NW SW - assets.gov.ie
Transcript of NW SW - assets.gov.ie
SITE COMPOUND(LAUNCH SHAFT)
SITE COMPOUND(RECEPTION SHAFT)
TEMPORARY ACCESSROADS (6m WIDE)
P2 - BH113
P2 - BH114
EXISTING ENTRANCE
SITE COMPOUND(RECEPTION SHAFT)
AV-6
SCV-3
Pipe &GroundCondittions
Ground Level
Invert Level
79.3
5
80.0
6
74.7
5
79.3
5
73.5
1
74.7
5
73.4
9
73.5
1
74.2
1
73.4
9
76.3
7
74.2
1
5+200
79.1
5
5+300
78.9
5
5+400
79.3
3
5+500
80.1
0
5+600
83.1
2
5+700
84.4
4
SITE COMPOUND(LAUNCH SHAFT)
SITE COMPOUND(RECEPTION SHAFT)
TEMPORARY ACCESSROADS (6m WIDE)
P2 - BH113
P2 - BH114
EXISTING ENTRANCE
SITE COMPOUND(RECEPTION SHAFT)
AV-6
SCV-3
NE
E
SE
S
SW
WNW
N
DECLAN CUNNINGHAM 2004
Ordnance Survey Ireland Licence number EN 0016018. © Ordnance Survey Ireland/Government of Ireland
Client:
Project:
Title:
Scale @ A3:
Prepared by: Checked: Date:
Project Director:
Drawing No.:
Revision:
Rev Date Description By Chkd.
Drawing Status:
LOCATION OF CROSSING POINTS,ORBITAL SEWERS/OUTFALL
PIPELINE & MOTORWAYS- N2
As Shown
A. O'Callaghan D. Conneran January 2016
C. O'Keeffe
Draft
Drawing No. 13 D
A 23.05.16 ISSUED FOR REPORT AOC DC
B 28.08.17 ISSUED FOR REPORT AOC DC
C 18.12.17 ISSUED FOR REPORT AOC JF
D 04.05.18 ISSUED FOR REPORT AOC BD
SITE INVESTIGATIONPHASE 2 - BH113
SITE INVESTIGATIONPHASE 2 - BH114
5.5mØ RECEPTION SHAFT
1,400 mm Rising Main from Abbotstown Pumping Station
Grassland M2/N2Public Road
Grassland
AV-6
SCV-3
PROPOSED ORBITAL SEWERCHAINAGE: 5+100 TO 5+800Scale 1:2,000
PROPOSED ORBITAL SEWERCHAINAGE: 5+100 TO 5+800Scale H-1:1,000 / V-1:100
Grassland
5.5mØ RECEPTION SHAFT
1400mm TRENCHLESS CROSSING
9.0mØ LAUNCH SHAFT
SANDY GRAVELLY CLAY
BEDROCK
BOREHOLE LOCATIONS
SILT
TOPSOIL
LEGEND:
PLANNING BOUNDARY
CONSTRUCTIONCOMPOUNDS
PROPOSED ORBITALSEWER ROUTE(GRAVITY)
PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)
PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)
PROPOSED ORBITALSEWER ROUTE(RISING MAIN)
PROPOSED ACCESS ROAD
N O T E S :
1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING.
2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE
3. ENGINEER/EMPLOYERS REPRESENTATIVE, ASAPPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFOREANY WORK COMMENCES
4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION,DIAMETER AND INVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND,BEFORE ANY WORK COMMENCES.
5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD
TEMPORARY ACCESSROADS (6m WIDE)
P2 - BH124
SITE COMPOUND(RECEPTION SHAFT)
P2 - BH125
SITE COMPOUND(LAUNCH SHAFT)
MH-50
MH-51
MH-49
SITE COMPOUND(LAUNCH SHAFT)
TEMPORARY ACCESSROADS (6m WIDE)
Pipe &GroundCondittions
Ground Level
Invert Level
48.7
4
48.5
4
49.2
3
48.9
7
49.6
1
49.2
3
48.9
7
48.7
4
11+600
57.0
2
11+700
56.2
9
TEMPORARY ACCESSROADS (6m WIDE)
P2 - BH124
SITE COMPOUND(RECEPTION SHAFT)
P2 - BH125
SITE COMPOUND(LAUNCH SHAFT)
MH-50
MH-51
MH-49
SITE COMPOUND(LAUNCH SHAFT)
TEMPORARY ACCESSROADS (6m WIDE)
NE
E
SE
SSW
WNW
N
DECLAN CUNNINGHAM 2004
Ordnance Survey Ireland Licence number EN 0016018. © Ordnance Survey Ireland/Government of Ireland
Client:
Project:
Title:
Scale @ A3:
Prepared by: Checked: Date:
Project Director:
Drawing No.:
Revision:
Rev Date Description By Chkd.
