DOE APPLIANCES & COMMERCIAL EQUIPMENT STANDARDS PROGRAM – RULEMAKING ACTIVITIES (Note: Products appear more than once in this table because all required rulemaking cycles are reflected.)
STANDARDS AND DETERMINATION NOTICES
ScheduleSetting Product Category Product Rulemaking Cycle and Deadline Data Sheet SubGroup Page
References Standards prescribed by EPACT 2005
HVAC Products Package AirConditioning and Heating Equipment, Small (Commercial)
Due 1/1/2010 (manuf. date) 55
Package AirConditioning and Heating Due 1/1/2010 (manuf. date) 55 Equipment, Large (Commercial) Package AirConditioning and Heating Due 1/1/2010 (manuf. date) 55 Equipment, Very Large (240 760 kBtu/hr) (Commercial) Unit Heaters (Commercial) Design standard due 8/8/2008 74
(manuf. date) Refrigeration Products
Automatic Ice Makers (Commercial) Due 1/1/2010 (manuf. date) 2
SelfContained Commercial Due 1/1/2010 (manuf. date) 68 Refrigerators, Freezers, and RefrigeratorFreezers with Doors for Holding Temperature Applications SelfContained Commercial Due 1/1/2010 (manuf. date) 62 Refrigerators with Doors for PullDown Temperature Applications
Lighting and Ceiling Fans Design standard due 1/1/2007 5 Electrical Products (manuf. date)
Ceiling Fan Light Kits Due 1/1/2007 (manuf. date) 5
Compact Fluorescent Lamps, Medium Design standard due 1/1/2006 * Base (manuf. date) Distribution Transformers, LowVoltage Due 1/1/2007 (manuf. date) 26 DryType Fluorescent Lamp Ballasts Due 7/1/2009 (manuf. date) 36
1 of 14
October 21, 2005 draft_v2
STANDARDS AND DETERMINATION NOTICES
ScheduleSetting Product Category Product Rulemaking Cycle and Deadline Data Sheet SubGroup Page
References Standards prescribed by EPACT 2005
Lighting and Electrical Products
Illuminated Exit Signs Due 1/1/2006 (manuf. date) 48
Mercury Vapor Lamp Ballasts Product ban due 1/1/2008 (manuf. * date)
Torchieres Due 1/1/2006 (manuf. date) 71
Traffic Signal Modules and Pedestrian Due 1/1/2006 (manuf. date) 73 Modules
WaterRelated Products
Clothes Washers (Commercial) Due 1/1/2007 (manuf. date) 16
Prerinse Spray Valves (Commercial) Due 1/1/2006 (manuf. date) *
Miscellaneous Dehumidifiers (Residential) Due 10/1/2007 (manuf. date) 21 Consumer Appliances
EPACT 2005 Requires Refrigeration Automatic Ice Makers (Commercial) Rulemaking to determine possible 2 DOE to Do Standards Products 1st amendment due 1/1/2015 Rulemaking
Automatic Ice Makers (Commercial) Rulemaking to determine possible 2 2nd amendment due 5 yrs after 1st amendment takes effect
IceCream Freezers; SelfContained Due 1/1/2009 45 Commercial Refrigerators, Freezers, and RefrigeratorFreezers without Doors; and RemoteCondensing Commercial Refrigerators, Freezers and RefrigeratorFreezers Refrigerated Bottle or Canned Due 8/8/2009 62 Beverage Vending Machines
2 of 14
October 21, 2005 draft_v2
STANDARDS AND DETERMINATION NOTICES
ScheduleSetting Product Category Product Rulemaking Cycle and Deadline Data Sheet SubGroup Page
References EPACT 2005 Requires Refrigeration (All Commercial) Refrigeration Products Rulemaking to determine possible 45, 68 DOE to Do Standards Products in EPACT 2005 (icecream freezers, 1st amendment due 1/1/2013 Rulemaking selfcontained without doors, remote
condensing, other not vending machines, not icemakers) (All Commercial) Refrigeration Products Rulemaking to determine possible 45, 68 in EPACT 2005 (icecream freezers, 2nd amendment due 3 yrs after selfcontained without doors, remote determination or effective date of condensing, other not vending amended standard machines, not icemakers)
Lighting and Battery Chargers and External Power Determination notice due 8/8/2008 3 Electrical Products Supplies (Determination Notice)
Ceiling Fan Light Kits Optional requirements for ceiling 5 fan light kits other than those with prescribed standards; Requirements due 1/1/2007 (1/1/2009 manufacture date. If DOE does not issue final rule by 1/1/2007, Congress specifies standard)
WaterRelated Clothes Washers (Commercial) Rulemaking to determine possible 16 Products 1st amendment due 1/1/2010
Clothes Washers (Commercial) Rulemaking to determine possible 16 2nd amendment due 1/1/2015
Miscellaneous Dehumidifiers (Residential) Rulemaking to determine possible 21 Consumer amendment due 10/1/2009. EPACT Appliances 2005 specifies standard if no
amendment effective by 2012.
