OASIS SUBCOMMITTEE STATUSEC Meeting
4/29/14
Preemption and CompetitionAnnual Plan Items Affected2013 AP Item 2(a) Develop version 2 business practice
standards to better coordinate the use of the transmission system among neighboring transmission providers. Request R050004 was expanded to include the Order No. 890 (Docket Nos.RM05-17-000 and RM02-25-000), (Order No. 890-A (Docket Nos. RM05-17-001, 002 and RM05-25-001, 002), and Order No. 890-B (Docket Nos. RM05-17-03 and RM05-25-03) “Preventing Undue Discrimination and Preference in Transmission Services”
–(i) Group 4: Pre-Emption; Request No. R05019• (1) Pre-Emption• (2) Request No. R05019
2013 AP Item 5(c) Add language to WEQ-001-4 Online Negotiation and Confirmation process to clarify Table 4-3 (R09003)
Preemption and Competition Working on all phases of Preemption and Competition
o Short-Term Firm Preemption and Competitiono Non-Firm Preemption and Competitiono Competition for Rollover Rights (Long-Term Competition)
Main Outstanding Scope Issues o Resales (including aggregation of resales and redirect of resales)o Competition for Rollover Rights
Make revisions to Business Practice Standardso WEQ-000o WEQ-001o WEQ-002o WEQ-003o WEQ-013
Out for formal comments 4Q 2014
Preemption and Competition Main Outstanding Issues
o Resales (including aggregation of resales and redirect of resales)• Scheduling Rights vs Transmission Capacity
Scheduling Rights – Parent reservation has ROFRTransmission Capacity – Assignee has ROFRResales may be aggregated for larger capacity or longer duration resaleResales may be redirected
o Competition for Rollover Rights• Competition opportunity whenever LT request is queued• Competition opportunity when Renewal is queued
Scheduling and Capacity Rights are different. Only TSRs with Capacity Rights have ROFR. This example will be used to show the difference.
TSR #10 for 30 MWConditional
TSR #11 for 20 MWConditional
TSR #12 for 40 MWConditional
TSR #2030 MW (Scheduling)
10 10 10Resale
Resale
Resale
TSR #3020 MW (Scheduling)
TSR #4015 MW
ResaleRedirect
Aggregate
Where does the capacity come from?
Customer A Customer A
Customer B
Customer A
Customer C
Preemption and Competition
Preemption and Competition When only Scheduling Rights are assigned to Resales there are instances where Scheduling Rights and Capacity Rights are different (mis-matched). When a Redirect of an aggregated Resale is performed, it is not possible under current templates to determine the remaining Capacity Rights on the original parent reservations.
Scenario TSR #10 TSR #11 TSR #12 TSR #20 TSR #30 TSR #40
1. Prior to Resales/Redirects 30 MW - C 30 MW - S
20 MW - C20 MW - S
40 MW - C40 MW - S N/A N/A N/A
2. After Aggregation to TSR #20
30 MW - C 20 MW - S
20 MW - C10 MW - S
40 MW - C30 MW - S
0 MW - C30 MW - S N/A N/A
3. After Resale to TSR #30 30 MW - C 20 MW - S
20 MW - C10 MW - S
40 MW - C30 MW - S
0 MW - C10 MW - S
0 MW - C20 MW - S N/A
4. After Redirect to TSR #40 ?? MW - C20 MW - S
?? MW - C10 MW - S
?? MW - C30 MW - S
0 MW - C10 MW - S
0 MW - C5 MW - S
15 MW - C15 MW - S
Ass
ignm
ent o
f Sc
hedu
ling
Righ
ts o
nly
to R
esal
es
Preemption and Competition When Capacity Rights are assigned to Resales there are no mis-matched capacities to track and all capacities are known. The process is simplified because there is no longer a need to track Scheduling Capacity.
Scenario TSR #10 TSR #11 TSR #12 TSR #20 TSR #30 TSR #40
1. Prior to Resales/Redirects 30 MW - C 30 MW - S
20 MW - C20 MW - S
40 MW - C40 MW - S N/A N/A N/A
2. After Aggregation to TSR #20
20 MW - C 20 MW - S
10 MW - C10 MW - S
30 MW - C30 MW - S
30 MW - C30 MW - S N/A N/A
3. After Resale to TSR #30 20 MW - C 20 MW - S
10 MW - C10 MW - S
30 MW - C30 MW - S
10 MW - C10 MW - S
20 MW - C20 MW - S N/A
4. After Redirect to TSR #40 20 MW - C20 MW - S
10 MW - C10 MW - S
30 MW - C30 MW - S
10 MW - C10 MW - S
5 MW - C5 MW - S
15 MW - C15 MW - S
Ass
ignm
ent o
f Ca
paci
ty R
ight
s
to R
esal
es
OASIS CalendarMay 1 Conference CallMay 13-15 Seattle, WA (Seattle City Light) FTFMay 30 Conference CallJun 17-19 Carmel, IN (MISO) FTFJuly 10 Conference CallJuly 22-24 Boise, ID (Idaho Power) FTFJuly 31 Conference CallAug 20-21 Dallas, TX (Oncor) FTF