ODU SAE FORMULA MAE 435. Team Members Advisors Dr. Bawab Prof. Luetke Team Leader Ryan Atkinson...

10
ODU SAE FORMULA MAE 435

description

Overview Schedule Frame Analysis Attenuator Carbon Fiber A- Arms Conclusion

Transcript of ODU SAE FORMULA MAE 435. Team Members Advisors Dr. Bawab Prof. Luetke Team Leader Ryan Atkinson...

Page 1: ODU SAE FORMULA MAE 435. Team Members Advisors Dr. Bawab Prof. Luetke Team Leader Ryan Atkinson Frame Analysis Davis Moore Punit Dave Attenuator Shauna.

ODU SAE FORMULAMAE 435

Page 2: ODU SAE FORMULA MAE 435. Team Members Advisors Dr. Bawab Prof. Luetke Team Leader Ryan Atkinson Frame Analysis Davis Moore Punit Dave Attenuator Shauna.

Team Members

•Advisors•Dr. Bawab•Prof. Luetke

•Team Leader•Ryan Atkinson

•Frame Analysis•Davis Moore•Punit Dave

•Attenuator•Shauna Richards

•Carbon Fiber A-arms•Dan Gregor•Aaron Vandegraff

Page 3: ODU SAE FORMULA MAE 435. Team Members Advisors Dr. Bawab Prof. Luetke Team Leader Ryan Atkinson Frame Analysis Davis Moore Punit Dave Attenuator Shauna.

Overview•Schedule•Frame Analysis•Attenuator•Carbon Fiber A-Arms

•Conclusion

Page 4: ODU SAE FORMULA MAE 435. Team Members Advisors Dr. Bawab Prof. Luetke Team Leader Ryan Atkinson Frame Analysis Davis Moore Punit Dave Attenuator Shauna.

Schedule

Page 5: ODU SAE FORMULA MAE 435. Team Members Advisors Dr. Bawab Prof. Luetke Team Leader Ryan Atkinson Frame Analysis Davis Moore Punit Dave Attenuator Shauna.

Frame•Computer Analysis Complete!

•Actual Testing of Main Hoop

•Hard Test starts Nov. 19th using strain gauges

• Horizontal bending• Longitudinal Torsion

Page 6: ODU SAE FORMULA MAE 435. Team Members Advisors Dr. Bawab Prof. Luetke Team Leader Ryan Atkinson Frame Analysis Davis Moore Punit Dave Attenuator Shauna.

Frame continued•Quality Assurance• 2 of 4 QA tests complete• Weld Quality, (in progress)

• 37 of 42 test sites completed• 8 unsat, (Being Fixed)• QA still in progress• Welding finished soon

• Wall Thickness (Pending)•Alternative Frame Rules, (50% done)• Proposed Method based on Hard

analysis results.

Page 7: ODU SAE FORMULA MAE 435. Team Members Advisors Dr. Bawab Prof. Luetke Team Leader Ryan Atkinson Frame Analysis Davis Moore Punit Dave Attenuator Shauna.

Attenuator •Materials Difficulty

•Estimated ship time 2 days•Changed to 2 weeks!

•New Material •Galvanized Steel •25 mm thickness, 1” cell size

•Current Status•Fabrication completed! •Soft Testing calculations altered•Hard Testing moved to next week

Page 8: ODU SAE FORMULA MAE 435. Team Members Advisors Dr. Bawab Prof. Luetke Team Leader Ryan Atkinson Frame Analysis Davis Moore Punit Dave Attenuator Shauna.

Carbon Fiber A-arms• Actual testing of assembly, Nov. 9th

• Verify will meet track conditions

• Destructive testing required for 1000 lbs

• Going to complete testing and fully analyze, SF=1.2

Page 9: ODU SAE FORMULA MAE 435. Team Members Advisors Dr. Bawab Prof. Luetke Team Leader Ryan Atkinson Frame Analysis Davis Moore Punit Dave Attenuator Shauna.

Conclusion

•Frame Weight test Nov 19th

•Attenuator Drop test next week

•A-Arms Pull tests Nov. 9th

•Complete the paper!

Page 10: ODU SAE FORMULA MAE 435. Team Members Advisors Dr. Bawab Prof. Luetke Team Leader Ryan Atkinson Frame Analysis Davis Moore Punit Dave Attenuator Shauna.

Questions?