6
NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED FN INDUSTRIAL FUEL FABRICATION PLANT (Bosco Marengo - AL) EUREX PILOT REPROCESSING PLANT (ENEA - Saluggia Center) ITREC PILOT REPROCESSING AND REFABRICATION PLANT (ENEA - Trisaia Center) PLUTONIUN PILOT FUEL FABRICATION PLANT OPEC POST IRRADIATION EXAMINATION FACILITY (ENEA -Casaccia Center)

Transcript of NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED NUCLEAR FUEL CYCLE PLANTS OF ENEA AND...

Page 1: NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED FN INDUSTRIAL FUEL FABRICATION.

NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FNTO BE DECOMMISSIONED

NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FNTO BE DECOMMISSIONED

FN INDUSTRIAL FUEL FABRICATION PLANT(Bosco Marengo - AL)

FN INDUSTRIAL FUEL FABRICATION PLANT(Bosco Marengo - AL)

EUREX PILOT REPROCESSING PLANT(ENEA - Saluggia Center)

EUREX PILOT REPROCESSING PLANT(ENEA - Saluggia Center)

ITRECPILOT REPROCESSINGAND REFABRICATION PLANT(ENEA - Trisaia Center)

ITRECPILOT REPROCESSINGAND REFABRICATION PLANT(ENEA - Trisaia Center)

•PLUTONIUN PILOT FUEL FABRICATION PLANT•OPEC POST IRRADIATION EXAMINATION FACILITY

(ENEA -Casaccia Center)

•PLUTONIUN PILOT FUEL FABRICATION PLANT•OPEC POST IRRADIATION EXAMINATION FACILITY

(ENEA -Casaccia Center)

Page 2: NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED FN INDUSTRIAL FUEL FABRICATION.

ITREC: pilot reprocessing and refabrication plant (U-Th fuel cycle)

(ENEA - Trisaia Centre)

ITREC: pilot reprocessing and refabrication plant (U-Th fuel cycle)

(ENEA - Trisaia Centre)

Main past activities:• 1975 -1978: reprocessing of Elk River

spent fuel (U-Th) • 1983 -1990: development and testing

of centrifugal contactors• 1995 - 2000: solidification of liquid

radioactive waste

Main past activities:• 1975 -1978: reprocessing of Elk River

spent fuel (U-Th) • 1983 -1990: development and testing

of centrifugal contactors• 1995 - 2000: solidification of liquid

radioactive waste

Main decommissioning milestones:(Ministry of Industry strategic guidelines)

• within 2010: management of all radioactivewaste produced during the past activities

• within 2016: decontamination and dismantlingof the plant, management of the resultingmaterial, free release of the site

Main decommissioning milestones:(Ministry of Industry strategic guidelines)

• within 2010: management of all radioactivewaste produced during the past activities

• within 2016: decontamination and dismantlingof the plant, management of the resultingmaterial, free release of the site

Main decommissioning issues:• solidification of U-Th highly radioactive solution (reprocessing “final

product”)• dry storage of residual spent fuel in dual purpose casks• decontamination and dismantling of equipment and hot cells

Main decommissioning issues:• solidification of U-Th highly radioactive solution (reprocessing “final

product”)• dry storage of residual spent fuel in dual purpose casks• decontamination and dismantling of equipment and hot cells

Page 3: NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED FN INDUSTRIAL FUEL FABRICATION.

OPEC : post irradiation examination facility

(ENEA - Casaccia Centre)

OPEC : post irradiation examination facility

(ENEA - Casaccia Centre)

Main past activities:• 1962-1990 : post-irradiation examination

of metal uranium and uranium oxide spent fuels (up to 2000 Ci - 74 TBq)

• 1992-1998 : spent fuel scraps encapsulation,hot cells decontamination

Main past activities:• 1962-1990 : post-irradiation examination

of metal uranium and uranium oxide spent fuels (up to 2000 Ci - 74 TBq)

• 1992-1998 : spent fuel scraps encapsulation,hot cells decontamination

Main decommissioning milestones:(Ministry of Industry strategic guidelines)

• within 2010 : safe management of all radioactivewaste and nuclear material produced during the past activities

• within 2016 : decontamination and dismantlingof the plant, safe management of the resulting material, free release of the site

Main decommissioning milestones:(Ministry of Industry strategic guidelines)

• within 2010 : safe management of all radioactivewaste and nuclear material produced during the past activities

• within 2016 : decontamination and dismantlingof the plant, safe management of the resulting material, free release of the site

Main decommissioning issues:• removal of spent fuel scraps• management of residual radioactive waste

• final decontamination and dismantling

Main decommissioning issues:• removal of spent fuel scraps• management of residual radioactive waste

• final decontamination and dismantling

Page 4: NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED FN INDUSTRIAL FUEL FABRICATION.

