    Transformer testing

    By

    Nafees Ahamed

    Megger India

  • 8/20/2019 NPTI Transformer New

    2/27

    Transformer operation:

    Power in Power out

    Vout * IoutVin * Iin

    Power IN = Power OUT

    • STEP-UP transformer: Vout > Vin and Iout< Iin

    • STEP-DOWN transformer: Vout < Vin and Iout > Iin

  • 8/20/2019 NPTI Transformer New

    3/27

    Maintenance of Transformer should include Routine Inspection & repair

    Transformer liquid maintenance & testing Transformer winding Insulation maintenance & testing

  • 8/20/2019 NPTI Transformer New

    4/27

    Why test transformers?

    Transformers are tested to prevent failures

    Safeguard against breakdowns by detecting potential causes and eliminating

    them and ensure many years of trouble free operation

    Unplanned outage – high cost to operations

    • Many Utilities believe their wires not only carry electricity, but they also

    carry money !

    Replacement Transformer - very expensive

    Catastrophic failure can cause ancillary damage and even death

  • 8/20/2019 NPTI Transformer New

    5/27

    Transformer – Failure Symptoms

    Turn-to-Turn short

    Open Winding

    Poor connection

    Insulation damage

    Moisture in Insulation

    Mechanical damage

    Core overheating

  • 8/20/2019 NPTI Transformer New

    6/27

    Transformer – Prescribed tests

    Failure symptom Preventative and Diagnostic test

    Turn-to-turn short Turns Ratio

    Winding

    Resistance

    Excitation

    Current

    Open Winding Turns Ratio

    Winding

    Resistance

    Poor connection Turns Ratio

    Winding

    Resistance

    Insulation damage Power Factor

    Excitation

    Current

    Insulation

    Resistance FRA

    Moisture in Insulation Power Factor

    Insultation

    Resistance

    Moisture in

    Oil test

    Mechanical damage

    Excitation

    Current Power Factor FRA

    Core overheating

    Insulation

    Resistance

    Excitation

    Current

  • 8/20/2019 NPTI Transformer New

    7/27

    Transformer Acceptance tests

    Insulation resistance test

    AC or DC hipot test(Optional)

    Insulation PF test

    Transformer turns ratio test

    Polarity test

    Excitation current test

    Insulating fluid dielectric(BDV) tests

    Sweep frequency response analyzer

  • 8/20/2019 NPTI Transformer New

    8/27

    Routine field tests on Transformer

    Insulation resistance test

    AC or DC hipot test(Optional)

    Insulation PF test

    Transformer turns ratio test

    Polarity test

    Excitation current test

    Induced potential test(Optional)

    Transformer core ground test Insulating fluid dielectric(BDV) tests

    Dissolved gas analysis(DGA)tests

    Sweep frequency response analyzer

    Polarization recovery voltage test(Obsolete) now replaced withDielectric frequency response test

    DC winding resistance

  • 8/20/2019 NPTI Transformer New

    9/27

    Transformer Turns Ratio

    Applies voltage to one winding of a Transformer and detects the voltage being

    generated on another winding on the same core

    Voltage Ratio is directly proportional to the Windings Turns Ratio:

    Np VpTTR = ------- = ------

    Ns Vs

    Where:

    NS = Number of turns of the Secondary winding

    NP = Number of turns of the Primary winding

    VS = Volts on the Secondary

    VP = Volts on the Primary

  • 8/20/2019 NPTI Transformer New

    10/27

    Three–Phase Transformer

    CoreWindings

    A B C

    Phases:A,B,C

  • 8/20/2019 NPTI Transformer New

    11/27

    3-Phase Transformer

    Configurations

    DELTA

    A

    B C

    A B

    C

    Possibleconfigurations:

    WYE

  • 8/20/2019 NPTI Transformer New

    12/27

    TTR tests provides the following information Turns ratio and polarity of single & three phase transformers, one

    phase at a time Confirms name plate ratio, polarity and vectors

    Identifies trouble in transformer windings, such as open-circuit andshort-circuits of turn to turn sensitivity

    The standard deviation as defined by ANSI / IEEE C57.12.00-2006,

    states that results should be within 0.5% of name plate markings.

  • 8/20/2019 NPTI Transformer New

    13/27

    What is Power Factor ?

    What is Dissipation Factor ?

  • 8/20/2019 NPTI Transformer New

    14/27

    The PF / DF tests conducted in the field for acceptance(start - up)and routine field(Maintenance) testing of insulation of electricalequipment.

    The purpose of these tests is to identify if the equipment has beeninstalled properly, determine if corrective maintenance and repair isneeded, and /or track the gradual deterioration of the equipment overits life.

    PF /DF are not go-no-go tests, and can measure dielectric loss,Capacitance, and AC resistance of insulation.

    Do not overstress the insulation and can determine if the insulation is

    slowly degrading by comparison with previous tests results, or withtest results of similar equipment.

  • 8/20/2019 NPTI Transformer New

    15/27

    Single–Phase Transformer

    Primary Secondary

  • 8/20/2019 NPTI Transformer New

    16/27

    High Low

    H L

    G

    Chassis

    Three-terminal devicefor PF/DF testing

    Single–Phase Transformer

    CHG CLG

    CHL

  • 8/20/2019 NPTI Transformer New

    17/27

    G

    A

    B C

    A B

    C

    HL

    Three-terminal devicefor PF/DF testing

    Three – Phase Transformer

  • 8/20/2019 NPTI Transformer New

    18/27

    Three-terminal device

    H

    L

    G

  • 8/20/2019 NPTI Transformer New

    19/27

    A “Three-terminal” transformer (with Primary and

    Secondary winding(s), has three capacitances:

    CHL, CHG, and CLG

    A perfect capacitor allows AC current to flow (IC), leading

    the voltage by 90º.

