Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge...

38
Oak Street Bridge Preservation City of Schenectady, Schenectady County October 24, 2018 Roger Laime, P.E. Associate Vice President Christopher Wallin, P.E. City Engineer

Transcript of Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge...

Page 1: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Oak Street Bridge PreservationCity of Schenectady,

Schenectady County

October 24, 2018

Roger Laime, P.E.

Associate Vice President

Christopher Wallin, P.E.

City Engineer

Page 2: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Background

• Constructed in 1937 over existing rail tracks and Sweethill Creek

• Six (6) Total Spans

• Steel Girder and Floor beam System

• Two driving lanes flanked by sidewalks

Page 3: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Project Location

Schenectady County

City of Schenectady

Project Location

Fire Station

School

Bellevue

Mount Pleasant

Page 4: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

How We Got Here

Ambiguous Ownership

Page 5: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Bridge Ownership

• Historically ownership split:

– City owns and maintains the deck

– Railroad owns and maintains the substructure

• Other Similar Owned Bridges in City:

– Kings Road Bridge

– Crane Street Bridge

Page 6: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Bridge Closure

• NYSDOT issued a letter to the Railroad regarding the bridges condition.

• Railroad makes “repairs”, April 2014

• Bridge closed to traffic April 2013 due to deterioration of steel.

Page 7: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Funding Strategies

• Project listed on Transportation Improvement Program (TIP) list for replacement POST 2018

• TIP Amendment submitted to the local Metropolitan Planning Organization (MPO) to bring project into current TIP.

– Scope Change to Preservation

– Estimate reduced ($4.1M to $2.05)

– Timeline changed to 2014 Design, 2015Construction

Page 8: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Project Timeline

• Consultant selected - April, 2014

• Temporary Permit to Enter (TPE) granted for survey - August, 2014

• TPE granted for inspection - November, 2014

• Preliminary and Final Design - 2015 through 2017

• Construction 2018 with substantial completion August 2018

Page 9: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Railroad Agreements and Costs

• Draft Design & Construction Phase Agreement with Railroad

– Communication begins - April, 2015

– Draft Agreement - January, 2016

– Authorized Agreement - September, 2016

• Design Review, $98,360

• Construction Personnel (flaggers), $314,860

Page 10: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

WARNING THE FOLLOWING BRIDGE PHOTOS ARE RATED:

Page 11: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Bridge Conditions - 2017

Looking East

Page 12: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Bridge Conditions - 2017

Looking East

Cables installed by Railroad

Page 13: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Bridge Conditions - 2017

Looking West

Page 14: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Bridge Conditions - 2017

Looking West

Cables installed by Railroad

Page 15: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Bridge Conditions - 2017

Cables, Ties and Section Loss

Page 16: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Bridge Conditions - 2017

Section Loss & Corrosion

Page 17: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Bridge Conditions - 2017

Section Loss & Corrosion

Page 18: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Bridge Conditions - 2017

Section Loss & Corrosion

Page 19: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

PDH Question #1

• What must a Consultant or Contractor secure before entering onto Railroad property?

a) A certified resolution from the local Municipality

b) A copy of the railroads insurance

c) A Temporary Permit to Enter (TPE) from the Railroad

d) A ticket from the nearest train station

Page 20: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Design Issues• How to maximize repairs with a fixed budget

– Identified required repairs

Page 21: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Design Issues• How to maximize repairs with a fixed budget

– Identified required repairs

– Prepared preliminary estimatesPier Steel Repairs $529,000Superstructure Steel Repairs $371,000Clean and Paint Bridge $1,475,000Additional Superstructure Steel Repairs $136,000Repair Expansion Joints $28,000Abutment and Pier Concrete Repairs $57,000Clean and Lubricate Bearings $50,000Repair Curb / Reseal Joint -Slab and Sidewalk $42,000

Total Estimated Construction Cost $2,688,000

Page 22: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Design Issues• How to maximize repairs with a fixed budget

– Identified required repairs

– Prepared preliminary estimates

– Discussed pros and cons of each

- Pier Steel Repairs- Superstructure Steel Repairs- Clean and Paint Bridge- Additional Superstructure Steel Repairs- Repair Expansion Joints- Abutment and Pier Concrete Repairs- Clean and Lubricate Bearings- Repair Curb / Reseal Joint -Slab and Sidewalk

Page 23: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Design Issues• Where to draw the line when making repairs

Page 24: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Design Issues• The cost of bridge painting

Painting Cost Estimate: $1.5 Million

Page 25: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Construction Issues• Difficult Site Access from below

• Maintaining Pedestrian Access

Page 26: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Construction Issues

• Steel Crack Repairs

• Rivet Replacements

“. . . bring the structure up to the current AASHTO code requirements for strength, service life, and fatigue resistance.”

Page 27: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

PDH Question #2

• Riveted connections in structures are classified as what category for fatigue resistance per the AASHTO Specifications:

a) Category A

b) Category B

c) Category C

d) Category D

Page 28: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Construction Issues• Working with the railroad

Page 29: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Construction Issues

• Maintaining Construction schedule

Original Completion Schedule: July 2016Actual Completion: August 2018

Page 30: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Construction Issues

• Deck Repairs

Page 31: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

PDH Question #3

• Clear cover on concrete bridge decks, based on NYSDOT guidelines, using epoxy reinforcement is:

a) 2”

b) 2.5”

c) 3”

d) 3.5”

Page 32: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Construction Issues

• Appearance is everything

– Cleaning, painting and maintenance above the deck (what the public sees)

Page 33: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Construction Issues

Before

Page 34: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Construction Issues

After

Page 35: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Construction Issues

After-After

Page 36: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Construction Issues

• Bridge Deck deficiencies– Concrete test results

Test sample failed due to excessive deleterious material (shale and phyllite)

Page 37: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

Summary• Project Schedule

– Design Completed: 2015

– Construction planned: 2016 (on STIP)

– Construction actual: 2017 – 2018

– Bridge Opened to Traffic: August 7, 2018

• Project Cost

– Actual Construction Cost - $1.75 Million

Page 38: Oak Street Bridge Preservation - NYSDOT Home · –Kings Road Bridge –Crane Street Bridge. Bridge Closure ... •Construction 2018 with substantial completion August 2018. Railroad

QUESTIONS ?