NWP Activities at INM José A. García-Moya SMNT – INM 27th EWGLAM & 12th SRNWP Meetings...
-
Upload
myles-small -
Category
Documents
-
view
221 -
download
0
Transcript of NWP Activities at INM José A. García-Moya SMNT – INM 27th EWGLAM & 12th SRNWP Meetings...
NWP Activities at INM
José A. García-MoyaSMNT – INM
27th EWGLAM & 12th SRNWP MeetingsLjubljana, October 2005
October 2005 27th EWGLAM & 12th SRNWP Meetings
2
Introduction
Operational activities. Computer resources Hirlam as operational model. Wave model. Verification.
Research in NWP: Hirlam project.
Data Assimilation Coupling dynamic-physic in Hirlam Physical parameterizations
SREPS
October 2005 27th EWGLAM & 12th SRNWP Meetings
3
Computer resources
Cray X1e 15 nodes, 8 MSP’s each node 4 SSP’s each MSP 320 Gb memory 2.3 TF peak performance
Official acceptance: June 2005
October 2005 27th EWGLAM & 12th SRNWP Meetings
4
Cray X1e MSP
October 2005 27th EWGLAM & 12th SRNWP Meetings
5
Hirlam operational model
ONR 0.16 deg latxlon, 40 levels 72 hours forecast, 4 times a day 3DVAR BC’s from ECMWF
HNR and CNN 0.05 deg latxlon, 40 levels 36 hours forecast, 4 times a day 3DVAR BC’s from ONR
October 2005 27th EWGLAM & 12th SRNWP Meetings
6
ONR integration area
October 2005 27th EWGLAM & 12th SRNWP Meetings
7
HNR – CNN integration areas
October 2005 27th EWGLAM & 12th SRNWP Meetings
8
Verification 2005
Standard verification against observations.
Verification against Spanish High Resolution precipitation network.
Monthly comparison ONR-HNR models for Spain.
October 2005 27th EWGLAM & 12th SRNWP Meetings
9
Geopotential June-August 2005
October 2005 27th EWGLAM & 12th SRNWP Meetings
10
MSLP June-August
October 2005 27th EWGLAM & 12th SRNWP Meetings
11
Precip. by thresholds POD-FAR
October 2005 27th EWGLAM & 12th SRNWP Meetings
12
Wave operational model
WAM 4 for Atlantic and Mediterranean
High resolution shallow water model
October 2005 27th EWGLAM & 12th SRNWP Meetings
13
Wave operational model
October 2005 27th EWGLAM & 12th SRNWP Meetings
14
High Resolution Wave operational model
October 2005 27th EWGLAM & 12th SRNWP Meetings
15
Hirlam Project – Data Assimilation
3DVAR in operational models. Assimilation of GPS data (TOUGH project). Test of Hirlam 4DVAR in the Cray X1e. Soil moisture analysis comparison
between Hirlam reference system and 1DVAR version (ELDAS project).
Mesoscale Rapid Update Cycle of analysis of surface parameters.
Assimilation of VAD winds from INM radar network.
October 2005 27th EWGLAM & 12th SRNWP Meetings
16
Spring period: 15 April-15 May 2004
Impact of introducing 31 new GPS sites
ETS and TSS show that increasing the number of GPS sites improves model precipitation.
Verification with INM Climate stations (upscaled to 22km).
PP thresholds (0.1, 0.3, 1., 3., 10., 30., 100. mm in 24 hours)
October 2005 27th EWGLAM & 12th SRNWP Meetings
17
Hirlam Project – Dynamics
Different strategies of coupling dynamics-physic in Hirlam.
Stability and same meteorological quality with larger time step.
October 2005 27th EWGLAM & 12th SRNWP Meetings
18
Hirlam Project – Physics
Surface processes: Snow OI analysis. ECOCLIMAP database in Hirlam. New formulation of snow processes
using two additional tiles: snow over open land Snow over forest
October 2005 27th EWGLAM & 12th SRNWP Meetings
19
Hirlam Project – Physics
Convection: New moist scheme based on Kain-Fritsch
convection and Rasch-Kristjannsson large scale implemented into the HIRLAM reference system.
Forecast 10-20 % more expensive and even more on vector computers (vector optimization in progress).
Improvement of precipitation over Iberia.
October 2005 27th EWGLAM & 12th SRNWP Meetings
20
True Skill Statistic + Equitable Threat Score over Iberia (2-3 months)
October 2005 27th EWGLAM & 12th SRNWP Meetings
21
SREPS - Multi-model Multi-boundaries
Models: Hirlam. HRM MM5 UM
Boundaries ECMWF UM AVN GME
October 2005 27th EWGLAM & 12th SRNWP Meetings
22
Ensemble
72 hours forecast four times a day (00, 06, 12 y 18 UTC).
Characteristics: 4 models. 4 boundary conditions. 4 last ensembles (HH, HH-6, HH-12, HH-18).
16 member ensemble every 6 hours Time-lagged Super-Ensemble of 64
members every 6 hours.
October 2005 27th EWGLAM & 12th SRNWP Meetings
23
SREPS
BCs / Model
AVN ECMWF
GME UM
Hirlam X X X X
Hrm X X X X
MM5 X X X X
UM O O O X
October 2005 27th EWGLAM & 12th SRNWP Meetings
24
Road Map2003-2004
Research to find best ensemble for the Short Range
Jun 04 – Jun 05
Building Multimodel System
Jun 05-Dec 05
Mummubn/16 members
Daily run non-operational
Mar 06 Mummub 16/16
members
Full operations
Jun 06 Mummub+4lag64 members
First try