G-Tech Quarterly Newsletter
UK PATENT NO. GB2490722
Rail Alliance 15’ G-Tech had an extremely construc�ve week at Rail Alliance and look for-
ward to 2016 posi�vely. As a company we have taken the opportunity in
the months passed to grow and improve ourselves and our products,
star�ng with a new large site and home for G-Tech as well as Colt Construc-
�on; with modern office space, purpose built manufacturing facili�es and
over four acres of external storage space.
G-Tech’s new premises con�nues to expand, adding a new dedicated train-
ing development facility and industrial technical centre, keen to con�nually
innovate into our products and expand our Main Produc�on Facility to pro-
mote and accommodate larger contracts. It is G-Tech’s vision to expand on
the already impressive success na�onwide.
In the coming weeks and into 2016 we will be offering the opportunity for
Network Rail organiza�ons to visit the new site and view the developments
and technologies for themselves. Including all related and on going devel-
opment, and new innova�ve technologies poten�ally accompanying the G-
Tech Coper in the near future. G-Tech Stand at Rail Alliance 15’
KEY ASPECTS OF THE G-TECH
• TIME SAVED ON MAN HOURS
• MONEY SAVED ON MAINTENANCE
• POSSESSION COSTS REDUCED AS 30% MINIMUM
FASTER LAYING TIME THAN TRADITIONAL
• FROST HEAVE ELIMINATED
• TRIP HAZARDS REDUCED CONSIDERABLY
• OVERHANG EXTENDED
• LARGE BRIGHT UV STABLE TACTILE COLOUR RANGE
• PRECAST LIFTING SOCKETS FOR EVEN, SAFER
MOVEMENT
• TACTILE REPLACEABLE WITHOUT TAKING OUT EN-
TIRE COPER UNIT IF DAMAGE OR VANDALISM OC-
COURS. The G-Tech Coper Team and Stand at Rail Alliance 15’
Nov 2015
COMPANY HISTORY With over 20 years of Colt working with Network
Rail and having such a wide range of knowledge
and experience in the construc�on industry, the
problems rela�ng to rail became a large element
of day to day working. Colt were spending a tre-
mendous amount of �me contracted into jobs
which included removing trip hazards caused by
the tradi�onal tac�le and coper methods moving
independently. The managing director of Colt at
the �me Glenn Telford and his construc�on
team, working closely with Network Rail set out
to find a method to solve problems of the high
costs on con�nually maintaining pla3orms. G-Tech Hazard Yellow Dual Unit
Traditional coper and tactile in-stallations were failing
due to them having separate cement beds and intense movement against
the pla3orms from the trains and frost heave, causing huge problems for
sta�on managers and travellers. The movement of the various elements
causing trip hazards on the edge of a pla3orm.
With the full backing of Network Rail the Colt Group carried out
the first trial of the G-Tech coper at Bentley Sta�on in Hampshire, 100 test
copers were laid on a pla3orm. The coper had features which had not
been seen before, and problems which were being caused by tradi�onal
methods had been eradicated by a simple but effec�ve design. The tac�le
element is made of a polyurethane, uv stable material, which is bonded
into a recess on the coper with adhesive that is adhered in temperature
controlled factory condi�on, ensuring the previous problems with surface
mounted tac�le installa�on had been eradicated.
The problem of the copers components moving individually had been solved
as each coper is laid on a single cement bed, levelling and laying becomes
easier and quicker; also with the G-Tech Coper is a single unit there is no
independent movement and the slips, trips and fall hazard is considerably
reduced.
Bentley Station Before
Bentley Station After
We tried to overcome smaller issues affecting Network Rail as well as the larger problems
our coper comes complete with a chlorinated rubber white line on the nosing and li8ing socket caps so only minor
touching up is required on site. Dependant upon the line speed the hazard yellow tac�le is popular at present, as it is
being trailed as a replacement for the painted yellow line. The tac�le gives a wider more prominent line, and the
blisters apposing to a painted line making visually impaired more aware of the pla3orm edge. It saves a huge cost on
periodically re-pain�ng of lines on the pla3orm, as the tac�les colour runs throughout and rather than just on the
surface, making minor chips or scratches less apparent. Ul�mately this saves on a huge maintenance cost to Net-
work Rail over �me and is another reason as to why the G-Tech Coper has become a;rac�ve..
4 Years on Bentley Station is maintenance free
with no faults recorded to date and G-Tech is s�ll growing at a rapid rate. We con�nue to be ambi�ous to economize
in the UK along with Network Rail, making safer pla3orms, saving �me on working hours, minimizing hazards and
saving on maintenance over a period. Our most impressive record to date states over 300 copers laid in one week-
end possession, this due to the G-Tech being a single unit, making a saving on �me and labour of approximately 30%
comparing to tradi�onal methods. We always knew this was a keen factor to Network Rail with over 3 billion pounds
spent per annum on possessions.
