IOGP Report Decommissioning Of CGBS November 2017, St. Andrews Decomissioning Conference John Gillies Joint Interest Project Manager ExxonMobil International Limited

Transcript of November 2017, St. Andrews Decomissioning Conference...

IOGP Report Decommissioning Of CGBS

November 2017, St. Andrews Decomissioning Conference

John Gillies

Joint Interest Project Manager

ExxonMobil International Limited

• International Association of Oil & Gas

Producers

• Members produce 40% of global oil and

gas in 80 countries

• Share knowledge and good practices

• Official “Observer” status at OSPAR

• Decommissioning Committee papers on

Subsea Bundles & Concrete Gravity Base

Structures (CGBS)

2

About IOGP

• 27 structures (12 each UK/Norway)

• Northern North Sea, >90m water

• 17 have been used for oil storage

• Typical 300,000 tonnes (>ten times

more than large jackets)

3

CGBS in OSPAR Area

Ownership (equity tonnage)

4

• Most clustered close to UK/Norway

median; International cooperation essential

• Non OSPAR ownership similar include

Canada, Russia, Australia, othersStatoil

Petoro

Total

ExxonMobil

Shell

Centrica

Taqa

CoP

CNR

Fairfield

Gassled ENI

Apache

Chrysaor

Mitsubshi

Hess

others

Construction Scale & Context

5

• 10 million tonnes installed 1970-1990

• ~20 times weight of all OSPAR derogation

jackets

• 0.5 million truck loads if recovered to shore

• Total aggregate ~1yr. production from UK’s

largest quarry

0

2

4

6

8

10

12

Installed weight by period

Regulatory Framework

• OSPAR 98/3 framework

• 4 derogation requests approved to date

(one oil storage), four pending

Full Removal

• Weight and geometry far exceeds available

lifting vessel, draft exceeds deepest ports

• Re-float feasibility not demonstrated:

1. Re establishing integrity

2. Seabed resistance & withdrawal suction

3. Stability during de-ballasting

• 1m thick, 20m diameter, 100 wire tendons 250 tonnes tension each

• Lifting: legs 8k-tonnes each; dual crane (Thialf, S7000)

Partial Removal

Leave In Place ?

• Leg Collapse ~ 250 years?

• Caisson substantially intact 600-1000 years?

• Collision risk <1:10,000 year event

• Toppling legs feasible with 500 tonne bollard pull

• Quantity and fate of contents

Progress Since 2013 Update

Significant knowledge added:

• Survey, sampling and attic oil removal

developed and proven

• Fate models developed

• Feasibility of leg cutting tested

• Leg lifting concepts developed

Thank you