NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

49
NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant

Transcript of NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Page 1: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

NUCLEAR ENGINEERING OPPORTUNITIES

Diablo Canyon Nuclear Power Plant

Page 2: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

James T. (Tom) Voss, NRRPT, CHP

Fellow of the Health Physics Society

PO Box 1362

Los Alamos, NM 87544

[email protected]

505-920-1470

WWW.VOSS-ASSOCIATES.COM

Page 3: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Where are the Opportunitiesin Nuclear Engineering

• Current Nuclear Power Reactors• Current Research and Test Reactors• New Nuclear Power Reactors• Applications for License Renewals• Applications Currently Under Review• Small Transportable Nuclear Reactors• Resurgence in Uranium Mining

Page 4: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Where are the Opportunitiesin Nuclear Engineering

• Uranium Fuel Fabrication• Thorium as a Reactor Fuel• Nuclear Fuel Reprocessing• Need for Remote Real-time Monitoring of

Nuclear Facilities and Nuclear Materials Transport Vehicles• Training

Page 5: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Current Nuclear Power Reactors

Page 6: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Current Research and Test Reactors

Page 7: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

New Nuclear Power Reactors

Page 11: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Applications Currently Under Review

Pilgrim 1, Unit 1Vermont YankeeIndian Point, Units 2 and 3Prairie Island, Units 1 and 2Kewaunee Power StationCooper Nuclear StationDuane Arnold Energy Center

Page 12: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Applications Currently Under Review

Palo Verde, Units 1, 2, and 3Crystal River, Unit 3Hope CreekSalem, Units 1 and 2Diablo Canyon, Units 1 and 2Columbia Generating Station

19 APPLICATIONS FOR LICENSE RENEWAL ARE UNDER REVIEW

Page 13: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Security Requirements for

Nuclear Research and Test Reactors • Security• All research and test reactors are designed and

operated so that material is not easily handled or dispersed, thus protecting against potential radiological exposure or theft of material. These reactors have a limited amount of radioactive material on site and therefore pose a low risk from radiation and the theft of nuclear material. The NRC inspects the reactor’s security and emergency plans, as well as its operations and design to ensure protection of public health and safety.

Page 14: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

• Security requirements are based on a graded approach with increasing requirements for material that is more attractive for theft or diversion and for facilities that have larger inventories of radiological material.

• Prior to September 11, 2001, all reactors had security plans or procedures and emergency plans as required by NRC regulations. Following the terrorist attacks on 9/11, the NRC advised licensees to consider taking additional security measures. Later NRC imposed additional security measures on research and test reactors by Confirmatory Action Letter.

Page 15: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

While the specifics of these measures are not publicly available for security reasons, in general, they include:

• enhancements in screening of personnel; • systems for controlling access to the facility;• observation of activities within the facilities;• alarms or other devices to detect unauthorized

presence;• operability of communication systems;• vehicle and package searches; and • heightened coordination with appropriate local,

State, and Federal resources liaisons with the FAA and law enforcement authorities to report unusual overflights or potential threats.

Page 16: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Small Transportable Nuclear Power Reactors

Page 17: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

What is in the future for these power reactors ?

It seem unlikely the NRC will grant operating licenses for these types of nuclear power reactors.

It seems unlikely the final cost for these types of nuclear power reactors could equal that of the new commercial nuclear power reactors.

Small Transportable Nuclear Power Reactors

Page 18: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Resurgence in Uranium Mining

Page 19: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

World Uranium Production

Tons of Uranium2007 2008

Canada 9476 9000Kazakhstan 6637 8521Australia 8611 8430Namibia 2879 4366Russia 3413 3521Niger 3153 3032Uzbekistan 2320 2338USA 1654 1430             World total 41,282 43,853

Page 20: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

United States Uranium Production

Tons of Uranium

2007 2008 USA 1654 1430             World total 41,282 43,853

US Uranium Current Production is PrimarilyFrom 4 Mines.

90% of US Uranium Mining is In-Situ.

Page 21: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Uranium Mines in Canada

Page 22: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Uranium Mines in Australia

Page 23: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Worker, Public, and Environmental Protection for Uranium Mining

• Controlled Ventilation

• Radon and Airborne Uranium Monitoring

• Portable and Personal Continuous Air Monitors

• In-Situ Mining

• Open Pit Mining

Page 24: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Worker Protection for Uranium Mining

Controlled Ventilation

• Air volume turnover rates should be > 7 per hour

• Ventilation velocities should be < 0.1 m/sec

• But, underground temperatures might call for a higher ventilation rate to keep the miners cool

Page 25: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Worker Protection for Uranium Mining

Radon and Airborne Uranium Monitoring

• Routine area radon and uranium monitoring with sophisticated instruments

• Radon monitoring before opening a new area to workers

• Personal radon and uranium monitors for workers

Page 26: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Worker Protection for Uranium Mining

Radon and Airborne Uranium Monitoring

WWW.BLADEWERX.COM

Page 27: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Public and Environmental Protectionfor Uranium Mining

Airborne Uranium Continuous Air Monitors

WWW.BLADEWERX.COM

Page 28: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Public and Environmental Protectionfor Uranium Mining

In-Situ Mining

In-Situ mining leaches the uranium ore from the underground deposit and greatly reduces the volume of above ground waste.