The high speed growth of G-Tech in a short time confirms confidence in our product
going into 2016 the G-Tech coper is fully UK patented, we own a 4.8 acre premises for offices, storage and manufac-
ture; and have sold almost 25,000 copers in the UK to date. As a company G-Tech has the full backing of a 28 year
established business in Colt Construc�on, ideas, knowledge and determina�on which has put us at the forefront of
our compe��on. We now produce the largest selling combined tac�le coper in the UK and maintain as a team to
keep it that way for the foreseeable future in what looks to be exci�ng �mes ahead, for rail innova�on.
G-Tech Buff, Charcoal and Hazard Yellow Units
G-Tech UK Sta�ons
Bentley Sta�on, Hampshire GU10 5JZ
Buff Dual Units—Over 50no Units
Ashtead Sta�on, Surrey KT21 2DR
Yellow Dual Units —Over 300no Units
Vauxhall Sta�on, London SW8 1SS
Buff Dual Units—Over 400no Units
Wandsworth Town, London SW18 1SU
Buff Dual Units—Over 300no Units
Crowhurst Sta�on, East Sussex TN33 9DD
Buff Dual Units—Over 500no Units
Gatwick Sta�on, Crawley RH6 0RD
Buff Dual Units—1600no Units
Fleet Sta�on, GU51 3QY
Yellow Dual Units—Over 400no Units
Three Bridges Sta�on, Crawley RH10 1LY
Yellow Dual Units—Over 1200no Units
Twickenham Sta�on, London TW1 3SX
YHazard Yellow Dual Units—Over 300no Units
Rainham Sta�on, Essex RM13 9HY
Buff Dual Units—380no Units
Wimbledon Chase Sta�on, SW20 8JT
Yellow Dual Units—350no Units
Rochester Sta�on, Kent ME1 1HU
Buff Dual Units—Over 800no Units
National Rail Network
Cranbrook Sta�on, Devon TN17 3LU
Buff Dual Units—Over 180no Units
Lea Bridge Sta�on, E10 7LN
Yellow Dual Units—388no Units
Wessex Route
Yellow Dual Copers—Over 18000no Units
Ukfield Line
Yellow Dual Copers—780no Units.
For latest sta�on count please contact either;
lucy@g-techlimited or 01482 755755.
Why G-Tech?
At G-Tech we de-signed a product which eradicates previous issues which were being caused on rail-ways with tradi-tional coper sys-tems.
The ongoing tra-ditional method consists of vari-ous components; a concrete coper and blistered blocks behind. Problems continu-ously occurred because of the separate parts having to be laid on cement beds which were at dif-ferent levels, and different mixing gauges; causing movement in the elements con-tracting when dry-ing out occurs at different rates, this begins to be a huge issue.
Different compo-nents leaves the platform has nu-merous joints, which after move-ment occurs, wa-ter then ingresses causing frost heave between components, leaving a very uneven surface.
G-Tech Factory
Why there are over 20,000 G-Tech Units Sold Over the UK
Saves Possessions
Our unit, with 4 li8ing eyes in the design, makes the weight evenly propor�oned on
manoeuvring, the G-Tech Coper can be lowered evenly onto a pre-prepared bed. As a re-
sult of our copers single bed construc�on the laying �me is drama�cally reduced.
Saves Money
The G-Tech coper saves on a con�nual maintenance costs, due to its low maintenance
design. Our tac�le is a UV stable hazard yellow colour, and our unit comes with a factory
adhered white line on the nosing - minimizing site labour.
Laying Methods
The li8ing of the unit can be done simply by using small machinery such as a counterbal-
ance, A-frames etc with M16 li8ing eyes, and tested shackles to coincide with double leg-
ged brothers. Most units will accommodate small or narrow openings.
Less Accidents
With the installa�on of cast in li8ing eyes, movement of the coper is safer as apposed to
using stone magnets, or slings. the li8ing eyes give an even li8. The aggregates used man-
ufacturing our coper achieve the highest slip result, with a percentage of copers tested
regularly in-house to ensure a constant pass rate is a;ainted. Records are available and
provided on delivery to site.
Less Maintenance
Up-keep of pla3orms is always a huge cost to Network Rail. The movement in the beds
between the separate components on older systems meant the replacement or re-
bedding of tac�les was a huge element in constant maintenance at sta�ons. G-Tech have
made it so any movement is limited taking away huge needs for a8ercare maintenance.
EXTENDED OVERHANG G-Tech have looked into a common problem for NWR and found a genuine solu�on.