3 of 14
October 21, 2005 draft_v2
STANDARDS AND DETERMINATION NOTICES
ScheduleSetting Product Category Product Rulemaking Cycle and Deadline Data Sheet SubGroup Page
References EPACT 2005 Standards HVAC Products Furnace Fans Authority to incorporate furnace 39 with No Deadline fans into existing rulemaking or
have separate rulemaking Combination Appliances (Residential) Authority to set >1 standard for 17
products with >1 major function
Refrigeration Automatic Ice Makers, Other Types Optional standard with no deadline 2 Products (Commercial)
Automatic Ice Makers, Other Types Rulemaking to determine possible 2 (Commercial) 1st amendment due 5 yrs after
optional initial rulemaking takes effect
Automatic Ice Makers, Other Types Rulemaking to determine possible 2 (Commercial) 2nd amendment due 5 yrs after 1st
amendment takes effect Commercial Refrigerators, Freezers, Optional standard with no deadline ** and RefrigeratorFreezers, Other Types
Lighting and Battery Chargers and External Power DOE will develop if determination 3 Electrical Products Supplies notice is positive, which is due
8/8/2008. No deadline is required for the final standard.
Ceiling Fans (other than design Optional standard with no deadline 5 standard)
Ceiling Fan Light Kits Amendment possible after 1/1/2010 5
Backlog HVAC Products Air Conditioners and Heat Pumps less than 65 kBtu/hr, 3Phase (Commercial)
Revision; DOE must revise after ASHRAE revises Standard 90.1,
1
which happened in 10/1999. No specific legal deadline
4 of 14
October 21, 2005 draft_v2
STANDARDS AND DETERMINATION NOTICES
ScheduleSetting Product Category Product Rulemaking Cycle and Deadline Data Sheet SubGroup Page
References Backlog HVAC Products Central Air Conditioners and Heat Rulemaking to determine possible 9
Pumps (Residential) amendment; 2nd standard revision due 1/1/2001
Direct Heating Equipment Rulemaking to determine possible 22 1st amendment due 1/1/1992
Direct Heating Equipment Rulemaking to determine possible 22 2nd amendment due 1/1/2000
Furnaces and Boilers (Residential) Rulemaking to determine possible 38 1st amendment due 1/1/1994 (Revision of small furnaces due 1/1994; 1st revision of mobile home furnaces due 1/1992)
Oil and GasFired Packaged Boilers Revision; DOE must revise after 53 (Commercial) ASHRAE revises Standard 90.1,
which happened in 10/1999. No specific legal deadline
Packaged Terminal Air Conditioners Revision; DOE must revise after 57 and Heat Pumps (Commercial) ASHRAE revises Standard 90.1,
which happened in 10/1999. No specific legal deadline
Pool Heaters Rulemaking to determine possible 58 1st amendment due 1/1/1992
Pool Heaters Rulemaking to determine possible 58 2nd amendment due 1/1/2000
Room Air Conditioners Rulemaking to determine possible 66 amendment; 2nd update due 9/24/2002
5 of 14
October 21, 2005 draft_v2
STANDARDS AND DETERMINATION NOTICES
ScheduleSetting Product Category Product Rulemaking Cycle and Deadline Data Sheet SubGroup Page
References Backlog HVAC Products Tankless GasFired Instantaneous
Water Heaters Revision; DOE must revise after ASHRAE revises Standard 90.1,
70
which happened in 10/1999. No specific legal deadline
Water Heaters (Residential) Rulemaking to determine possible 78 amendment; 2nd update due 1/1/2000
