Iowa DOT Digital Plan DeliverablesThomas HamskiAutomation EngineerOffice of Design
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
1
Outline
• Current electronic deliverables• QC/QA process• Where we are going in the future• Engineer seal on electronic plan
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
2
CURRENT DIGITAL DELIVERABLES Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
3
Current Digital Deliverables
• 3D model byproduct of design workflow.• 3D design is as complete as possible.• Surfaces are provided in generic format (LandXML).• Files supplied pre-letting online.• DOT Field personnel use the same files from website.• Files required to be submitted outlined in Design Manual
(20B-71).
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
4
Current Digital Deliverables
• 3D model byproduct of design workflow.• 3D design is as complete as possible.• Surfaces are provided in generic format (LandXML).• Files supplied pre-letting online.• DOT Field personnel use the same files from website.• Files required to be submitted outlined in Design Manual
(20B-71).
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
5
Complete Models
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
6
Current Digital Deliverables
• 3D model byproduct of design workflow.• 3D design is as complete as possible.• Surfaces are provided in generic format (LandXML).• Files supplied pre-letting online.• DOT Field personnel use the same files from website..• Files required to be submitted outlined in Design Manual
(20B-71).
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
7
Current Digital Deliverables
• 3D model byproduct of design workflow.• 3D design is as complete as possible.• Surfaces are provided in generic format (LandXML).• Files supplied pre-letting online.• DOT Field personnel use the same files from website.• Files required to be submitted outlined in Design Manual
(20B-71).
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
8
http://www.iowadot.gov/contracts/lettings.html
Current Digital Deliverables
• 3D model byproduct of design workflow.• 3D design is as complete as possible.• Surfaces are provided in generic format (LandXML).• Files supplied pre-letting online.• DOT Field personnel use the same files from website.• Files required to be submitted outlined in Design Manual
(20B-71).
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
9
Current Digital Deliverables
• 3D model byproduct of design workflow.• 3D design is as complete as possible.• Surfaces are provided in generic format (LandXML).• Files supplied pre-letting online.• DOT Field personnel use the same files from website.• Files required to be submitted outlined in Design Manual
(20B-71).
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
10
http://www.iowadot.gov/design/dmanual/20B-71.pdf
Current deliverable continued
• 3D breaklines in .dgn & .dxf formats.• Intuitive level names for 3D break lines.• File naming & contents standardized by Design Manual.• Standard details updated to reflect 3D design.• Letting process submits all files to ERMS for long term
storage.
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
11
Current deliverable continued
• 3D breaklines in .dgn & .dxf formats.• Intuitive level names for 3D break lines.• File naming & contents standardized by Design Manual.• Standard details updated to reflect 3D design.• Letting process submits all files to ERMS for long term
storage.
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
12
Current deliverable continued
• 3D breaklines in .dgn & .dxf formats.• Intuitive level names for 3D break lines.• File naming & contents standardized by Design Manual.• Standard details updated to reflect 3D design.• Letting process submits all files to ERMS for long term
storage.
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
13
http://www.iowadot.gov/design/dmanual/20B-71.pdf
Current deliverable continued
• 3D breaklines in .dgn & .dxf formats.• Intuitive level names for 3D break lines.• File naming & contents standardized by Design Manual.• Standard details updated to reflect 3D design.• Letting process submits all files to ERMS for long term
storage.
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
14
Current deliverable continued
• 3D breaklines in .dgn & .dxf formats.• Intuitive level names for 3D break lines.• File naming & contents standardized by Design Manual.• Standard details updated to reflect 3D design.• Letting process submits all files to records management
for long term storage.
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
15
QC/QA PROCESS Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
16
QC/QA on digital deliverables
• Who will do it?• QC: Engineer of record• QA: Methods section of Design Office
• How much QC/QA?• QC: 100% project• QA: 10% of projects
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
17
What is being checked in QC/QA Process?
• Engineered Models (Surfaces)• Geometry• 3D CADD files
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
18
QC/QA for Engineered Models
• Native software suites• Contractor’s software suites
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
19
QC/QA for Geometry
• Manual examination of LandXML files• Horizontal & Vertical spot checks at regular intervals.• H&V spot checks at key locations.
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
20
QC/QA for CADD Files
• Appropriate CADD levels.• Spot check Northing, Easting, & elevation.
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
21
QC/QA process defined
• Design Manual chapter defining process
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
22
FUTURE PLAN Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
23
History of Highway Plans
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
24
The Current Plan
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
25
The Current Plan
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
26
What is an intelligent plan?
• All-inclusive digital package• Combination of PDFs & GIS shape file.
• Flexible reporting on features.• Database and reports.
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
27
What is an intelligent plan?
• Replaces the need for most plan sheets.• A digital plan viewable on a mobile device.• Easy As-Built collection.• Easy to access engineering tabular data.• Standards & Specifications attached directly to the
features.
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
28
The New Plan
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
29
The New Plan
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
30
The New Plan
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
31
Links to Reference Documents
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
32
Links to Reference Documents
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
33
Electronic As-Builts
• As-Built information can be updated in the field.• Directly update database or import later.• Accurate information input as it is done.
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
34
As-Built Data
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
35
As-Built Data
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
36
As-Built Data
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
37
Images
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
38
Asset management
• Asset Information from the field could be tagged to each feature.
• This information could be later leveraged for asset management purposes.
• Database is populated as asset is built.
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
39
ENGINEER SEAL ON DIGITAL PLAN Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
40
Engineer Seal on an Intelligent Plan
• Engineer Seal will cover• LandXML files of Surfaces & Alignments• 3D line string files (CADD Files)• Tabular engineering data.• Sheets that cannot be made digital.
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
41
Thomas HamskiIowa Department of Transportation
[email protected](515) 239-1836
Oct
ober
1, 2
014
2014
IHEE
P Co
nfer
ence
43