April 14, 2015 Longmeadow Parkway Fox River Bridge Corridor.
NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional...
-
Upload
blake-houston -
Category
Documents
-
view
219 -
download
0
Transcript of NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional...
![Page 1: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/1.jpg)
NTTA’s Trinity Parkway:Corridor to Dallas’ Future
Presenter : John Quintero Professional Associate
![Page 2: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/2.jpg)
Trinity Parkway Toll Road
![Page 3: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/3.jpg)
The Trinity Parkway Project
• Nine mile, 4 - 6 lane toll road bypassing downtown Dallas• Estimated use: 94,000 vehicles daily (2015)
• Located inside the Trinity River levees • Anticipated opening date 2014• Estimated capital cost : $ 1.1 to 2.1 billion (2007)
![Page 4: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/4.jpg)
Trinity River CorridorDowntown OverlookDowntown OverlookAmphitheaterAmphitheaterWest Dallas LakeWest Dallas Lake
![Page 5: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/5.jpg)
NTTA’s Trinity Parkway Animation
![Page 6: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/6.jpg)
Trinity Parkway Project History
1967 - Regional Transportation Study indentified “River Freeway”1986 - “Mobility 2000” plan recommended Trinity Parkway1998 - NTTA assigned development of Trinity Parkway 2004 - USDOT selected Trinity Parkway as a “Priority” Project2005 - City of Dallas & NTTA recommended Parkway alignment2009 - Completed 30% Design and submitted Section 408 to USACE
![Page 7: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/7.jpg)
Benefits of Trinity Parkway
• Mobility Benefits– Unlocks Downtown congestion nightmare – Allows reconstruction of Existing Canyon/Mixmaster – Reduces congestion cost by $66 million / year– Saves 4.2 million vehicle hours / year
• Social & Environmental Benefits– Supports the City of Dallas’ Balanced Vision Plan (Trinity Master Plan)– Reduces emissions by 84 tons / year (10% reduction)
![Page 8: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/8.jpg)
Dallas Canyon/Mix Master
Top 10 “Most Notorious Traffic Bottlenecks”
![Page 9: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/9.jpg)
2009 Projected Cost of Traffic Congestion
Cost of Traffic Congestion in 2009 = $4.5 BillionCost of Traffic Congestion in 2009 = $4.5 Billion
![Page 10: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/10.jpg)
Corridors Impacted by Trinity Parkway
Trinity Parkway
![Page 11: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/11.jpg)
Questions & Answers on Trinity Parkway
![Page 12: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/12.jpg)
HDR’s Trinity Parkway Design Team
• HDR, Inc.– 35 Team members located in 4 offices
• Civil Associates, Inc.– 10 Team members
• Halff Associates, Inc.– 16 Team members
• Hayden Consultants, Inc. – 7 Team members
• TEDSI Infrastructure Group, Inc. – 10 Team members
78 Team members located in 8 different offices 78 Team members located in 8 different offices
![Page 13: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/13.jpg)
HDR’s Design Team Segment : Section I
• Four Level Interchange at IH 35E / SH 183• Two miles of new Roadway & Bridges • Four Direct Connectors• Reconstruction of Existing Cross-Street Underpasses• Estimated Capital Cost : $ 360 million
![Page 14: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/14.jpg)
Trinity Parkway Section I Bridge Deck Area
= 2 ½ Golden Gate Bridges= 2 ½ Golden Gate Bridges46 acres of Bridge Deck
![Page 15: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/15.jpg)
Collaboration Challenges
• Aggressive Schedule – Four Month Design Schedule– 30 % Design Submittal to USACE
• Technical Challenges– Integrating a Project Team by means of Virtual Office – Connecting and supporting Project Team
• Human Element– User reluctance to work in a collaborative environment– Failure to see “Team vision” due to “cubicle mentality”
![Page 16: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/16.jpg)
KEYS TO SUCCESSFUL COLLABORATION
• Project Management • Virtual Office • Design Applications• Work Flow
![Page 17: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/17.jpg)
Project Management
• Project Managers & Task Leaders– Understanding of “Collaborative Environment”– Mentoring Teaming Partners
• Project Documentation– Project Guide describing Team members’ specific roles– CAD Guide addressing design and drawing workflow
• Project Communication– Establish communication at every level of Management– Communicate design changes effectively
![Page 18: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/18.jpg)
Mentoring Program • Hayden Consultants, Inc. selected as Protégé Partner
– Mentoring of local DBE firms encourage by NTTA – Given a significant Management & Design role
Deputy Project Manager Roadway & Storm Water Pollution Design
• Mentoring Program – Project Management Training– Design Software Training
ProjectWise MicroStation/GEOPAK
![Page 19: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/19.jpg)
Results of Successful Mentoring & Training
“This is a software tool (ProjectWise) that our firm would not have had the opportunity to use had it not been for the relationship with HDR. The HDR staff not only trained our engineers in the use of ProjectWise, but they provided detailed training in aspects of MicroStation/GEOPAK that we had not been exposed to before.”
Rachel Hayden Hayden Consultants,
Inc.
