OASIS Subcommittee Status

9
OASIS SUBCOMMITTEE STATUS EC Meeting 4/29/14

description

OASIS Subcommittee Status. EC Meeting 4/29/14. Preemption and Competition Annual Plan Items Affected. - PowerPoint PPT Presentation

Transcript of OASIS Subcommittee Status

Page 1: OASIS Subcommittee Status

OASIS SUBCOMMITTEE STATUSEC Meeting

4/29/14

Page 2: OASIS Subcommittee Status

Preemption and CompetitionAnnual Plan Items Affected2013 AP Item 2(a) Develop version 2 business practice

standards to better coordinate the use of the transmission system among neighboring transmission providers. Request R050004 was expanded to include the Order No. 890 (Docket Nos.RM05-17-000 and RM02-25-000), (Order No. 890-A (Docket Nos. RM05-17-001, 002 and RM05-25-001, 002), and Order No. 890-B (Docket Nos. RM05-17-03 and RM05-25-03) “Preventing Undue Discrimination and Preference in Transmission Services”

–(i) Group 4: Pre-Emption; Request No. R05019• (1) Pre-Emption• (2) Request No. R05019

2013 AP Item 5(c) Add language to WEQ-001-4 Online Negotiation and Confirmation process to clarify Table 4-3 (R09003)

Page 3: OASIS Subcommittee Status

Preemption and Competition Working on all phases of Preemption and Competition

o Short-Term Firm Preemption and Competitiono Non-Firm Preemption and Competitiono Competition for Rollover Rights (Long-Term Competition)

Main Outstanding Scope Issues o Resales (including aggregation of resales and redirect of resales)o Competition for Rollover Rights

Make revisions to Business Practice Standardso WEQ-000o WEQ-001o WEQ-002o WEQ-003o WEQ-013

Out for formal comments 4Q 2014

Page 4: OASIS Subcommittee Status

Preemption and Competition Main Outstanding Issues

o Resales (including aggregation of resales and redirect of resales)• Scheduling Rights vs Transmission Capacity

Scheduling Rights – Parent reservation has ROFRTransmission Capacity – Assignee has ROFRResales may be aggregated for larger capacity or longer duration resaleResales may be redirected

o Competition for Rollover Rights• Competition opportunity whenever LT request is queued• Competition opportunity when Renewal is queued

Page 5: OASIS Subcommittee Status

Scheduling and Capacity Rights are different. Only TSRs with Capacity Rights have ROFR. This example will be used to show the difference.

TSR #10 for 30 MWConditional

TSR #11 for 20 MWConditional

TSR #12 for 40 MWConditional

TSR #2030 MW (Scheduling)

10 10 10Resale

Resale

Resale

TSR #3020 MW (Scheduling)

TSR #4015 MW

ResaleRedirect

Aggregate

Where does the capacity come from?

Customer A Customer A

Customer B

Customer A

Customer C

Preemption and Competition

Page 6: OASIS Subcommittee Status

Preemption and Competition When only Scheduling Rights are assigned to Resales there are instances where Scheduling Rights and Capacity Rights are different (mis-matched). When a Redirect of an aggregated Resale is performed, it is not possible under current templates to determine the remaining Capacity Rights on the original parent reservations.

Scenario TSR #10 TSR #11 TSR #12 TSR #20 TSR #30 TSR #40

1. Prior to Resales/Redirects 30 MW - C 30 MW - S

20 MW - C20 MW - S

40 MW - C40 MW - S N/A N/A N/A

2. After Aggregation to TSR #20

30 MW - C 20 MW - S

20 MW - C10 MW - S

40 MW - C30 MW - S

0 MW - C30 MW - S N/A N/A

3. After Resale to TSR #30 30 MW - C 20 MW - S

20 MW - C10 MW - S

40 MW - C30 MW - S

0 MW - C10 MW - S

0 MW - C20 MW - S N/A

4. After Redirect to TSR #40 ?? MW - C20 MW - S

?? MW - C10 MW - S

?? MW - C30 MW - S

0 MW - C10 MW - S

0 MW - C5 MW - S

15 MW - C15 MW - S

Ass

ignm

ent o

f Sc

hedu

ling

Righ

ts o

nly

to R

esal

es

Page 7: OASIS Subcommittee Status

Preemption and Competition When Capacity Rights are assigned to Resales there are no mis-matched capacities to track and all capacities are known. The process is simplified because there is no longer a need to track Scheduling Capacity.

Scenario TSR #10 TSR #11 TSR #12 TSR #20 TSR #30 TSR #40

1. Prior to Resales/Redirects 30 MW - C 30 MW - S

20 MW - C20 MW - S

40 MW - C40 MW - S N/A N/A N/A

2. After Aggregation to TSR #20

20 MW - C 20 MW - S

10 MW - C10 MW - S

30 MW - C30 MW - S

30 MW - C30 MW - S N/A N/A

3. After Resale to TSR #30 20 MW - C 20 MW - S

10 MW - C10 MW - S

30 MW - C30 MW - S

10 MW - C10 MW - S

20 MW - C20 MW - S N/A

4. After Redirect to TSR #40 20 MW - C20 MW - S

10 MW - C10 MW - S

30 MW - C30 MW - S

10 MW - C10 MW - S

5 MW - C5 MW - S

15 MW - C15 MW - S

Ass

ignm

ent o

f Ca

paci

ty R

ight

s

to R

esal

es

Page 8: OASIS Subcommittee Status

OASIS CalendarMay 1 Conference CallMay 13-15 Seattle, WA (Seattle City Light) FTFMay 30 Conference CallJun 17-19 Carmel, IN (MISO) FTFJuly 10 Conference CallJuly 22-24 Boise, ID (Idaho Power) FTFJuly 31 Conference CallAug 20-21 Dallas, TX (Oncor) FTF