October 25-27, 2016 | Booth #201 - Oilfield Services | … 25-27, 2016 | Booth #201 The Woodlands...

4
| bakerhughes.com/alce October 25-27, 2016 | Booth #201 The Woodlands Waterway Marriott Exhibit Hall SPE Artificial Lift Conference and Exhibition

Transcript of October 25-27, 2016 | Booth #201 - Oilfield Services | … 25-27, 2016 | Booth #201 The Woodlands...

Page 1: October 25-27, 2016 | Booth #201 - Oilfield Services | … 25-27, 2016 | Booth #201 The Woodlands Waterway Marriott Exhibit Hall SPEArtifi cial Lift Conference and Exhibition *Current

© 2016 Baker Hughes Incorporated. All rights reserved. 45147 10/2016

Disclaimer of Liability: This information is provided for general information purposes only and is believed to be accurate as of the date hereof; however, Baker Hughes Incorporated and its affi liates do not make any warranties or representations of any kind regarding the information and disclaim all express and implied warranties or representations to the fullest extent permissible by law, including those of merchantability, fi tness for a particular purpose or use, title, non-infringement, accuracy, correctness or completeness of the information provided herein. All information is furnished “as is” and without any license to distribute. The user agrees to assume all liabilities related to the use of or reliance on such information. BAKER HUGHES INCORPORATED AND ITS AFFILIATES SHALL NOT BE LIABLE FOR ANY DIRECT, INDIRECT, SPECIAL, PUNITIVE, EXEMPLARY OR CONSEQUENTIAL DAMAGES FROM ANY CAUSE WHATSOEVER INCLUDING BUT NOT LIMITED TO ITS NEGLIGENCE.

bakerhughes.com/alce

| bakerhughes.com/a lce

October 25-27, 2016 | Booth #201The Woodlands Waterway Marriott Exhibit Hall

SPE Artifi cial Lift Conference and Exhibition

Page 2: October 25-27, 2016 | Booth #201 - Oilfield Services | … 25-27, 2016 | Booth #201 The Woodlands Waterway Marriott Exhibit Hall SPEArtifi cial Lift Conference and Exhibition *Current

*Current as of September 28, 2016

Technical Papers*Tuesday, October 25

Wednesday, October 26

Thursday, October 27

Time Paper Number/Title Authors

Electric Submersible Pumps I: ESP Production in Tough Places

2:30 181232 - Enhance Production in Tight-Casing with ESP in Artificial Sump

J. Bridges, M.A. Sikes, J. Kirk, Baker Hughes; D. Savela, Apache Corporation

3:00 181225 - Production Optimization in Highly Deviated Unconventional Wells

J. Bridges, M. Fougerdi, Baker Hughes; E. Clour, E. Sappington, Midstates Petroleum

Time Paper Number/Title Authors

Electric Submersible Pumps II: Novel Approaches to ESP Challenges

4:00 181221 - CFD and FEA-Based, 3D Metal Printing Hybrid Stage Prototype on Electric Submersible Pump (ESP) System for High-Gas Wells

Z. Ye, R. Rutter, E. Marsis

5:00 181222 - Probabilistic Production Data Analysis Applied to ESP Selection

A.H. Cardona, J. Knight, B. Kadio-Morokro

Time Paper Number/Title Authors

New Technology

2:30 181239 - Fiber-Optic Monitoring in Electrical Submersible Pump System

D.B. Cooper, R. Rutter, M. Forsberg

Baker Hughes Booth

1. TransCoil™ Rigless-Deployed ESP System 2. AMBIT™ ESP Monitoring Services3. CENesis Curve™ Tight-Radius ESP System

and CENesis PHASE™ Multiphase Encapsulated Production Solution

4. CENtrilift PASS™ Slimline ESP System5. Measuring-While-Installing Testing Unit

and WellLift™ N ESP Monitoring System6. SureSENS™ SPTV Monitoring Gauge System 7. FLEXPump™ Series Pumps8. HPump™ Surface Pumping System 9. Baker Hughes Progressing Cavity Pumping Systems

