for BOH LT Michael C. Davidson Chief, Navigation Response Branch.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfa31a28abf838c96b45/html5/thumbnails/5.jpg)
Office of Coast Survey
NRT1 – Northern/Eastern GOM Region• J910-NRT1-13 Panama City, FL
– H12357 13 SNM - Completed– H12358 9 SNM – 82%– H12376 3 SNM – 15%
• Decommissioned TSWIG – Recommissioned old NRT4 boat.
• CARIS/HSTP on Edgetech 4125 integration• Received new office trailer• PS Froelich and ERT Mueller visits
![Page 6: Office of Coast Survey NRB 2013 Debrief for BOH LT Michael C. Davidson Chief, Navigation Response Branch.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfa31a28abf838c96b45/html5/thumbnails/6.jpg)
Office of Coast Survey
NRT2 – SE Atlantic Region• S-G902-NRT2-13 St Augustine, FL
– F00629 3 SNM - Submitted
• S-G901-NRT2-13 St Johns River, FL– H12407 3 SNM – Submitted
– H12408 3 SNM – Submitted
• S-H918-NRT2-13 Ft Pierce, FL response– F00634 1 SNM – Submitted
• S-G929-NRT2-13 Mathews Bridge (Jax, FL)– D00188 1 SNM – Submitted
• S-H902-NRT2-14 Miami– F00640 – 1 SNM – Submitted *
• PS Herzog and PS Argento visits
![Page 7: Office of Coast Survey NRB 2013 Debrief for BOH LT Michael C. Davidson Chief, Navigation Response Branch.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfa31a28abf838c96b45/html5/thumbnails/7.jpg)
Office of Coast Survey
NRT3 – Pacific NW Region• Warm lay-up status for 2013 season due to
staffing and budget challenges• Vessel located on MOC-P facility• Office trailer to be relocated to DRC, Mobile, AL.• Vehicles to be dispersed to other NRTs to
replace ageing vehicles (F350 will stay w/ boat)• May staff up as early as Q4 2014, but FY15
more likely
![Page 8: Office of Coast Survey NRB 2013 Debrief for BOH LT Michael C. Davidson Chief, Navigation Response Branch.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfa31a28abf838c96b45/html5/thumbnails/8.jpg)
Office of Coast Survey
NRT4 – Great Lakes/Western Gulf• K414-NRT4-13 – Galveston Bay, TX
– H12388 10 SNM – Complete– H12391 2 SNM – Complete
• Responded to Sunken Barge, MS River over 4th of July Weekend
• Integrated POS/MV Ver5
• 2 Personnel new to the team in 2013
![Page 9: Office of Coast Survey NRB 2013 Debrief for BOH LT Michael C. Davidson Chief, Navigation Response Branch.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfa31a28abf838c96b45/html5/thumbnails/9.jpg)
Office of Coast Survey
NRT5 – NE Region (USCG RDC- New London CT)• S-B903-NRT5-13 – New London CT
– D00177 1 SNM - Completed
• S-B906-NRT5-13 – Liberty/Ellis Islands– F00630 1 SNM - Submitted
• S-B917-NRT5-13 – Sandy Hook/USCG ANT NY– D00178 1 SNM – Complete– D00179 1 SNM – Complete– D00180 1 SNM – Complete– D00181 1 SNM - Complete
• B370-NRT5-13 – E Long Island Sound– H12508 8 SNM – Complete
• F00598, F00619, F00620, F00623 prior backlog nearing completion
![Page 10: Office of Coast Survey NRB 2013 Debrief for BOH LT Michael C. Davidson Chief, Navigation Response Branch.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfa31a28abf838c96b45/html5/thumbnails/10.jpg)
Office of Coast Survey
NRT6• L430-NRT6-13 San Francisco
– H12227 12 SNM – 15%
• S-L919-NRT6-13 Fernstream– D00182 1SNM - Submitted
• S-L922-NRT6-13 San Francisco Anchorage 9– D00183 1 SNM - Submitted
• S-L926-NRT6-13 Mare Island, San Fran – D00186 1SNM - Submitted
• S-L927-NRT6-13 San Fran Pier 1– F00635 1 SNM – Submitted
• S-L925_NRT6-14 Carquinez Strait– Recon led to a LNM broadcast and subsequent full survey request
• MBES TPU failed – using NRT3’s
![Page 11: Office of Coast Survey NRB 2013 Debrief for BOH LT Michael C. Davidson Chief, Navigation Response Branch.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfa31a28abf838c96b45/html5/thumbnails/11.jpg)
Office of Coast Survey
R/V Bay Hydro II• E349-BH2-13 Central Chesapeake Bay
– H12305 19 SNM – squared off at about 40%
• E924-BH2-13 Southern Chesapeake Bay– D00187 11 SNM – Complete
– BathyRadar ground truth survey and CBBT tunnel inspection
• Kongsberg EM2040 Integration and Testing
• Novatel GPS testing
• MAST
• Other HSTP related testing
• PS Powdrell visit
![Page 12: Office of Coast Survey NRB 2013 Debrief for BOH LT Michael C. Davidson Chief, Navigation Response Branch.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfa31a28abf838c96b45/html5/thumbnails/12.jpg)
Office of Coast Survey
ERT Contractor
Current vacancies awaiting OCS realignment
ZT-4 will convert to ZP-3 when ZT-4 retires
Hiring Cert received - positions not affected by OCS realignment
NRB Staffing Plan
![Page 13: Office of Coast Survey NRB 2013 Debrief for BOH LT Michael C. Davidson Chief, Navigation Response Branch.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfa31a28abf838c96b45/html5/thumbnails/13.jpg)
Office of Coast Survey
NRB Vessel Recapitalization Plan
• USCG 25’ RB-S #25426 from GSAXcess
• Contract with CDI Marine for engineering support and modification design
• $500K for new vessel construction – April 4 procurement deadline– Market research and SOW ongoing– Committed to 1 new vessel in FY 14 (Goal = 2)
![Page 14: Office of Coast Survey NRB 2013 Debrief for BOH LT Michael C. Davidson Chief, Navigation Response Branch.](https://reader036.fdocuments.in/reader036/viewer/2022062322/5697bfa31a28abf838c96b45/html5/thumbnails/14.jpg)
Office of Coast Survey
NRT Mobile Asset Status Tracker• Utilizing 4G LTE wireless broadband
• Desired sensor data tx ashore in real-time
• ESRI GeoEvent Processor– Automate metrics tracking (geofencing)
– Dynamic floatplan with automated alerts
– Common Operating Picture through ESRI Dashboard
• Capability for Raw survey data transmit ashore for Near-time processing