Drawing Status:
LOCATION OF CROSSING POINTS,ORBITAL SEWER/OUTFALL
PIPELINE & ROADS - OLD AIRPORT ROAD
As Shown
A. O'Callaghan D. Conneran January 2016
C. O'Keeffe
Draft
Drawing No. 14 D
A 23.05.16 ISSUED FOR REPORT AOC DC
B 28.08.17 ISSUED FOR REPORT AOC DC
C 18.12.17 ISSUE FOR REPORT AOC JF
D 04.05.18 ISSUED FOR REPORT AOC BD
1,800mm Gravity Sewer
Grassland Collinstown Cross Grassland
SITE INVESTIGATIONPHASE 2 - BH125
5.5mØ RECEPTION SHAFT
9.0mØ LAUNCH SHAFT
1800mmØ TRENCHLESS CROSSING
SITE INVESTIGATIONPHASE 2 - BH125
PROPOSED ORBITAL SEWERCHAINAGE: 11+500 TO 11+800Scale 1:2,000
PROPOSED ORBITAL SEWERCHAINAGE: 11+500 TO 11+800Scale H-1:1,000 / V-1:100
SANDY GRAVELLY CLAY
BEDROCK
BOREHOLE LOCATIONS
SILT
TOPSOIL
LEGEND:
PLANNING BOUNDARY
CONSTRUCTIONCOMPOUNDS
PROPOSED ORBITALSEWER ROUTE(GRAVITY)
PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)
PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)
PROPOSED ORBITALSEWER ROUTE(RISING MAIN)
PROPOSED ACCESS ROAD
9.0mØ LAUNCH SHAFT
N O T E S :
1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING.
2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE
3. ENGINEER/EMPLOYERS REPRESENTATIVE, ASAPPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFOREANY WORK COMMENCES
4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION,DIAMETER AND INVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND,BEFORE ANY WORK COMMENCES.
5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD
SITE COMPOUND(LAUNCH SHAFT)
TEMPORARY ACCESSROAD (6m WIDE)
SITE COMPOUND(RECEPTION SHAFT)
P2 - BH127
P2 - BH126
MH-58
MH-57
TEMPORARY ENTRANCETO COMPOUND
Pipe &GroundCondittions
Ground Level
Invert Level
43.1
8
42.8
9
43.8
3
43.4
8
43.4
8
43.1
8
47.2
4
43.8
3
42.8
942
.52
12+400
52.2
9
12+500
51.7
1
12+600
50.6
4
12+700
50.3
9
12+800
49.8
5
12+900
49.2
9
SITE COMPOUND(LAUNCH SHAFT)
TEMPORARY ACCESSROAD (6m WIDE)
SITE COMPOUND(RECEPTION SHAFT)
P2 - BH127
P2 - BH126
MH-58
MH-57
TEMPORARY ENTRANCETO COMPOUND
NE
E
SE
SSW
WNW
N
DECLAN CUNNINGHAM 2004
Ordnance Survey Ireland Licence number EN 0016018. © Ordnance Survey Ireland/Government of Ireland
Client:
Project:
Title:
Scale @ A3:
Prepared by: Checked: Date:
Project Director:
Drawing No.:
Revision:
Rev Date Description By Chkd.
Drawing Status:
LOCATION OF CROSSING POINTS,ORBITAL SEWER/OUTFALL
PIPELINE & MOTORWAYS- M1 MOTORWAY
As Shown
A. O'Callaghan D. Conneran January 2016
C. O'Keeffe
Draft
Drawing No. 15 D
A 23.05.16 ISSUED FOR REPORT AOC DC
B 28.08.17 ISSUED FOR REPORT AOC DC
C 18.12.17 ISSUED FOR REPORT AOC JF
D 04.05.18 ISSUED FOR REPORT AOC BD
1,800 mm Gravity Sewer
Grassland M1 Motorway and Roundabout Grassland
5.5mØ RECEPTION SHAFT
9.0mØ LAUNCH SHAFT
P2 - BH126
P2 - BH127
1800mmØ TRENCHLESS CROSSING
PROPOSED ORBITAL SEWERCHAINAGE: 12+300 TO 13+000Scale 1:2,000
PROPOSED ORBITAL SEWERCHAINAGE: 12+300 TO 13+000Scale H-1:1,000 / V-1:100
SANDY GRAVELLY CLAY
BEDROCK
BOREHOLE LOCATIONS
SILT
TOPSOIL
LEGEND:
PLANNING BOUNDARY
CONSTRUCTIONCOMPOUNDS
PROPOSED ORBITALSEWER ROUTE(GRAVITY)
PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)
PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)
PROPOSED ORBITALSEWER ROUTE(RISING MAIN)
PROPOSED ACCESS ROAD
N O T E S :
1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS DRAWING.