![Page 20: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/20.jpg)
Questions & Answers on Project Management
![Page 21: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/21.jpg)
KEYS TO SUCCESSFUL COLLABORATION
• Project Management
• Virtual Office • Design Applications• Work Flow
![Page 22: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/22.jpg)
Creating the Virtual Project Office
• Document Management System – ProjectWise used as our Document Management System– HDR provided on-site ProjectWise installation and training
–ALL Project files maintained in ProjectWise
8,500 Project Files = 16 GB information8,500 Project Files = 16 GB information
![Page 23: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/23.jpg)
How ProjectWise supports the Virtual Office
• Facilitated collaboration among team members • Allowed distribution of real time information • Provided controlled access to project files • Enabled teams to leverage office resources
• Reduced cost of traveling associated with single project office
![Page 24: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/24.jpg)
• Add picture
Benefits on Southwest Parkway Interchange
![Page 25: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/25.jpg)
Connecting & Supporting Virtual Office
• ProjectWise Training & Support– HDR provided on-site PW installation & training– Continued Project support for all team members – Employed dedicated ProjectWise System Engineers and
CAD Application Specialists
• Network Infrastructure– Increased network capacity, speed and connectivity– Implemented WAN acceleration appliances at key locations– Encouraged teaming partners to improve their local networks
![Page 26: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/26.jpg)
Questions & Answers on Virtual Office
![Page 27: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/27.jpg)
KEYS TO SUCCESSFUL COLLABORATION
• Project Management • Virtual Office
• Design Applications • WORK FLOW
![Page 28: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/28.jpg)
Design Applications
• Engineering Software Applications– Internal to ProjectWise
Single data/output file programs
– External to ProjectWise Multiple data/output file programs
• CAD Applications– Software Configuration & Integration
MicroStation GEOPAK
![Page 29: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/29.jpg)
MicroStation Workspace Configuration
• MicroStation DGNLIB’s – Level Control & Filters – Dimension Styles– Text Styles
• Annotation Scale – Text Styles– Dimension Styles– Cells
![Page 30: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/30.jpg)
MicroStation Workspace Configuration
• Client Specific Workspace – Color Tables – Text & Dimension Styles– Line Styles – Plot Drivers
• Discipline Specific Workspace – Customized User Interfaces– DGN Libraries– Cells Libraries
![Page 31: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/31.jpg)
GEOPAK Configuration
• Client Specific Configuration– Client Standard DDB Files – Client Standard Criteria Files– Client Roadway Design Parameters
• Project Specific Configuration – Project DDB Files– Project specific Criteria Files– Project GPK
![Page 32: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/32.jpg)
GEOPAK Configuration
• Internal ProjectWise Directory Structure – COGO Input Files– COGO Output Files– Criteria Files– GPK (for sharing with Design Team)– Project Tin & Data Files
![Page 33: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/33.jpg)
GEOPAK Configuration
• External ProjectWise Directory Structure – GPK Files (Gate Keeper)– Project Manager Files– Project Manager Database– User Folders
![Page 34: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/34.jpg)
KEYS TO SUCCESSFUL COLLABORATION
• Project Management • Virtual Office • Design Application
• Work Flow
![Page 35: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/35.jpg)
Work Flow
• Project Folder & File Structure– Structure tailored for your Project – Securities which allow access control– Standard Naming Conventions
• Drawing Organization– Base and/or Model Files – Sheet Files– Use of Reference Files– Image Files
![Page 36: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/36.jpg)
Enhancing Work Flow Speed
• Open Files Read Only – One Way download (no need to check back in) – Eliminates the need to refresh Design Team copies– Audit Trail reflects copied out status
• Cad File Maintenance– Eliminate unnecessary Drawing Data– Remove unused models – Compress files thereby reducing file size
![Page 37: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/37.jpg)
Enhancing Work Flow Speed
• Reference Files – Detach unwanted References/Images– Remove all missing References/images– Clip Reference/Images files to fit project limits– Lockdown all Exist and Survey References/Images– Place Raster Images on Local Network not in PW
![Page 38: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/38.jpg)
Models in Your Work Flow
• Models– Not to be confused with AutoCAD Paper/Model Space – Allows the user to set the following
Annotation Scale for Text, Dimensions, and Cells Linestyle Scale for custom linestyles Level Symbology for Reference files Sequencing of Reference attachments
– Simplifies attachment of Reference files to Sheet files– Controls Level Display at one source – Can create multiple models in a Reference File
![Page 39: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/39.jpg)
Models Contained in Base Reference File
![Page 40: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/40.jpg)
References attached to Model
![Page 41: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/41.jpg)
Attaching Models to a Sheet File Reference Attachment Dialog Box
Set Live Nesting to 1
Reference Attachment Dialog Box
Set Live Nesting to 1
Reference Dialog Box showing Nested Reference filesReference Dialog Box showing Nested Reference files
![Page 42: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/42.jpg)
Final Questions & Answers
![Page 43: NTTA’s Trinity Parkway: Corridor to Dallas’ Future Presenter : John Quintero Professional Associate.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d005503460f949d1f5f/html5/thumbnails/43.jpg)
NTTA’s Trinity Parkway:Corridor to Dallas’ Future
Thank You for your Attendance & Participation