Lighting and Distribution Transformers, MV Dry Rulemaking due 18 months after 26 Electrical Products Type and LiquidImmersed test procedure final rule, which was
due 4/24/1995, but is not final Electric Motors, 1200 HP Rulemaking to determine possible 28
1st amendment due 10/24/1999 or 10/24/2001 depending on motor
Electric Motors, Small Determination notice due 4/24/1995 30 (Determination Notice)
Fluorescent Lamps Rulemaking to determine possible 34 1st amendment due 4/1997
Fluorescent Lamps Rulemaking to determine possible 34 2nd amendment due 4/1/2002
Fluorescent Lamp Ballasts Rulemaking to determine possible 36 2nd amendment due 5 yrs from previous rule, effectively 9/2005
HighIntensity Discharge Lamps Determination notice due 4/24/1995 43 (Determination Notice)
Incandescent General Service Lamps Due 3.5 years after FTC rule 49 issued, implying 11/1997.
Incandescent General Service Lamps Rulemaking to determine possible 49 1st amendment due 4/1/2002
6 of 14
October 21, 2005 draft_v2
STANDARDS AND DETERMINATION NOTICES
ScheduleSetting Product Category Product Rulemaking Cycle and Deadline Data Sheet SubGroup Page
References Backlog Lighting and
Electrical Products Incandescent Reflector Lamps Rulemaking to determine possible
1st amendment due 4/1997 51
Incandescent Reflector Lamps Rulemaking to determine possible 51 2nd amendment due 4/1/2002
WaterRelated Dishwashers (Residential) Due 5 yrs after previous final rule, 24 Products implying 5/1996 due date
Miscellaneous Clothes Dryers (Residential) Due 5 yrs after previous final rule, 12 Consumer implying 5/1996 due date Appliances
Ranges and Ovens and Microwave Rulemaking to determine possible 60 Ovens (Electric and Gas) 1st amendment due 1/1/1992. Gas
cooking products not addressed in final rule completed 9/1998.
Ranges and Ovens and Microwave Rulemaking to determine possible 60 Ovens (Electric and Gas) 2nd amendment due 1/1/1997
Other HVAC Products Furnaces and Boilers (Residential) Rulemaking to determine possible 2nd amendment due 1/1/2007 (2nd revision of mobile home furnaces
38
due 1/1994) Furnaces, Warm Air (Commercial) Revision; DOE must revise after 41
ASHRAE revises Standard 90.1. No specific legal deadline
Single Package Vertical AirConditioners and Heat Pumps
DOE plans to carve out a separate standard and test procedures for this product; DOE must revise after ASHRAE revises Standard 90.1,
69
which happened in 10/1999. No specific legal deadline
7 of 14
October 21, 2005 draft_v2
STANDARDS AND DETERMINATION NOTICES
ScheduleSetting Product Category Product Rulemaking Cycle and Deadline Data Sheet SubGroup Page
References Other HVAC Products WaterCooled Air Conditioners and Revision; DOE must revise after 75
WaterSource Heat Pumps ASHRAE revises Standard 90.1 (Commercial) again. No specific legal deadline Water Heaters (Commercial) Revision; DOE must revise after 76
ASHRAE revises Standard 90.1. No specific legal deadline
Lighting and Electric Motors, 1200 HP Rulemaking to determine possible 28 Electrical Products 2nd amendment, due 2 yrs after 1st
amendment takes effect. Electric Motors, Small Rulemaking due 18 months after
test procedure final rule, which was 30
due 4/24/1995, only if determination is positive.
