November, 2011
Dangote Group (Integrated Cement Plant in Senegal)
Our Evolution
2
Started as a trading company in 1978 to take advantage of the rising demand for various commodities
Abolition of import licensing regime, led to increase in scope of operations
Became a leading bulk trader of various commodities
Transformed from a bulk commodity trading company to a manufacturing concern via an import substitution strategy along the Group’s traditional business lines.
DIL incorporated as the vehicle for executing growth strategy
Developed brand equity for products.
Acquisition of strategic assets
Expansion of existing capacities
Prudent management/ strategy of reinvesting funds
Improved business process and structure to align with the Group’s business vision
A massive conglomerate with annual group revenue of US$1.6bn(FY06)
Spin off of Sugar, Flour, Salt and Pasta divisions to wholly owned subsidiaries
Successful IPO and listing of Sugar, Flour and Salt businesses
Commissioned the largest cement plant in sub-Saharan Africa – Obajana Plant (5MMtpa)
Diversification into Oil & Gas, Steel, Fertilizer, Telecoms and Petrochemicals
Domestic expansion to ensure strong presence along the food value chain
Strong asset base and brand equity
Improved business processes, governance and organizational structure
Consolidation of Cement interests & listing of DC PLC
Expansion of Cement footprint in Nigeria and across Africa
The Early Days
Growth Sustenance +
Expansion
Expansion + Group
Restructuring
Diversification, Expansion + Consolidation
Transition Phase
1978 - 1997
2007-Date
2003 - 2007
2000-2003
1997 – 2000
Rapidly Expanding our Cement Footprint
3
Dangote Industries Senegal, S.A.
4
65 Kms EAST OF DAKAR 65 Kms EAST OF DAKAR
Dangote Industries Senegal, S.A.
5
The Cement Plant
Annual Production capacity: 1.5m tons per annum;
Investment budget: $350m
Direct jobs created: 500+
Indirect jobs: 2 000+
Markets: Senegal, Mali, Guinea and Gambia
Cement Production - 4000 tpd
6
Raw Materials Limestone and Laterite from Pout
Mines Clay & Gypsum from other Mines
Power Coal Based Power Plant
- Boilers (rated capacity 2 x 65 TPH)- Turbine (rated power – 1 x 30MW)
The Cement Plant………………..cont’d
7
The Cement Plant………………..cont’d
Major Equipment Suppliers
• GORE USA
• CDI , USA –(OLBC Belt)
• VENTI OLDE – Germany
• FLENDER – Germany
• AUMUND – Germany
• LOESCHE – Germany
• SINOMA , CHINA
• H&B, Germany
•IBAU Germany • CATERPILLAR, USA
• TEREX, UK
• GE, USA
• Thyssen – Germany
• IKN – Germany
•Pillard – France
• Siemens – Germany
• Claudius Peter- Germany
8
Key Milestones
Clinker Production- Q1 2012
Cement Production- Q1 2012
9
Uniquely Positioned for Success
State of the Art Technology
Robo Lab Cross belt Analyzer On line Stack Monitoring for Dust
Emissions Wear Resistance & Free Flow Liners
for Hoppers Preheater top cyclone diptubes with
vortex design High efficient heat recovery cooler High efficiency process fans Bucket Elevators For Feeding Multi Channel Burner Pipe
High Efficiency Separator Latest Technology of Smart MCC
for easy operation , online monitoring of Drives etc
On Line Energy monitoring system
Latest PCS -7 & S7 - 400 PLC Model
Microprocessor Based Individual Control Systems For Various Small Packages.
Smart Temp/ Flow/ Pressure Transmitters.
Kiln Shell Scanner Burning Zone and Cooler
Cameras
10
Uniquely Positioned for Success................cont’d
High Quality Manpower – Technical and Non-Technical
Subsidiary of DC Plc – arguably the
fastest growing cement company in the world
Estimated Limestone Reserves – 300 Million Tons (150 yrs reserves)
11
Plant View After Project Completion
.
12