2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTOR ON SITE
3. ENGINEER/EMPLOYERS REPRESENTATIVE, ASAPPROPRIATE, TO BE INFORMED BY THE CONTRACTOR OF ANY DISCREPANCIES BEFOREANY WORK COMMENCES
4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH CHECK FOR THE ACTUAL LOCATION,DIAMETER AND INVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE AND BELOW GROUND,BEFORE ANY WORK COMMENCES.
5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD
WATERMAIN CROSSINGLOCATION 1
WATERMAIN CROSSINGLOCATION 2
WATERMAIN CROSSINGLOCATION 3
WATERMAIN CROSSINGLOCATION 4
PROPOSED ABBOTSTOWNPUMPING STATION
PROPOSED ACCESSROAD
PROPOSED NORTH FRINGESEWER DIVERSION
PROPOSEDEGRESS ROAD
CLONSHAGHWWTP SITE
NE
E
SE
S
SW
W
NW
N
DECLAN CUNNINGHAM 2004
Client:
Project:
Title:
Scale @ A1:
Prepared by: Checked:
Project Director:
Drawing No.:
Revision:
Rev Date Description By Chkd.
Drawing Status:
Date:
LOCATION OF CROSSING POINTSORBITAL SEWER/OUTFALL PIPELINES & WATERMAINS
- Sheet 1 of 2 -
1:25,000
A. O'Callaghan D. Conneran May 2016
C. O'Keefe
REPORT
Drawing No. 16 D
A 23.05.16 ISSUED FOR REPORT AOC DC
B 28.08.17 ISSUED FOR REPORT AOC DC
C 18.12.17 ISSUED FOR REPORT AOC JF
D 04.05.18 ISSUED FOR REPORT AOC BD
Ordnance Survey Ireland License No EN 0016018 ©Ordnance Survey Ireland/Government of Ireland
Galway Dublin
PROPOSEDPROJECTLOCATION
LEGEND:
PROPOSED ORBITALSEWER ROUTE(GRAVITY)
PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)
PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)
PROPOSED WWTP/PS
PROPOSED ORBITALSEWER ROUTE(RISING MAIN)
TRUNKMAIN(WATERMAIN > 400mm)
N O T E S :
1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THISDRAWING.
2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTORON SITE
3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOROF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES
4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGHCHECK FOR THE ACTUAL LOCATION, DIAMETER ANDINVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE ANDBELOW GROUND, BEFORE ANY WORK COMMENCES
5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD
0+0000+050
0+100
0+150
0+200
0+250
0+300
0+350
0+400
0+450
0+500
0+550
0+6000+600
Point 1
Point 2
Point 3
CROSSING LOCATION 1SCALE : 1:5,000
CROSSING LOCATION 2SCALE : 1:5,000
CROSSING LOCATION 3SCALE : 1:5,000
CROSSING LOCATION 4SCALE : 1:5,000
Point 4
KEYPLAN
Client:
Project:
Title:
Scale @ A1:
Prepared by: Checked:
Project Director:
Drawing No.:
Revision:
Rev Date Description By Chkd.
Drawing Status:
Date:
LOCATION OF CROSSING POINTSORBITAL SEWERS/OUTFALL
PIPELINE & WATERMAINS - Sheet 2 of 2 -
AS SHOWN
A. O'Callaghan D. Conneran May 2016
C. O'Keefe
REPORT
Drawing No. 17 D
A 23.05.16 ISSUED FOR REPORT AOC DC
B 28.08.17 ISSUED FOR REPORT AOC DC
C 18.12.17 ISSUED FOR REPORT AOC JF
D 04.05.18 ISSUED FOR REPORT AOC BD
Ordnance Survey Ireland License No EN 0016018 ©Ordnance Survey Ireland/Government of Ireland
LEGEND:
PROPOSED ORBITALSEWER ROUTE(GRAVITY)
PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)
PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)
PROPOSED WWTP/PS
PROPOSED ORBITALSEWER ROUTE(RISING MAIN)
TRUNKMAIN(WATERMAIN > 400mm)
N O T E S :
1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THISDRAWING.