HighIntensity Discharge Lamps Rulemaking due 18 months after test procedure final rule, which was due 4/24/1995, only if determination is positive.
43
WaterRelated Faucets, Showerheads, Urinals and Revision; Due 12 months after 32 Products Toilets ANSI/ASME amends standards, or,
if after 5 years of no ANSI/ASME action, DOE should waive state preemption authority in states where state regulations are more strict.
* Data sheet not available. Standard (or ban in the case of mercury vapor lamp ballasts) prescribed by EPACT 2005. ** Data sheet not available. Rulemaking for “other types” of commercial refrigeration products is optional per EPACT 2005.
8 of 14
(blank)
(blank)
(blank)
(blank)
(blank)
October 21, 2005 draft_v2
TEST PROCEDURES
ScheduleSetting Product Category Product Rulemaking Cycle and Deadline Data Sheet SubGroup Page
References Test Procedures Prescribed HVAC Products Package AirConditioning and 56 by EPACT 2005 Heating Equipment, Small
(Commercial) Package AirConditioning and 56 Heating Equipment, Large (Commercial) Package AirConditioning and 56 Heating Equipment (240 760 kBtu/hr), Very Large (Commercial)
Refrigeration Products Automatic Ice Makers (Commercial) 2
Commercial Refrigerators, Freezers, 68 and RefrigeratorFreezers with Doors covered by CEC in Feb. 2002 Commercial Refrigerators, Freezers, Revision; If ASHRAE 117 is updated 68 and RefrigeratorFreezers or ANSI adopts something other than
117, DOE must review and amend test procedure within 180 days.
Refrigerated Bottle or Canned Due 8/8/2007 62 Beverage Vending Machines
SelfContained Commercial 62 Refrigerators with Doors for PullDown Temperature Applications SelfContained Commercial 68 Refrigerators, Freezers, and RefrigeratorFreezers with Doors
Lighting and Electrical Ceiling Fans 5 Products
Ceiling Fan Light Kits 5
9 of 14
(blank)
(blank)
(blank)
(blank)
(blank)
(blank)
October 21, 2005 draft_v2
TEST PROCEDURES
ScheduleSetting Product Category Product Rulemaking Cycle and Deadline Data Sheet SubGroup Page
References Test Procedures Prescribed Lighting and Electrical Compact Fluorescent Lamps, *** by EPACT 2005 Products Medium Base
Distribution Transformers, Low 27 Voltage DryType Illuminated Exit Signs 48
Traffic Signal Modules and 73 Pedestrian Modules
WaterRelated Products Clothes Washers (Commercial) 16
Prerinse Spray Valves (Commercial) *** Miscellaneous Consumer Dehumidifiers (Residential) 21 Appliances
EPACT 2005 Requires DOE Refrigeration Products IceCream Freezers; SelfContained Standard due 1/1/2009 (effective 45 to Develop Test Procedure Commercial Refrigerators, Freezers, 1/1/2012), no legal deadline
and RefrigeratorFreezers without Doors; and RemoteCondensing Commercial Refrigerators, Freezers and RefrigeratorFreezers Commercial Refrigerators, Freezers, Optional standard with no deadline ** and RefrigeratorFreezers, Other Types
Lighting and Electrical Battery Chargers / External Power Due 2/8/2007 4 Products Supplies
Torchieres Not explicitly required by EPACT 72 2005. Standard effective 1/1/2006.