PLUTONIUM: pilot fuel fabrication plant

(ENEA - Casaccia Centre)

PLUTONIUM: pilot fuel fabrication plant

(ENEA - Casaccia Centre)

Main decommissioning milestones:(Ministry of Industry strategic guidelines)

• within 2010 : management of all radioactive waste and nuclear material produced during the past activities

• within 2016 : decontamination and dismantling of the plant, safe management of the resulting material, free release of the site

Main decommissioning milestones:(Ministry of Industry strategic guidelines)

• within 2010 : management of all radioactive waste and nuclear material produced during the past activities

• within 2016 : decontamination and dismantling of the plant, safe management of the resulting material, free release of the site

Main decommissioning issues:• removal of residual nuclear material• decontamination and dismantling of glove-boxes• management of residual radioactive waste

Main decommissioning issues:• removal of residual nuclear material• decontamination and dismantling of glove-boxes• management of residual radioactive waste

Main past activities:• 1968-1974: process development (sol-gel)

1977-1980: fuel fabrication for AECL Chalk River reactor

• 1990-1996: liquid radioactive waste management

Main past activities:• 1968-1974: process development (sol-gel)

1977-1980: fuel fabrication for AECL Chalk River reactor

• 1990-1996: liquid radioactive waste management

Page 5: NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED FN INDUSTRIAL FUEL FABRICATION.

EUREX: pilot reprocessing plant

(ENEA - Saluggia Centre)

EUREX: pilot reprocessing plant

(ENEA - Saluggia Centre)

Main past activities:• 1970-1975 : MTR (HEU) spent fuel reprocessing• 1980-1983 : CANDU spent fuel reprocessing • 1988-1991 : Pu nitrate-oxide conversion

(via sol-gel)

Main past activities:• 1970-1975 : MTR (HEU) spent fuel reprocessing• 1980-1983 : CANDU spent fuel reprocessing • 1988-1991 : Pu nitrate-oxide conversion

(via sol-gel)

Main decommissioning milestones:(Ministry of Industry strategic guidelines)

• within 2010 : safe management of all radioactive wasteproduced during the past activities

• within 2016 : decontamination and dismantling of theplant, safe management of the resulting material, free release of the site

Main decommissioning milestones:(Ministry of Industry strategic guidelines)

• within 2010 : safe management of all radioactive wasteproduced during the past activities

• within 2016 : decontamination and dismantling of theplant, safe management of the resulting material, free release of the site

Main decommissioning issues:• solidification of all liquid radioactive waste• dry storage of residual spent fuel in dual purpose casks • decontamination and dismantling of equipment and hot cells

Main decommissioning issues:• solidification of all liquid radioactive waste• dry storage of residual spent fuel in dual purpose casks • decontamination and dismantling of equipment and hot cells

Page 6: NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED FN INDUSTRIAL FUEL FABRICATION.

FN: industrial fuel fabrication plant

(ENEA - Bosco Marengo)

FN: industrial fuel fabrication plant

(ENEA - Bosco Marengo)

Main past activities:• 1973-1995 : fabrication of fuel assemblies for

Italian and foreign LWR • 1996-2001 : preparatory works

for decommissioning

Main past activities:• 1973-1995 : fabrication of fuel assemblies for

Italian and foreign LWR • 1996-2001 : preparatory works

for decommissioning

Main decommissioning milestones:(Ministry of Industry strategic guidelines)

• within 2004 : decontamination and dismantling of equipment, safe management of theresulting material

• within 2011 : controlled temporary storage "in situ" of radioactive waste, transfer to the nationalrepository, free release of the site

Main decommissioning milestones:(Ministry of Industry strategic guidelines)

• within 2004 : decontamination and dismantling of equipment, safe management of theresulting material

• within 2011 : controlled temporary storage "in situ" of radioactive waste, transfer to the nationalrepository, free release of the site

Main decommissioning issues:• residual nuclear material removal• decontamination and dismantling of equipment and buildings

Main decommissioning issues:• residual nuclear material removal• decontamination and dismantling of equipment and buildings