Transcript of NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.
![Page 1: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/1.jpg)
NSF Program Update
Astronomy and Astrophysics Astronomy and Astrophysics Advisory CommitteeAdvisory Committee
Oct 11, 2005Oct 11, 2005
![Page 2: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/2.jpg)
Status of Decadal Survey Recommendations
Small Initiatives:
–National Virtual Observatory (NVO) - Framework development funded; discussion with NASA planning long-term support through joint solicitation, currently in legal review; Cyber funds in ’06 and beyond?
![Page 3: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/3.jpg)
Status of Decadal Survey RecommendationsUpdate
Moderate Initiatives:
–Advanced Technology Solar Telescope (ATST)
Advanced to “Readiness” at last NSB meeting
–VERITAS -
Awaiting outcome of NEPA and NHPA processes
Construction re-start ~December at earliest
![Page 4: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/4.jpg)
Status of Decadal Survey Recommendations
Major Initiatives:–Atacama Large Millimeter Array (ALMA) – update tomorrow
– Giant Segmented Mirror Telescope (GSMT) – joint technology development program proposal funding in process
– Large Synoptic Survey Telescope (LSST) - $14M development award in place.
![Page 5: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/5.jpg)
Status of Quarks to Cosmos recommendationsUpdate
– CMB Research Task Force – Final report today
– Interagency initiative on Physics of the Universe
![Page 6: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/6.jpg)
Physics of the Universe Interagency PlanUpdate
Highest priority, ready
– LSST
– CMB Research Task Force – Final report this afternoon
– Dark Energy Task Force formed under AAAC and HEPAP
Status report tomorrow
![Page 7: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/7.jpg)
GSMT Planning
National Optical Astronomy Observatory (NOAO) Science Working National Optical Astronomy Observatory (NOAO) Science Working Group has formulated a detailed science caseGroup has formulated a detailed science case. .
Consortium formed to undertake an extensive technology development Consortium formed to undertake an extensive technology development and site characterization effort. and site characterization effort.
Would result in a public-private partnership with private funds Would result in a public-private partnership with private funds supporting approximately 50% of the $70M estimated cost; proposal supporting approximately 50% of the $70M estimated cost; proposal to NSF for the remaining 50%. Public funds would support to NSF for the remaining 50%. Public funds would support community effort in several major groups.community effort in several major groups.
Current estimate is that this effort would take five to seven years.Current estimate is that this effort would take five to seven years. Proposal funding has begun.Proposal funding has begun.
NSF has met with consortium and with individual Boards to discuss NSF has met with consortium and with individual Boards to discuss timing and are continuing a constructive dialoguetiming and are continuing a constructive dialogue
Funds in FY2005 appropriation limited; similar for FY2006; Planned Funds in FY2005 appropriation limited; similar for FY2006; Planned growth awaits outcome of Senior Reviewgrowth awaits outcome of Senior Review
![Page 8: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/8.jpg)
LSST Planning
National Optical Astronomy Observatory (NOAO) Science Working National Optical Astronomy Observatory (NOAO) Science Working Group formulated detailed science case.Group formulated detailed science case.
LSST Corporation established. LSST Corporation established. Pan-STARRS underway in Hawaii with DoD funding. No operations Pan-STARRS underway in Hawaii with DoD funding. No operations
money at all and insufficient resources for software.money at all and insufficient resources for software. NSF provided $1.3M in FY03 for detector development for LSST NSF provided $1.3M in FY03 for detector development for LSST
Camera; NOAO has been funding telescope design at roughly Camera; NOAO has been funding telescope design at roughly $1.7M/year. $1.7M/year.
DOE labs have expressed strong interest in participating in the project DOE labs have expressed strong interest in participating in the project through provision of the camera. DOE science budget a problem?through provision of the camera. DOE science budget a problem?
Technology development program ($14M) underway in FY2005, Technology development program ($14M) underway in FY2005, FY2006 (Physics of the Universe)FY2006 (Physics of the Universe)
![Page 9: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/9.jpg)
The ATSTProject
The Advanced Technology Solar Telescope
![Page 10: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/10.jpg)
Improvements over current state of the art:• Resolution – ~7X improvement• Light grasp – 10X improvement (solar physics is actually photon starved in some experiments)
Technical Specifications:• 4-m, off-axis Gregorian (all reflective), alt-az mount.• Integrated adaptive optics.• Hybrid enclosure with thermal control and dust mitigation.• Wavelength sensitivity from 0.3-28 microns (near-UV through thermal infrared).• Field of view: 3 arcminutes (5 arcminute goal).• Angular resolution < 0.03 arcsecond.• Polarization accuracy < 0.01%.
ATST will be the world’s flagship facility for ground-based solar physics observation and the first large US solar telescope constructed in the past 30 years.
The Telescope
![Page 11: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/11.jpg)
Marching toward MREFC• ATST team had planned aggressively for an FY06 start of construction. This will not happen.
• Additional funding will be required to pay marching army and produce final design (note that current MREFC rules preclude funding design from MREFC). AST will fund through FY06 (FY07).
• The next steps:
ATST and AST craft development plan for FY06-7. Site selection complete – environmental impact study underway. Brought to MREFC panel in March 2005; advanced to readiness 9/05 In-depth cost review endorsed costing models completed Attempt to address critical path items – early procurement of primary mirror possible through AFOSR partnership Let contracts for final design to design and engineering firms. Complete Project Execution Plan. Final design review in early 2006. Construction begins in FY2008?