10 of 14
October 21, 2005 draft_v2
TEST PROCEDURES
ScheduleSetting Product Category Product Rulemaking Cycle and Deadline Data Sheet SubGroup Page
References Backlog Lighting and Electrical Distribution Transformers, MV Dry Necessary before standards NOPR; 27
Products Type and LiquidImmersed Technically due 4/24/1995
Electric Motors, Small Necessary before standards NOPR if 31 positive determination; Technically due 4/24/1995
HighIntensity Discharge Lamps Necessary before standards NOPR if 44 positive determination; Technically due 4/24/1995
Other HVAC Products Air Conditioners and Heat Pump less Revision; DOE must issue ruling if 1, 56 than 65 kBtu/hr, 3phase industry test procedures change. No (Commercial) specific legal deadline. Central Air Conditioners and Heat No deadline 10 Pumps (Residential)
Combination Appliances (Residential) No deadline 20
Direct Heating Equipment 23
Furnaces and Boilers (Residential) 38
Furnaces, Warm Air (Commercial) Revision; DOE must issue ruling if 42 industry test procedures change. No specific legal deadline.
Oil and GasFired Packaged Boilers Revision; DOE must issue ruling if 54 (Commercial) industry test procedures change. No
specific legal deadline. Packaged Terminal Air Conditioners Revision; DOE must issue ruling if # and Heat Pumps (Commercial) industry test procedures change. No
specific legal deadline.
11 of 14
October 21, 2005 draft_v2
TEST PROCEDURES
ScheduleSetting Product Category Product Rulemaking Cycle and Deadline Data Sheet SubGroup Page
References Other HVAC Products Pool Heaters 59
Room Air Conditioners 67
Single Package Vertical AirConditioners and Heat Pumps
DOE plans to carve out separate test procedure for this product; DOE must revise after ASHRAE revises
56, 69
Standard 90.1, which happened in 10/1999. No specific legal deadline
Tankless GasFired Instantaneous Revision; DOE must issue ruling if # Water Heaters industry test procedures change. No
specific legal deadline.
WaterCooled Air Conditioners and Revision; DOE must issue ruling if 56 WaterSource Heat Pumps industry test procedures change. No (Commercial) specific legal deadline. Water Heaters (Commercial) Revision; DOE must issue ruling if 77
industry test procedures change. No specific legal deadline.
Water Heaters (Residential) 79
Refrigeration Products Compact Refrigerators and RefrigeratorFreezers (Residential)
No deadline 65
Refrigerators, RefrigeratorFreezers, 65 & Freezers (Residential)
Lighting and Electrical Electric Motors, 1200 HP 29 Products
Fluorescent Lamps 35
12 of 14
October 21, 2005 draft_v2
TEST PROCEDURES
ScheduleSetting SubGroup
Product Category Product Rulemaking Cycle and Deadline Data Sheet Page References
Other Lighting and Electrical Products
Fluorescent Lamp Ballasts 37
Incandescent General Service Lamps 50
Incandescent Reflector Lamps 52
WaterRelated Products Clothes Washers (Residential) Test cloth issue 15
Dishwashers (Residential) 25
Faucets, Showerheads, Urinals and Toilets
33
Miscellaneous Consumer Appliances
Clothes Dryers (Residential) 13
Ranges and Ovens and Microwave Ovens (Electric and Gas)
61
** Data sheet not available. Rulemaking for “other types” of commercial refrigeration products is optional per EPACT 2005.*** Data sheet not available. Test procedure prescribed by EPACT 2005.# Data sheet not available. No test procedure change needed unless industry test procedure changes.
13 of 14
October 21, 2005 draft_v2
COVERAGE
Products Notes Data Sheet Page References
Certain Incandescent Coverage not required Reflector Lamps (ER/BR) 11
PETITIONS Product Notes Data Sheet Page
References
Clothes Washers Standard COMPLETED; (Residential) State of California petitioning 14
for exemption
Refrigerators, RefrigeratorFreezers, & Freezers 64 (Residential)
ADDITIONAL NOTE DOE is also initiating an Anticircumvention Rulemaking