    In “practice”, however, capacitors allow leakage current

    (IR), which is in phase with the voltage (0 º).

  • 8/20/2019 NPTI Transformer New

    20/27

    In practice, Capacitors have leakage (loss) current:

    V0

    IC

    IR

    I

    δ

    IR

    Tan δ = = DFIC

    IR= PF

    I

    Normally, IR is less than 1/100th of IC (or

  • 8/20/2019 NPTI Transformer New

    21/27

    Factor influence PF measurements

    Temperature

    Humidity

    Surface leakage

    Dependent upon moisture and cleanliness of the surface of thespecimen under test.

    When making PF tests, the effects of surface leakage (due tohumidity and dirt etc.,) should be recognised and addressed

    accordingly. The effect of surface leakage current may be minimised by cleaning

    and drying external surfaces to reduce the losses, or using guardcollars to divert the surface leakage current from measuring circuit

  • 8/20/2019 NPTI Transformer New

    22/27

    Excitation current

    Commonly known as no load or magnetizing current of thetransformer.

    In this test,voltage is applied to the primary winding one at a time

    with all other winding left open. Excitation current is the current the transformer draws when voltage

    is applied to its primary terminals with the secondary terminal open.

    Excitation current provides means of detection for winding

    problems(short-circuited or open turns, poor joints or contacts, coreproblems etc.,

    Conducted on each phase winding at a time, that is only one windingis under test with the other winding including the secondary windingare floating.

    Measure is in UST mode.

  • 8/20/2019 NPTI Transformer New

    23/27

    Evaluation and grading of PF and DF Test Results

    The evaluation criteria may be divided into four

    catagories.

    Good: Insulation condition is good and suitable for continued service

    Deteriorated: Insulation condition is satisfactory for service butshould be checked within six months to see if the condition hasfurther degraded

    Marginal: Insulation condition is not satisfactory for service-

    immediate investigation of the degraded conditions should be begunand if this is not possible then it should begun as soon as possible

    Bad: Remove from service and recondition to restore insulation togood condition, if not possible, then replace

  • 8/20/2019 NPTI Transformer New

    24/27

    Winding resistance

    Measuring a transformer's winding (DC) resistance from one external terminalto another can reveal a great deal of information about the transformer. Inaddition to the obvious faulted winding (i.e., an open winding), more subtleproblems can be detected. The DC current, in addition to flowing through thewinding, must also flow through the off-load ratio adjusting switch (De-Energized Tap Changer or DETC) and the on-load ratio adjusting switch(Load Tap Changer or LTC), as well as numerous welded and mechanicalconnections. Hence, the integrity of all these components can be verified.

    Measuring the resistance of the windings assures that the connections arecorrect and the resistance measurements indicate that there are no severemismatches or opens. Many transformers have taps built into them. Thesetaps allow ratio to be increased or decreased by fractions of a percent. Any ofthe ratio changes involve a mechanical movement of a contact from one

    position to another. These tap changes should also be checked during awinding resistance test.

  • 8/20/2019 NPTI Transformer New

    25/27

    Regardless of the configuration, either star or delta, the measurements arenormally made phase to phase and comparisons are made to determine if thereadings are comparable. If all readings are within one percent of each other,then they are acceptable. Keep in mind that the purpose of the test is tocheck for gross differences between the windings and for opens in theconnections. The tests are not made to duplicate the readings of themanufactured device which was tested in the factory under controlledconditions and perhaps at other temperatures.

  • 8/20/2019 NPTI Transformer New

    26/27

    When to measure?

    At InstallationRisk of damage is significant whenever a transformer is moved. This is inherent to thetypical transformer design and modes of transportation employed. Damage can alsooccur during unloading and assembly. The damage will often involve a current carryingcomponent such as the LTC, DETC or a connector. Damage to such components mayresult in a change to the DC resistance measured through them. Hence, it isrecommended that the DC resistance be measured on all on-load and off-load taps priorto energizing. If the transformer is new the resistance test also serves as a verification ofthe manufacturers work. Installation measurements should be filed for future reference.

    At Routine(scheduled) Transformer maintenance

    Routine maintenance is performed to verify operating integrity and to assure reliability.Tests are performed to detect incipient problems

    At unscheduled maintenance / troubleshootingUnscheduled maintenance generally occurs following a system event. The objectives ofunscheduled maintenance are:To detect damage to the transformer.

    To determine if it is safe to re-energize.To determine if corrective action is necessary.To establish priority of corrective action.

  • 8/20/2019 NPTI Transformer New

    27/27

    Interpretation of Measurements

    Measurements are evaluated by:

    Comparing to original factory measurements Comparing to previous field measurements Comparing one phase to another

    The industry standard (factory) permits a maximum difference of 1/2 percentfrom the average of the three phase windings. Field readings may varyslightly more than this due to the many variables. If all readings are within onepercent of each other, then they are acceptable. Variation from one phase toanother or inconsistent measurements can be indicative of many different

    problems: Shorted turns

    Open turns Defective DETC or LTC

    Poor connections (brazed or mechanical)

    The winding resistance test is very useful in identifying and isolating thelocation of suspected problems.