Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International...

18
Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International Airport Elie Jalkh Marwan Bejjani Steve Raney

Transcript of Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International...

Page 1: Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International Airport Elie Jalkh Marwan Bejjani Steve Raney.

Oakland Airport ConnectorAutomated People Mover forOakland Coliseum BART to Oakland International Airport

Elie JalkhMarwan Bejjani

Steve Raney

Page 2: Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International Airport Elie Jalkh Marwan Bejjani Steve Raney.

Why?• Airport: Doubling capacity. Increasing market

share. Hegenberger, 98th Street - low LOS Parking shortage

• City of Oakland: Redevelopment

• BART: part of ’50’s plan. Unused capacity.

Page 3: Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International Airport Elie Jalkh Marwan Bejjani Steve Raney.

Map

Page 4: Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International Airport Elie Jalkh Marwan Bejjani Steve Raney.

Alameda County Measure B Sales Tax

• Specified APM – airport sensitive about traffic

• Only Sierra Club opposed (cost effectiveness)

• Cost given as $130M “Knew it would cost twice as much” $232M and counting Scrambling for $

Page 5: Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International Airport Elie Jalkh Marwan Bejjani Steve Raney.

September 11• Air passengers up 14% Oct ’01 vs ‘00

• Airport station security

Page 6: Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International Airport Elie Jalkh Marwan Bejjani Steve Raney.

Rider experience• 48% air passengers have carry on bags

• Not fastest mode, but most reliable Hwy 880 LOS F Faster from SF to OAK than SFO

• Closer than parking, moving walkways, 2 floors down

• Seamless ticketing

Page 7: Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International Airport Elie Jalkh Marwan Bejjani Steve Raney.

AirBART / Quality Bus

• Profitable

• 750,000 trips per year, 6.2% share

• Not given a fair shot in EIR

• Signal control, increased service will happen

• Worst case trip time.

Page 8: Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International Airport Elie Jalkh Marwan Bejjani Steve Raney.

TOD• Metroport: 1.3M sq feet, 300 hotel rooms, parking

• BART station: transit village, Hope IV, offices

• More

Page 9: Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International Airport Elie Jalkh Marwan Bejjani Steve Raney.

Parking – 40% of OAK revenue

• OAK losing 2,000 spaces

• Coliseum BART parking – free for day trips

• BART paid overnite parking

• New development has competing parking

• OAK plans to add 2 lots w/ bus.

Page 10: Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International Airport Elie Jalkh Marwan Bejjani Steve Raney.

Economics / Feasibility

• 13 mi BART trip on average: $2.15

• From EIR numbers, does not cover debt service

• 16% share is high. (Reagan: 14%, Atlanta: 8%)

• Annual trip growth

• $232M construction. All BART projects more

• Low fares: OAC $3, BART inflation

Year Trips OAC BART Cost Profit2005 2.4 4.8 5.1 5.7 4.22020 4.2 8.0 8.9 7.3 10.0

Millions

Page 11: Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International Airport Elie Jalkh Marwan Bejjani Steve Raney.

Multiple agencies cooperating

• Conflict over airport station Marketing Construction, traffic impact

• Conflict over strategy

Page 12: Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International Airport Elie Jalkh Marwan Bejjani Steve Raney.

Recommendation: APM is good

• Covers operating costs – improves BART utilization at “low” cost

• Without APM, Metroport won’t be built

• Without removing cars, TOD and air passenger growth would stall

• TOD is crucial for Oakland

• THE END.

Page 13: Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International Airport Elie Jalkh Marwan Bejjani Steve Raney.

AirBART Ridership Statistics

• 1999 463,057 riders 4.68% of airline passengers

• 2000 573,728 riders (24% growth from 1999) 5.40% of airline passengers

• 2001 284,056 riders (through May) Over 750,000 riders anticipated for 2001 6.10% of airline passengers (through May)

Page 14: Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International Airport Elie Jalkh Marwan Bejjani Steve Raney.

Terminal Expansion ProgramWhy Expand?

• 7.0 MAP Comfortable currentterminal capacity

• 11.3 MAP Approximate current passenger load

• 17.7 MAP 2010 passenger load*

• 25.1 MAP 2020 passenger load*

*Regional Airport System Plan Update 2000, Volume II, (Regional Airport Planning Committee, February 2001)

MAP = million annual passengers

Page 15: Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International Airport Elie Jalkh Marwan Bejjani Steve Raney.

TerminalExpansionProgram

Parking garage

Dual-level curbsideroadway

Two-levelterminal

Retain Terminal 1and Terminal 2gates

Central concessions hall

Page 16: Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International Airport Elie Jalkh Marwan Bejjani Steve Raney.

BART-OAK ConnectorStation Location

• Minimize vertical transitions

• Minimize walking distances

• Eliminate crossing roadways at-grade

• Locate station as close as possible to security checkpoint

• Locate station as close or closer to the terminal as most convenient parking space

Page 17: Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International Airport Elie Jalkh Marwan Bejjani Steve Raney.

BART-OAK ConnectorFunding

• Port of Oakland: $25 million in PFCs• Eligibility: project must “preserve or

enhance capacity of the national air transportation system”

• Port of Oakland must own/acquire right-of-way

• Project must primarily serve the Airport (passengers and employees)

Page 18: Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International Airport Elie Jalkh Marwan Bejjani Steve Raney.

BART-OAK ConnectorOther Considerations

• Structural separation

• Construction phasing coordination