NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have...
Transcript of NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have...
![Page 1: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/1.jpg)
NSS Special AccessDesign and installation of the world’s most innovative special
access scaffolding systems
![Page 2: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/2.jpg)
Unique capability in special access and protections systems in live environments.
z NSS has 50 years’ experience in innovation special access scaffolding systems.
z CEO, Colin Butt, founded the NSG group of access companies in 1971 which became the 5th largest scaffolding company in the UK.
z NSS has international clients in construction and civil engineering, military, power generation, aviation, railways, bridges, heritage, sports stadia and retail.
2
![Page 3: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/3.jpg)
NSS systems have addressed the world’s most challenging access problems
z Virtually eliminates the risk of falling components and loose materials.
z Provides a safe zone beneath the working area. z 10 times faster than conventional tube and fittings. z Most of the work is carried out at ground level prior to
lifting the beams into position. z Our manufacturing ability enables us to modify and add
to equipment very quickly.3
![Page 4: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/4.jpg)
Marina Bay Sands Hotel Skypark, Singapore
Soffit access scaffolding erected 200m above ground.
4
![Page 5: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/5.jpg)
Marina Bay Sands Hotel Skypark, Singapore
2.5m wide cantilevered platform that swivelled round the final radius.
5
![Page 6: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/6.jpg)
Marina Bay Sands Retail Canopy, Singapore
Curved, tracked and stepped access platform, profiled to the glazing surface.
6
![Page 7: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/7.jpg)
Marina Bay Sands Retail Canopy, Singapore
Rig built at ground level and winched into position.
7
![Page 8: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/8.jpg)
Kings Cross Station,London, UK
Travelling, mobile special access system, 96m long with arched 37m span, suspended from the station roof on tracks for roof renovation.
8
![Page 9: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/9.jpg)
Al Sadd Stadium,Doha, UAE
Lightweight, tracked mobile deck for soffit access, erected in just 5 days.
9
![Page 10: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/10.jpg)
Al Sadd Stadium,Doha, UAE
Profiled, non-slip deck.
10
![Page 11: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/11.jpg)
Expo Hall, Dubai, UAE
Tracked, mobile access platforms for reinstallation of essential services after a major fire, erected in 8 days.
11
![Page 12: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/12.jpg)
Mirdiff Mall, Dubai, UAE
Tracked access scaffolding platform at high level for insulation of all services and ceiling soffit.
12
![Page 13: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/13.jpg)
NAS Arena, Dubai, UAE
Mobile access platforms.
13
![Page 14: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/14.jpg)
Chek Lap Kok Airport,Hong Kong, China
Tie-arched, tracked 37m contoured span, for access to soffit panels.
14
![Page 15: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/15.jpg)
Toyota, UK
Platform with ladder access.
15
![Page 16: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/16.jpg)
Millfield School, Street, UK
Modular tracked special access platform for reglazing the roof of Millfield School’s Olympic-size swimming pool.
16
![Page 17: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/17.jpg)
Marylebone Station, London, UK
Crash deck for re-roofing erected in 4 weeks.
17
![Page 18: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/18.jpg)
Marylebone Station, London, UK
Crash deck covered with nonslip waterproof plywood for a clear, safe, and gap-proof platform.
18
![Page 19: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/19.jpg)
Southport Station, UK
Access deck, completed in 20 working nights.
19
![Page 20: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/20.jpg)
Southport Station, UK
20
![Page 21: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/21.jpg)
Aberdeen Station, UK
Temporary, mobile roof, showing under-sheeting and lighting.
21
![Page 22: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/22.jpg)
Aberdeen Station, UK
Rainwater was diverted along sheeting and guttering system to drains.
22
![Page 23: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/23.jpg)
Tsing Ma, China
Mobile tracked suspended aluminium rigs 36m x 15m.
Providing access for 5m gap between sections.
23
![Page 24: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/24.jpg)
Ting Kau, Hong Kong, China
2.5m wide, 27m span travelling platforms.
Cantilevered 10m from the existing tracking to the bridge parapet.
24
![Page 25: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/25.jpg)
Saadiyat Bridge Abu Dhabi, UAE
27m span underslung scaffold deck to give access for concrete finishing of the bridge.
25
![Page 26: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/26.jpg)
Dee Bridge Crossing
Tracked aluminium rig, cantilevered 3m on the underside to carry 700kg testing weight.
26
![Page 27: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/27.jpg)
Metro, Dubai, UAE
Underslung access scaffolding deck for concrete Metro track finishing.
27
![Page 28: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/28.jpg)
Metro, Dubai, UAE
28
![Page 29: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/29.jpg)
Details of main bridge beam components.
29
![Page 30: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/30.jpg)
Using additional end frames and plan diagonal brace frames form a box pair.
Stand a couple of frames up and connect them together with a clip in end frame.
Join the main frames together using spigots and self retaining pins.
u
w
v
30
![Page 31: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/31.jpg)
Extend the box truss to the desired length with additional main frames, spigots, end frames and plan diagonal brace frames.
x
31
![Page 32: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/32.jpg)
Add box trusses to the desired width and correctly space with end frames and plan diagonal brace frames for rigidity.
y
32
![Page 33: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/33.jpg)
Finally add deck panels and edge protection to complete the platform
z
33
![Page 34: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the](https://reader034.fdocuments.in/reader034/viewer/2022052018/6031edf770c6b9657675da82/html5/thumbnails/34.jpg)
NSS Special Access LtdHead office: International House, Aviation Park, Flint Rd, Saltney Ferry, Cheshire CH4 0GZ, United Kingdom
+44 1244 533966Offices in the UK, UAE and Hong Kong
www.nssspecialaccess.com
Mr Colin Butt, [email protected]
+44 7802 277377
Mr Tony Doyle, General [email protected] +44 7976 108155