Objective ITY-AGVCS2

12
Objective ITY-AGVCS2 ESSIP Plan 2013 Oscar ALFARO DSS/EIPR 13.09.2013

description

Objective ITY-AGVCS2. ESSIP Plan 2013. Oscar ALFARO DSS/EIPR 13.09.2013. Objective ITY-AGVCS2. Explanation What is new or has changed since previous ESSIP edition Link to European ATM Master Plan Most important SLoA (s) Finalisation Criteria and Closed Questions Supporting Material - PowerPoint PPT Presentation

Transcript of Objective ITY-AGVCS2

Page 1: Objective ITY-AGVCS2

Objective ITY-AGVCS2

ESSIP Plan 2013

Oscar ALFARODSS/EIPR

13.09.2013

Page 2: Objective ITY-AGVCS2

ESSIP Plan 2013 / Objective ITY-AGVCS2L 2

Objective ITY-AGVCS2

Explanation What is new or has changed since previous ESSIP edition Link to European ATM Master Plan Most important SLoA(s) Finalisation Criteria and Closed Questions Supporting Material ESSIP Report 2012 Objective Coordinator’s Analysis, recommendations, tips & tricks Conclusions Links and contacts

Page 3: Objective ITY-AGVCS2

ESSIP Plan 2013 / Objective ITY-AGVCS2 3

Explanation

The objective is based in Regulation (EU) No 1079/2012 and mandates: the conversion of all* 25 kHz frequency assignments to 8,33 kHz by

12/2018 all* radios and voice communication systems need to be 8,33 kHz-capable

by 12/2017 * There are multiple exemptions and derogations and specific

requirements for State aircraft (see field ‘Derogations’ for each SLoA)

The objective complements previous ITY-AGVCS which covered the requirements above FL195, this objective extends the mandate down to the ground.

It has an interim target for frequency conversions for AT, DE, FR, IE, IT, LU, HU, NL and UK to be achieved by 12/2014 (see REG02 & ASP02)

Applicable to EU+ States

Page 4: Objective ITY-AGVCS2

ESSIP Plan 2013 / Objective ITY-AGVCS2 4

What is new or has changed since previous ESSIP edition

N/A (New objective)

Page 5: Objective ITY-AGVCS2

ESSIP Plan 2013 / Objective ITY-AGVCS2 5

Link to European ATM Master Plan

[CTE-C5]- 8,33 kHz Voice communications Air-Ground: VHF 8.33 kHz is mandated in all continental airspace to support increases in traffic.

Page 6: Objective ITY-AGVCS2

ESSIP Plan 2013 / Objective ITY-AGVCS2 6

Most important SLoA(s)

N/A (all)

Page 7: Objective ITY-AGVCS2

ESSIP Plan 2013 / Objective ITY-AGVCS2 7

Finalisation Criteria and Closed Questions

N/A (See objective description) No additional closed questions other than the established

finalisation criteria

Page 8: Objective ITY-AGVCS2

ESSIP Plan 2013 / Objective ITY-AGVCS2 8

Supporting Material

As specified in SLoAs detailed descriptions

Page 9: Objective ITY-AGVCS2

ESSIP Plan 2013 / Objective ITY-AGVCS2 9

ESSIP Report 2012

N/A (new objective)

Page 10: Objective ITY-AGVCS2

ESSIP Plan 2013 / Objective ITY-AGVCS2 10

Objective Coordinator’s Analysis, recommendations, tips & tricks

Read carefully the SLoAs’ definitions and derogations

Note that there are many instances where notifications to the European Commission are required

Note that REG02/ASP02 apply only AT, DE, FR, IE, IT, LU, HU, NL and UK

Page 11: Objective ITY-AGVCS2

ESSIP Plan 2013 / Objective ITY-AGVCS2 11

Conclusions

N/A

Page 12: Objective ITY-AGVCS2

ESSIP Plan 2013 / Objective ITY-AGVCS2 12

Conclusions

Objective Coordinator: Oscar ALFARO; +32 2 729 4665

[email protected]

Octavian CIOARA; +32 2 729 3282

[email protected]