Page 29: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Public and Environmental Protectionfor Uranium Mining

Open Pit Mining

• Reduces the risk to the workers by providing better ventilation and reduces other risks in underground mining

• Exposes more rock dust and uranium ore that could increase the spread of those into the environment

• Australia’s Olympic Dam mine is converting to an open pit operation

Page 30: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Public and Environmental Protectionfor Uranium Mining

Closing and covering an open pit mine at the end of its useful life could provide the best permanent solution for protecting the public and the environment.

In-Situ mining could also minimize the mine’s affect on the public and the environment.

Page 31: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Uranium Fuel Cycle Facilities

Page 32: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Uranium Fuel Cycle Facilities

• Better Ventilation

• Radiation Monitoring

• Airborne Radioactivity Monitoring

• Criticality Monitoring

Page 33: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Uranium Fuel Cycle Facilities

Uranium Hexafluoride Production Honeywell International, Inc. Metropolis, IL

Page 34: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Uranium Fuel Cycle Facilities

Gas Centrifuge Uranium Enrichment

Areva Enrichment Services Idaho Falls, ID(under review)

Louisiana Energy Services Eunice, NM(in construction)

U.S. Enrichment Corporation Piketon, OH(in construction)

Page 35: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Uranium Fuel Cycle Facilities

Gaseous Diffusion Uranium Enrichment

U.S. Enrichment Corporation Paducah, KY

U.S. Enrichment Corporation Piketon, OH (cold standby)

Page 36: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Uranium Fuel Cycle Facilities

Laser Separation Uranium Enrichment

GE-Hitachi Wilmington, NC (under review)

Page 37: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Uranium Fuel Cycle Facilities Uranium Fuel Fabrication

AREVA NP, Inc. Lynchburg, VA

AREVA NP, Inc. Richland, WA

B&W Nuclear Operations Group Lynchburg, VA

Global Nuclear Fuel-Americas, LLC Wilmington, NC

Nuclear Fuel Services Erwin, TN (license renewal application submitted)

Westinghouse Electric Company, LLC Columbia, SC

Page 38: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Uranium Fuel Cycle Facilities

Mixed-Oxide Fuel Fabrication

Shaw AREVA MOX Services , LLC Aiken, SC (in construction/under licensing review)

Page 39: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Nuclear Fuel Reprocessing

• Better Ventilation

• Radiation Monitoring

• Airborne Radioactivity Monitoring

• Criticality Monitoring

Page 40: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Benefits of Nuclear Fuel Reprocessing

• Separation of LLW and High Level Wastes

• Reduction of High Level Wastes by Recycling

• Production of Useable Isotopes for RTGs, Gamma Irradiators, Gauges, Etc.

• Reduction of LLW

Page 41: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Thorium as a Nuclear FuelWorld Supplies in Tons

Australia 340,000 India 300,000 United States 300,000 Norway 180,000 Canada 100,000 South Africa 39,000 Brazil 18,000 Malaysia 4,500 Other Countries 100,000World Total 1,400,000

Page 42: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Benefits of Thorium as a Nuclear Fuel

• Greater Abundance than Uranium

• Production of Thorium Fuel Does Not Require Isotopic Separation

• Use of Thorium Fuel Produces Much Less Long-Lived Transuranics Than Uranium Fuel

Page 43: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Need For Remote Real-Time Radiological Monitoring of Nuclear Facilities and Nuclear

Transport Vehicles

• Notification of an Unplanned Release

• Identification and Quantification of Unplanned Releases

• Tracking of Unplanned Releases to the Environment

• Prediction of the Path of Unplanned Releases

Page 44: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Some Unplanned Releases from Nuclear Facilities

Three Mile Island - 1979Contributing Factors

• Facility Design

• Equipment Malfunction

• Operator Training

Page 45: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Some Unplanned Releases from Nuclear Facilities

Chernobyl - 1986Contributing Factors

• Facility Design

• Equipment Malfunction

• Operator Training

Page 46: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Some Unplanned Releases from Nuclear Facilities

Japan, Tokaimura - 1999Contributing Factors

• Facility Design

• Operator Training

Page 47: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

Some Unplanned Releases from Nuclear Facilities

Practices to Prevent and/orMitigate the Consequences

• Better Facility Designs

• Better Equipment Designs

• Better Operator Training

• Better Radiological Monitoring Inside and Outside the Facilities

Page 48: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

References

American Nuclear Society www.ans.orgHealth Physics Society www.hps.orgInstitute of Nuclear Power Operations

www.inpo.infoNuclear Energy Institute www.nei.org Nuclear Engineering International

www.neimagazine.comUS Department Of Energy www.doe.govUS Nuclear Regulatory Commission

www.nrc.org

Page 49: NUCLEAR ENGINEERING OPPORTUNITIES Diablo Canyon Nuclear Power Plant.

References

Areva www.areva.comBabcock and Wilcox www.babcock.comCanberra www.canberra.comGeneral Electric www.gepower.com/nuclear/Nuke Worker www.nukeworker.comUS Navy www.navy.comWestinghouse www.westinghousenuclear.com