![Page 12: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/12.jpg)
Planning(Activity Accelerating)
O/IR roadmap team convened by NOAO O/IR roadmap team convened by NOAO has posted reporthas posted report
Radio/mm/sub-mm convened by AUI has Radio/mm/sub-mm convened by AUI has posted reportposted report
CMB Roadmap – this meetingCMB Roadmap – this meeting Dark Energy Task Force – end of 2005Dark Energy Task Force – end of 2005
![Page 13: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/13.jpg)
Building a Sustainable Program Promises to be transformationalPromises to be transformational Built on underpinnings of community involvement in Built on underpinnings of community involvement in
planning, advice, advocacy and “formal” agency planning, advice, advocacy and “formal” agency recognition of those structuresrecognition of those structures
Realistic (ambitious is OK, but….)Realistic (ambitious is OK, but….) Supportable by the astronomical communitySupportable by the astronomical community Supported by the astronomical community (over the long Supported by the astronomical community (over the long
haul – now 15 years)haul – now 15 years) Appeals to broader scientific communityAppeals to broader scientific community ““Understands” and meshes with agency processes (helping Understands” and meshes with agency processes (helping
to shape them if possible)to shape them if possible)
![Page 14: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/14.jpg)
Near Term Intermediate
Term
Horizon Facilities
Gemini
GSMT
EVLA I
VLA
GBT LOFAR
EVLA Phase II
LSST
SKA
OWL?
LOI?
CHARA
ALMA
CARMA
VLA
GBT LOFAR
LSST
GSMTNAIC
ATST
![Page 15: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/15.jpg)
NSF and AST Developments
New Deputy Director – Dr. Kathie OlsenNew Deputy Director – Dr. Kathie Olsen NSF program officer, Deputy Div DirNSF program officer, Deputy Div Dir NASA Chief ScientistNASA Chief Scientist OSTP Deputy Director for ScienceOSTP Deputy Director for Science
New Positions in ASTNew Positions in AST Two facilities/large projects managersTwo facilities/large projects managers Additional grants program rotatorAdditional grants program rotator Additional program officer for ESM (upgrade)Additional program officer for ESM (upgrade) Upgraded administrative position – finance and Upgraded administrative position – finance and
project supportproject support
![Page 16: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/16.jpg)
1990s Decadal Survey - Approx.
0
10
20
30
40
50
FY91 FY92 FY93 FY94 FY95 FY96 FY97 FY98 FY99 FY00 FY01
Fiscal Year
Millio
ns
of
Do
lla
rs
MMA SOAR Construction WIYN ConstructionCHARA Construction ISI Construction Fly's EyeEVLA I Adaptive Optics CfAO Adaptive Optics ATI
![Page 17: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/17.jpg)
![Page 18: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/18.jpg)
Operating budgets and grant increments to realize the Decadal Survey recommendations
___________________________________________
![Page 19: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/19.jpg)
Astronomy Division Budget - FY2005
![Page 20: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/20.jpg)
Astronomy Division Budget - FY2005
Facilities - $119.1 M
National Optical Astronomy Observatory (NOAO)
National Solar Observatory (NSO)
Gemini Observatory
National Radio Astronomy Observatory (NRAO)
National Astronomy & Ionosphere Center (NAIC)
University Radio Observatories
$24.1 M
$10.6 M(excludes TSIP, AODP)
$15.5 M
$47.0 M
$10.5 M
$11.3 M
![Page 21: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/21.jpg)
Astronomy Division Budget - FY2005
Astronomy Research & Instrumentation - $75.4 M
Astronomy & Astrophysics Research Grants (AAG)Particle AstrophysicsEducation & Special Programs (ESP)
CAREER, REU, Postdoctoral fellowships
Advanced Technologies & Instrumentation (ATI) Technology Development & Design for future facilities
Electromagnetic Spectrum Management (ESM)Science & Technology Centers (STC)
Center for Adaptive Optics (CfAO)
NSF/MPS Priorities and programs e.g. Cyberinfrastructure, Math Sciences
![Page 22: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/22.jpg)
AST Budget FY1995-2006
![Page 23: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/23.jpg)
Astronomy Division Budget Growth
Annual budget has grown by 60% since 2000 ($73 M)
But with $52M in directed appropriations in FY2001-2004- $32M to NRAO- $4M to NAIC- $4M to NOAO- $5M to ‘grants’
- $7M to instrumentation
Unable to plan for the increase and limited discretion over its use.
Growth has stopped (FY2005 budget down by $2M from FY2004)
![Page 24: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/24.jpg)
Astronomy Division Budget Growth
Observatory budgets FY1990 - 2006
![Page 25: NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.](https://reader033.fdocuments.in/reader033/viewer/2022051621/5697bf7c1a28abf838c83d09/html5/thumbnails/25.jpg)
How can we afford it?
Proposals and studies Proposals and studies will sharpen costwill sharpen cost
Planning will provide Planning will provide phasing, decision phasing, decision points, down-selectspoints, down-selects
Overall plan must Overall plan must meet fiscal realitymeet fiscal reality
How?How?
NSF Budget Authority Projection
$4.40
$4.60
$4.80
$5.00
$5.20
$5.40
$5.60
$5.80
$6.00
2002 2003 2004 2005 2006 2007 2008 2009
Fiscal Year
Bil
lio
ns
of
Do
llar