NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
NUOL Intranet Project
Final Presentation
Team 5E-mail: [email protected]://csd.ssvl.kth.se/~csd2004-team5
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
Agenda
• Introduction
• Goals
• Working Methodology
• Results
• Future plan
• Summary + Video
• Questions
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
Introduction
Team members:
• Khamphanh Sithavong, NUOL, Laos
• Virasack Rajpho, NUOL, Laos
• Manivone Dokdouangnary, NUOL, Laos
• Sahar Moosavi, KTH, Sweden
• Rafic Dalle, KTH, Sweden
´
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
Introduction
• Cooperation between NUOL and KTH
• Sponsored by Sida
• Part of a 2-year ICT-development plan for NUOL
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
2 – year goalBuild computer rooms with LANs at 15 faculties, to enable students and staff to use computers and Internet for educational purposes.
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
• Build computer room with LAN in 5 faculties- 15-20 computers- 1 DHCP- 1 print server- 1 network printer
• Software for the computers:- Linux RedHat 8- Lao fonts
Main goal
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
Sub goal
• Train 2 administrators from each faculty- To have sufficient knowledge for maintaining the computer rooms
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
Two main phases
• Sweden 10 weeks – theoretical part- Preparing for the implementation
• Laos 6 weeks– practical part- The actual implementation
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
Sweden phase
• Training- Links and LANs- DHCP- User manuals
• Research- Print server- Software installation
• Simulation - Similar scenario
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
Laos phase
• Prepare the computer room- Cable installation
• Install and configure computers- Install Linux and Lao fonts
- Configure DHCP and Print server
• Train local administrators
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
Requirements for the computer rooms
• Room requirements
-Power supply (power sockets and APS for power backup)
-Cooling
-Security locks and fence
When all the requirements were met the team started with the installation
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
Installation
• The first step of the installation was to draw all UTP cable.For safety reason all the cables in the computer room where run through wire ways.
• The Second step was to install socket into both end of the UTP cables.
• Third step was to install the hardware (workstation, server and printer) in there final position.
• Step four was to load all software and configure the servers and computers
• And the last Step was the final test. -Check that the hardware was working properly-Verify that all the clients had Lao font and the operating system Red hat working properly. -Try to print from the client machine-Make sure that all the client can access the internet
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
• 13 computers
• 1 DHCP & Printer server
• 1 network printer
• UTP cables (wire ways )
• Software: Red hat 8 and Lao font
• Internet connection
Faculty of Letters
24 port
NAT
DHCP & Printer server
Network Printer
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
• 14 computers• 1DHCP and printer server• 1 Network printer• UTP cables (wire ways), outdoor cable• Software: Red Hat 8 and Lao font• Internet connection
School of Foundation studiesDHCP and
Printer server
24 port
NAT
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
• 15 computers• 1DHCP and printer server• 1 Network printer• UTP cables (wire ways), outdoor cable• Software: Red Hat 8 and Lao font• Internet connection
Faculty of Law
24 port
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
• 15 computers• 1DHCP and printer server• 1 Network printer• UTP cables (wire ways)• Software: Red Hat 8 and Lao font• Not installed yet: 24 port switch
DHCP & printer server
NATFaculty of Education
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
Faculty of Irrigation
• UTP cables (wire ways) and outdoor cable
• 4 computersNot installed yet: - DHCP and Printer server - Network printer-11 computers-24 port switch
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
Training
• Links and LANs
• DHCP
• All training documents were translated into the Lao language
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
Problems
• Hardware-Long delay-Faulty hardware
• Samba server
• Software -License problem
• Different hardware
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
Future Plan
• Training
• Software
• Computer
• Power cut
• Financial situation
• Maintenance of the computer rooms
• Network plan
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
Follow up
• ITCenter
• 3 administrators
• 10 faculties
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
I would like to thanks all the team member for
their high contribution and the hard work they have
provide making this project a success.
And hopefully all our recommendation will be
implemented so in the future no problems will be
faced during future activities.
Conclusion
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
Summary• Main goals
• 6 weeks in Vientiane
• 4 of 5 computer rooms
• Hardware delay
• Administrators (ITCenter)
• More computers
• Training
NUOL Campus Intranet (Team 5) Final presentation 2004-05-24
Questions?