Q: What is the maximum coping stone projec�on that can be achieved?
A: This is subject to a number of factors including design loading (pla3orm load class) and
the riser wall / support structure being in good condi�on. G-Tech have extended their
overhang from a basic 150mm up to 225mm due to weight loadings.
Q: What are the benefits of extended overhang to NWR?
A: The gauge on pla3orms can be achieved without needing any further adjustments to
riser walls or pla3orm structures, by simply replacing copers to achieve desired results saves
on cost. An increased projec�on allows safer train to pla3orm gap flexibility.
Q: What will G-Tech consider if I do extend my overhang?
A: G-Tech will always consider correct calcula�ons before a projected overhang is provided.
Maximum pla3orm loading restric�on for 'pedestrians loading' including agreement of
management aspects with Network Rail and overturn checks will be undertaken.
Safety is OUR Priority Our in-house tes�ng facili�es to cover all main
aspect of; NWR Standard NR/L3/CIV/030.
• Slip Resistance Tes�ng
• Overhang Structural Unit
• NWR Drop Tes�ng
Safety is our main priority at G-Tech as a compa-
ny we slip resistance test 2% of every order
which leaves our premises to ensure NWR stand-
ard is always met.
In house and Independent Slip Testing
G-Tech’s Internal Overhang Test Unit
NWR Drop Test
Drop Tes�ng Drop tes�ng is carried out at our Hull facili�es
with a 102kg ball weight, dropped from a 1 metre
height providing a 1Kn impact force onto the tac-
�le.
Our G-Tech tac�le is made from a strong blend of
materials, compared to the original un-reinforced
concrete tac�le blister type. Con�nual tes�ng has
provided us with a wealth of test results which
with the independent tes�ng we con�nue to use
confirm the robustness of the product.
CASE STUDY
Twickenham
Station
Greater London
TW1 3SX
In April 2014 G-Tech
received an order to
supply all the copers for
Twickenham Sta�on.
500 1220mm x
1160mm copers were
delivered to site and
were to be laid onto
the sta�on harp
pla3orms.
The hazard yellow tac-
�le was intended to
replace the yellow line,
which we were confi-
dent would be an
a;rac�ve feature speci-
fied by Network Rail.
Compared to a painted
line the blisters on the
tac�le make travellers
aware they are stand-
ing on a line making
them more conscious
to step back and move
behind it. The product
is yellow throughout
and no amount of
scratches or impact to
the product will have
an affect on the bright
and vivid colour. The
yellow is now being se-
lected by more and
more sta�ons and may
well become accepted
as the yellow line.
Twickenham Station
Brendan Keogh Construc�on Ltd. Twickenham Sta�on was completed in a
three weekend possession over several
weeks of contract. G-Tech had a constant
liaison with the main contractor Osborne’s
and were ready to assist if necessary as on all
sta�ons. The works to date highlighted the
largest amount of copers laid in the shortest
amount of �me.
The conven�onal product would have re-
quired considerably longer �me taken to lay
than the G-Tech Coper. In a 72 hour week-
end possession the Brendan Keogh team lay-
ing the G-Tech coper laid 300 units. Brendan
Keogh himself said that “it’s a great product
and so easy to lay saving a minimum of 30%
laying, seOng out and drying �me, it gives
great benefits to the industry”
“We have installed the
G-Tech coper at a large
number of stations now
and on all occasions the
product has installed
extremely well and saves
many installation hours
in comparison to the
more conventional plat-
form edging product”
- Brendan Keogh
Contact Us
Give us a call for more infor-
ma�on about our products;
G-Tech Copers Ltd.
Freightliner Road
Hull, HU3 4UR
(44) 1482-755755
Visit us on the web at
www.g-techlimited.co.uk
G-Tech Premises G-Tech along with Colt Construc�on moved into the new offices at the be-
ginning of April 2015.
The impressive building was an innova�ve addi�on to the area in Hull,
which is a well-established industrial town in itself. With the backing of
MP’s and councils we have been acknowledged on how we have be;ered a
neglected building which was under u�lized for many years.
Loca�on and Size
Close to the A63 off the M62 it was in a perfect posi�on for deliveries and
expected traffic. With a large, fully concreted yard we have enough space
for all expected types of vehicles coming in and out including Hiab loaders
and Ar�culated vehicles.
Expansion
Due to the success of the product to date we are already in discussions
with the owners of the adjoining land to take a further poten�al five acres.
The coper is a;rac�ng such interest across the network we are already
holding over 10000 vested units for several contractors. With further vest-
ed orders expected before the end of the year we will soon reach our op�-
mum external storage space limit.
We have already purchased adjoining buildings to expand the current pro-
duc�on facili�es.