2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTORON SITE
3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOROF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES
4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGHCHECK FOR THE ACTUAL LOCATION, DIAMETER ANDINVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE ANDBELOW GROUND, BEFORE ANY WORK COMMENCES
5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD
North Dublin
Ringsend WwTP9B Sewer
9C Sewer
WASTEWATERCROSSING LOCATION 1
WASTEWATERCROSSING LOCATION 2
WASTEWATERCROSSING LOCATION 3
CLONSHAGHWWTP SITE
PROPOSED ABBOTSTOWNPUMPING STATION
PROPOSED ACCESSROAD
PROPOSED NORTH FRINGESEWER DIVERSION
PROPOSEDEGRESS ROAD
NE
E
SE
S
SW
W
NW
N
DECLAN CUNNINGHAM 2004
Client:
Project:
Title:
Scale @ A1:
Prepared by: Checked:
Project Director:
Drawing No.:
Revision:
Rev Date Description By Chkd.
Drawing Status:
Date:
LOCATION OF CROSSING POINTSORBITAL SEWERS/OUTFALL PIPELINE & WASTEWATER
- Sheet 1 of 2 -
1:40,000
A. O'Callaghan D. Conneran May 2016
C. O'Keefe
REPORT
Drawing No. 18 D
A 23.05.16 ISSUED FOR REPORT AOC DC
B 28.08.17 ISSUED FOR REPORT AOC DC
C 18.12.17 ISSUED FOR REPORT AOC JF
D 04.05.18 ISSUED FOR REPORT AOC BD
9B SEWER
9C TRUNK SEWER
NORTH DUBLIN TRUNKSEWERS
SUBMARINE PIPELINE
RINGSEND WWTP
Ordnance Survey Ireland License No EN 0016018 ©Ordnance Survey Ireland/Government of Ireland
N O T E S :
1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THISDRAWING.
2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTORON SITE
3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOROF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES
4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGHCHECK FOR THE ACTUAL LOCATION, DIAMETER ANDINVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE ANDBELOW GROUND, BEFORE ANY WORK COMMENCES
5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD
Galway Dublin
PROPOSEDPROJECTLOCATION
LEGEND:
PROPOSED ORBITALSEWER ROUTE(GRAVITY)
PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)
PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)
PROPOSED WWTP/PS
PROPOSED ORBITALSEWER ROUTE(RISING MAIN)
North Dublin
Ordnance Survey Ireland License No EN 0016018 ©Ordnance Survey Ireland/Government of Ireland
CROSSING LOCATION 1SCALE : 1:5,000
CROSSING LOCATION 2SCALE : 1:5,000
CROSSING LOCATION 3SCALE : 1:5,000
Point 1
Point 2 Point 3
Client:
Project:
Title:
Scale @ A1:
Prepared by: Checked:
Project Director:
Drawing No.:
Revision:
Rev Date Description By Chkd.
Drawing Status:
Date:
LOCATION OF CROSSING POINTSORBITAL SEWER/OUTFALL PIPELINE & WASTEWATER
- Sheet 2 of 2 -
AS SHOWN
A. O'Callaghan D. Conneran May 2016
C. O'Keefe
REPORT
Drawing No. 19 D
A 23.05.16 ISSUED FOR REPORT AOC DC
B 28.08.17 ISSUED FOR REPORT AOC DC
C 18.12.17 ISSUED FOR REPORT AOC JF
D 04.05.18 ISSUED FOR REPORT AOC BD
LEGEND:
PROPOSED ORBITALSEWER ROUTE(GRAVITY)
PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)
PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)
PROPOSED WWTP/PS
PROPOSED ORBITALSEWER ROUTE(RISING MAIN)
WASTEWATERCOLLECTION NETWORK
N O T E S :
1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THISDRAWING.
2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTORON SITE
3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOROF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES
4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGHCHECK FOR THE ACTUAL LOCATION, DIAMETER ANDINVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE ANDBELOW GROUND, BEFORE ANY WORK COMMENCES
5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD
Ordnance Survey Ireland License No EN 0016018 ©Ordnance Survey Ireland/Government of Ireland
NE
E
SE
S
SW
W
NW
N
DECLAN CUNNINGHAM 2004
Client:
Project:
Title:
Scale @ A1:
Prepared by: Checked:
Project Director:
Drawing No.:
Revision:
Rev Date Description By Chkd.
