Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be...

26
2015 GDOT PowerPoint Title Page Sub Titles Body Text Obstruction Evaluation “What are all these surfaces?” GAA Spring Conference February 19, 2016 Presented By Alan Hood, Airport Safety Data Program Manager Georgia DOT

Transcript of Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be...

Page 1: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

2015GDOT PowerPoint

Title PageSub Titles

Body Text

Obstruction Evaluation“What are all these surfaces?”

GAA Spring ConferenceFebruary 19, 2016

Presented ByAlan Hood, Airport Safety Data Program Manager

Georgia DOT

Page 2: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces

• Categories of approach surfaces for GA Airports.

– State Licensing

– FAA Part 77

– FAA TERPs Visual Surface (20:1)

Approach Surfaces and Obstruction Removal

Page 3: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces

• State Licensing– 3 configurations - based on runway length

• < 4,000’• 4,000’ – 4,999’• 5,000’ +

– Meets visual approach criteria from design guide

• Surface starts at threshold

• Surface needs to be clear to meet the minimum state licensing criteria

• Generally least restrictive of the three surfaces

• Airports inspected biennially

GDOT Airport Licensing Approach Standards

Page 4: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces14

32

<4000’

120’

300’

To3000’

14

32

250’

2250’

4000’ – 4999’

14

32

400’

1800’

>5000’

1000’

To 10,000’

700’

To 5000’

15:1

20:120:1

500’

GDOT Airport Licensing Approach Standards

Page 5: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces

• Obstruction Removal– obstructions should be removed immediately or removal efforts

should be initiated as soon as possible with written plan provided to GDOT by specified date in letter.

– if removal is not possible, displace threshold

• Documentation of obstructions: biennial inspection letter

• Notification– Alan Hood, Airport Safety Data Program Manager and– GDOT Project Manager

GDOT Airport Licensing Approach Standards

Page 6: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces

• Generally most restrictive, used as screening criteria• 9 configurations:

Based on runway category and type of approach<12,500lb - visual = A(V)<12,500lb - visual - opposite A(NP) = A(V) op A(NP)<12,500lb - non-precision = A(NP) >12,500lb - visual = B(V)>12,500lb - visual - opposite D/PIR = B(V) op D/PIR >12,500lb - non-precision @ > ¾ mi visibility = C>12,500lb - non-precision @ > ¾ mi visibility - opposite D/PIR = C op D/PIR>12,500lb - non-precision @ < ¾ mi visibility = D>12,500lb - precision = PIR

• Surface starts 200’ from the end of the runway• Surface should be clear to meet FAA 5010 Safety Data Inspection

Program criteria• Airports inspected biennially

FAA Part 77 Approach Standards

Page 7: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces

14

32

C

500’

14

32

A(V)

250’

14

32

B(V)

500’

14

32

A(NP)

500’

14

32

D

14

32

PIR

1000’1000’

20:1 20:1 20:1

34:1 34:1

50:1

5,000’

10,000’

40,000’FAA Part 77 Approach Standards

Page 8: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces

• Obstruction Removal– Obstructions should be removed or provide schedule for removal

• Documentation of obstructions:• biennial inspection letter• FAA 5010 report

• Notification Required– Provide sketch and coordinates of cleared area– Alan Hood, Airport Safety Data Program Manager and– GDOT Project Manager– GDOT will coordinate with FAA to remove from FAA database

FAA Part 77 Approach Standards

Page 9: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces

Who is Responsible?•Ultimately the Sponsor

-State Licensing and Part 77 Inspections: When obstructions are identified in an inspection, they become a liability.

-State Licensing surface obstructions could lead to denial of license.

Page 10: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces

• Surface starts 200’ from threshold

• 20:1 Approach Slope

• Obstructions should be mitigated to maintain night minimums

• When are procedures reviewed?– Any request for change in approach, name change, LOC-ID

change, runway numeral change, etc– FAA performs review of airport’s terminal procedures every 2

years

FAA TERPs Visual Surface Standards (20:1)

Page 11: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces

14

32

C

500’

14

32

A(NP)

500’

20:1

34:1Surface for Categories A – D are all same size

now

400’

20:1 20:1

400’

FAA TERPs Visual Surface Standards (20:1)

Page 12: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces

• Obstruction Removal– mitigate obstructions by:

• removal• lighting• PAPI waiver – requires FAA Flight Standards approval

– obstructions should be mitigated to maintain nighttime procedures.

• Obstruction removal previous to “20:1” letter from Flight Procedures.– Sketch and coordinates of cleared area– Alan Hood, Airport Safety Data Program Manager and– GDOT Project Manager– GDOT notifies FAA to update database

FAA TERPs Visual Surface Standards (20:1)

Page 13: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation SurfacesFAA TERPs Visual Surface Standards (20:1)

Page 14: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces

•Ultimately the Sponsor

-Sponsors are also responsible for ensuring the TERPs Visual Surface is clear. Flight Procedures uses the FAA surveyed obstruction database to review procedures.

-Obstructions do not automatically disappear from database with a new survey.

-Must submit sketch with coordinates and boundaries of cleared areas to get obstructions removed from database.

***If you have been notified you have obstructions by Flight Procedures – then you validate the obstructions in writing. No survey or coordinates and boundaries required unless you are topping obstructions.

Who is Responsible?

Page 15: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces

• Using Google Earth – 5000’ Runway with GPS Approach

• State Licensing Approach

• FAA Part 77 Category C

• TERPS 20:1

Graphic Representation – 3 Surfaces

Page 16: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces

400’ Inner Width – at

Runway End

State Licensing -

5000+20:1

Page 17: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces

500’ Inner Width – 200’ from Runway

End

FAA Part 77 –Category C

34:1

Page 18: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces

400’ Inner Width – 200’ from Runway

End

TERPS 20:1

Page 19: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces

State Licensing/

FAA Part 77/ TERPs 20:1

Page 20: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces

• Using Google Earth – 3700’ Runway with GPS Approach

• State Licensing Approach

• FAA Part 77 Category A(NP)

• TERPS 20:1

Graphic Representation – 3 Surfaces

Page 21: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces

120’ Inner Width – at

Runway End

State Licensing -

-400015:1

Page 22: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces

500’ Inner Width – 200’ from Runway

End

FAA Part 77 –Category

A(NP)20:1

Page 23: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces

400’ Inner Width – 200’ from Runway

End

TERPS 20:1

Page 24: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation Surfaces

State Licensing/

FAA Part 77/ TERPs 20:1

Page 25: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation SurfacesThreshold Citing Table – AC 150-5300-13A

Page 26: Obstruction Evaluation “What are all these surfaces?” 2015 ... · – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with

Obstruction Evaluation SurfacesQuestions?