10. ShopBakerHughes.com/ArtificialLift

Reception

1

2

3

4

5 67

9

10

8

Page 3: October 25-27, 2016 | Booth #201 - Oilfield Services | … 25-27, 2016 | Booth #201 The Woodlands Waterway Marriott Exhibit Hall SPEArtifi cial Lift Conference and Exhibition *Current

*Current as of September 28, 2016

Technical Papers*Tuesday, October 25

Wednesday, October 26

Thursday, October 27

Time Paper Number/Title Authors

Electric Submersible Pumps I: ESP Production in Tough Places

2:30 181232 - Enhance Production in Tight-Casing with ESP in Artificial Sump

J. Bridges, M.A. Sikes, J. Kirk, Baker Hughes; D. Savela, Apache Corporation

3:00 181225 - Production Optimization in Highly Deviated Unconventional Wells

J. Bridges, M. Fougerdi, Baker Hughes; E. Clour, E. Sappington, Midstates Petroleum

Time Paper Number/Title Authors

Electric Submersible Pumps II: Novel Approaches to ESP Challenges

4:00 181221 - CFD and FEA-Based, 3D Metal Printing Hybrid Stage Prototype on Electric Submersible Pump (ESP) System for High-Gas Wells

Z. Ye, R. Rutter, E. Marsis

5:00 181222 - Probabilistic Production Data Analysis Applied to ESP Selection

A.H. Cardona, J. Knight, B. Kadio-Morokro

Time Paper Number/Title Authors

New Technology

2:30 181239 - Fiber-Optic Monitoring in Electrical Submersible Pump System

D.B. Cooper, R. Rutter, M. Forsberg

Baker Hughes Booth

1. TransCoil™ Rigless-Deployed ESP System 2. AMBIT™ ESP Monitoring Services3. CENesis Curve™ Tight-Radius ESP System

and CENesis PHASE™ Multiphase Encapsulated Production Solution

4. CENtrilift PASS™ Slimline ESP System5. Measuring-While-Installing Testing Unit

and WellLift™ N ESP Monitoring System6. SureSENS™ SPTV Monitoring Gauge System 7. FLEXPump™ Series Pumps8. HPump™ Surface Pumping System 9. Baker Hughes Progressing Cavity Pumping Systems

10. ShopBakerHughes.com/ArtificialLift

Reception

1

2

3

4

5 67

9

10

8

Page 4: October 25-27, 2016 | Booth #201 - Oilfield Services | … 25-27, 2016 | Booth #201 The Woodlands Waterway Marriott Exhibit Hall SPEArtifi cial Lift Conference and Exhibition *Current

© 2016 Baker Hughes Incorporated. All rights reserved. 45147 10/2016

Disclaimer of Liability: This information is provided for general information purposes only and is believed to be accurate as of the date hereof; however, Baker Hughes Incorporated and its affiliates do not make any warranties or representations of any kind regarding the information and disclaim all express and implied warranties or representations to the fullest extent permissible by law, including those of merchantability, fitness for a particular purpose or use, title, non-infringement, accuracy, correctness or completeness of the information provided herein. All information is furnished “as is” and without any license to distribute. The user agrees to assume all liabilities related to the use of or reliance on such information. BAKER HUGHES INCORPORATED AND ITS AFFILIATES SHALL NOT BE LIABLE FOR ANY DIRECT, INDIRECT, SPECIAL, PUNITIVE, EXEMPLARY OR CONSEQUENTIAL DAMAGES FROM ANY CAUSE WHATSOEVER INCLUDING BUT NOT LIMITED TO ITS NEGLIGENCE.

bakerhughes.com/alce

| bakerhughes.com/a lce

October 25-26, 2016 | Booth #201 The Woodlands Waterway Marriott Exhibit Hall

SPE Artificial Lift Conference and Exhibition