Drawing Status:
Date:
LOCATION OF CROSSING POINTSORBITAL SEWER/OUTFALL
PIPELINE & WATERCOURSES- Sheet 1 of 2 -
1:25,000
A. O'Callaghan D. Conneran May 2016
C. O'Keefe
REPORT
Drawing No. 20 E
A 23.05.16 ISSUED FOR REPORT AOC DC
B 28.08.17 ISSUED FOR REPORT AOC DC
C 18.12.17 ISSUED FOR REPORT AOC JF
D 04.05.18 ISSUED FOR REVIEW AOC BD
WATERCOURSE CROSSINGLOCATION 2
(UN-NAMED WATERCOURSE)
WATERCOURSE CROSSINGLOCATION 3
(MAYNE RIVER)
WATERCOURSE CROSSINGLOCATION 4
(CUCKOO STREAM)
WATERCOURSE CROSSINGLOCATION 5
(MAYNE RIVER)
PROPOSED ABBOTSTOWNPUMPING STATION
PROPOSED ACCESSROAD
PROPOSED NORTH FRINGESEWER DIVERSION
PROPOSEDEGRESS ROAD
WATERCOURSE CROSSINGLOCATION 1
(UN-NAMED WATERCOURSE)
Galway Dublin
PROPOSEDPROJECTLOCATION
LEGEND:
PROPOSED ORBITALSEWER ROUTE(GRAVITY)
PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)
PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)
PROPOSED WWTP/PS
PROPOSED ORBITALSEWER ROUTE(RISING MAIN)
WATERCOURSE
N O T E S :
1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THISDRAWING.
2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTORON SITE
3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOROF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES
4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGHCHECK FOR THE ACTUAL LOCATION, DIAMETER ANDINVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE ANDBELOW GROUND, BEFORE ANY WORK COMMENCES
5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD
E 07.06.18 ISSUED FOR REVIEW AOC BD
0+0000+050
0+100
0+150
0+200
0+250
0+300
0+350
0+400
0+450
0+500
0+550
0+6000+600
Ordnance Survey Ireland License No EN 0016018 ©Ordnance Survey Ireland/Government of Ireland
CROSSING LOCATION 1 CROSSING LOCATIONS 2 & 3
CROSSING LOCATION 4 & 5SCALE : 1:5,000
Point 2
SCALE : 1:5,000 SCALE : 1:5,000
Client:
Project:
Title:
Scale @ A1:
Prepared by: Checked:
Project Director:
Drawing No.:
Revision:
Rev Date Description By Chkd.
Drawing Status:
Date:
LOCATION OF CROSSING POINTSORBITAL SEWER/OUTFALL
PIPELINE & WATERCOURSES- Sheet 2 of 2 -
AS SHOWN
A. O'Callaghan D. Conneran May 2016
C. O'Keefe
REPORT
Drawing No. 21 E
A 23.05.16 ISSUED FOR REPORT AOC DC
B 28.08.17 ISSUED FOR REPORT AOC DC
C 18.12.17 ISSUED FOR REPORT AOC JF
D 04.05.18 ISSUED FOR REPORT AOC BD
KEYPLAN
Point 3
LEGEND:
PROPOSED ORBITALSEWER ROUTE(GRAVITY)
PROPOSED OUTFALLPIPELINE ROUTE (LANDBASED SECTION)
PROPOSED OUTFALLPIPELINE ROUTE(MARINE SECTION)
PROPOSED WWTP/PS
PROPOSED ORBITALSEWER ROUTE(RISING MAIN)
WATERCOURSE
N O T E S :
1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THISDRAWING.
2. ALL DRAWINGS TO BE CHECKED BY THE CONTRACTORON SITE
3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS APPROPRIATE, TO BE INFORMED BY THE CONTRACTOROF ANY DISCREPANCIES BEFORE ANY WORK COMMENCES
4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGHCHECK FOR THE ACTUAL LOCATION, DIAMETER ANDINVERT LEVEL OF ALL SERVICES/UTILITIES, ABOVE ANDBELOW GROUND, BEFORE ANY WORK COMMENCES
5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY DATUM AT MALIN HEAD
Point 1
Point 4
Point 5
E 07.06.18 ISSUED FOR REVIEW AOC BD