![Page 1: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/1.jpg)
Objectives
• Finish DOAS
• Control – Terminology– Types of controllers
• Differences
– Controls in the real world• Problems
• Response time vs. stability
![Page 3: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/3.jpg)
DOAS fresh air configurations
![Page 4: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/4.jpg)
DOAS fresh air configurations
![Page 5: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/5.jpg)
Issues Related to DOAS
• Split of sensible and latent load
• Selection of hydronic system
• Winter vs. summer operation – Winter operation with DX systems (heat pump)
![Page 6: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/6.jpg)
Sequence of operation for the control system design
mixing
CCOA
RA
SAHC
Adiabatichumidifier
Define the sequence of operation for:WINTER operation and:
- case when humidity is not controlled- case when humidity is precisely controlled
Solution on the whiteboard
![Page 7: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/7.jpg)
Economizer Fresh air volume flow rate control
mixing
damper
Fresh(outdoor) air
T & RH sensors
Recirc. air
% fresh air
Minimum for ventilation
100%
TOA (hOA)
enthalpy
![Page 8: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/8.jpg)
Economizer – cooling regime
Example of SEQUENCE OF OERATIONS:
If TOA < Tset-point open the fresh air damper the maximum position
Then, if Tindoor air < Tset-point start closing the cooling coil valve
If cooling coil valve is closed and T indoor air < Tset-point start closing the damper till you get T indoor air = T set-point Other variations are possible
![Page 9: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/9.jpg)
Basic purpose of HVAC control
Daily, weekly, and seasonal swings make HVAC control challenging
Highly unsteady-state environment
Provide balance of reasonable comfort at minimum cost and energy
Two distinct actions:
1) Switching/Enabling: Manage availability of plant according to schedule using timers.
2) Regulation: Match plant capacity to demand
![Page 10: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/10.jpg)
Terminology
• Sensor– Measures quantity of
interest
• Controller– Interprets sensor data
• Controlled device– Changes based on
controller outputFigure 2-13
![Page 11: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/11.jpg)
DirectClosed Loop or Feedback
IndirectOpen Loop or Feedforward
outdoor
![Page 12: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/12.jpg)
• Set Point – Desired sensor value
• Control Point– Current sensor value
• Error or Offset– Difference between control point and set point
![Page 13: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/13.jpg)
Two-Position Control Systems
• Used in small, relatively simple systems
• Controlled device is on or off– It is a switch, not a valve
• Good for devices that change slowly
![Page 14: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/14.jpg)
• Anticipator can be used to shorten response time• Control differential is also called deadband
![Page 15: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/15.jpg)
Residential system - thermostat
• ~50 years old DDC thermostat
- Daily and weekly programming
![Page 16: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/16.jpg)
Modulating Control Systems
Example: Heat exchanger control– Modulating (Analog) control
air
water
Cooling coil
(set point temperature)
x
![Page 17: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/17.jpg)
Modulating Control Systems• Used in larger systems• Output can be anywhere in operating range• Three main types
– Proportional– PI– PID
Position (x)
fluid
Electric (pneumatic) motor
Vfluid = f(x) - linear or exponential function
Volume flow rate
![Page 18: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/18.jpg)
The PID control algorithm
For our example of heating coil:
Proportional Integral Differential
time
Position (x)
constants
e(t) – difference between set point and measured value
d
TTdTKdTT
T
KTTKx d
i
)()()( measuredpointset
measuredpointset measuredpointset
Proportional(how much)
Integral(for how long)
Differential(how fast)
Position of the valve
![Page 19: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/19.jpg)
Proportional Controllers
x is controller output
A is controller output with no error
(often A=0)
Kis proportional gain constant
e = is error (offset)
)( measuredpointset TTKAx
measuredpointset TT
![Page 20: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/20.jpg)
Stable systemUnstable system
![Page 21: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/21.jpg)
Issues with P Controllers
• Always have an offset
• But, require less tuning than other controllers
• Very appropriate for things that change slowly– i.e. building internal temperature
![Page 22: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/22.jpg)
Proportional + Integral (PI)
K/Ti is integral gain
If controller is tuned properly, offset is reduced to zero
Figure 2-18a
dTTT
KTTKAx
i
)()( measuredpointset measuredpointset
![Page 23: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/23.jpg)
![Page 24: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/24.jpg)
Issues with PI Controllers
• Scheduling issues
• Require more tuning than for P
• But, no offset
![Page 25: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/25.jpg)
Proportional + Integral + Derivative (PID)
• Improvement over PI because of faster response and less deviation from offset– Increases rate of error correction as errors get larger
• But– HVAC controlled devices are too slow responding– Requires setting three different gains
![Page 26: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/26.jpg)
Ref: Kreider and Rabl.Figure 12.5
![Page 27: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/27.jpg)
The control in HVAC system – only PI
dTTT
KTTKx
i
)()( measuredpointset measuredpointset
Proportional Integral
Proportionalaffect the slope
Integralaffect the shape after the first “bump”
Set point
Set point
value
![Page 28: Objectives Finish DOAS Control –Terminology –Types of controllers Differences –Controls in the real world Problems Response time vs. stability.](https://reader035.fdocuments.in/reader035/viewer/2022062807/5697c0231a28abf838cd423b/html5/thumbnails/28.jpg)
The Real World
• 50% of US buildings have control problems– 90% tuning and optimization– 10% faults
• 25% energy savings from correcting control problems
• Commissioning is critically important