NOVEMBER 13 , 2017 / DINO HADZIC / EP EVI EV Infrastructure · NOVEMBER 13TH, 2017 / DINO HADZIC /...
Transcript of NOVEMBER 13 , 2017 / DINO HADZIC / EP EVI EV Infrastructure · NOVEMBER 13TH, 2017 / DINO HADZIC /...
CONFIDENTIAL
NOVEMBER 13TH, 2017 / DINO HADZIC / EP EVI
EV InfrastructureEV Infrastructure
EV SUBMISISON 52 ATTACHMENT 1
1 of 12
Most efficient energy crops (palm oil, sugar cane) deliver 0.5L/m² including sowing, fertilizing, harvesting, refinement and distribution. A vehicle drives 15km/L, so 0.5L gives 7km range.
A solar panel delivers 105 kWh/m².After electrolysis, compression and distribution 63kWhgoes into the tank. The fuel cell generates 31.5kWh of electricity. The vehicle drives 5km/kWh, so 31.5kWh gives 160kmrange.
A solar panel delivers 105 kWh/m².After distribution, charging and storage in the battery, 77kWh is available to the motor.An EV drives 5km/kWh, so 77kWh gives 380km range.
Range per year per m² of land
Well-to-wheel efficiency of alternative fuels
Biofuel: 7km
Hydrogen: 160km
Electric: 380km
Original source: Auke Hoekstra, Eindhoven University of Technology. Data was modified due to improved performance of biofuel and hydrogen.
EV SUBMISISON 52 ATTACHMENT 1
2 of 12
ABB leading in major developments this decade
EV fast charging and global standardization
2010
First 50 kW
charger in EU Based on proprietary
standard, no consumer
EV’s available
2010Founding of
CHAdeMOABB was involved
from the start
2010
First EV’s with DC
chargingNissan Leaf & Mitsubishi
iMieV
2012
First demo of
CCS chargingABB & CCS alliance at
EVS26 show In Los
Angeles, USA
2012 - 2013
First nationwide
DC networksABB in Estonia,
Denmark, Netherlands
2014, >
DC networks
spread globallyEurope, USA, Asia
First EV’sCHAdeMO
CCS alliance
Multi-standard
Pilots
Global EV spread
Higher power
E-bus
IEC 61851-23
2012
Founding of
CCS allianceABB was involved
from the start, basis
for IEC standard
Near
Future
2010Launch ABB
Terra 51 50 kW CHAdeMO
charger
2012, >
Leading Connectivity
& uptimeABB has industry leading
uptime by remote
management
and supports global payment
solutions
DC home
2013-2015
Launch global
variants Terra 53China, USA, APAC
2013
Launch CCS &
multi-standard Terra
53 CCS + CHAdeMO + AC
2016
First eBus
chargers in EUGlobal partnerships with
bus OEMs
OppCharge
EV SUBMISISON 52 ATTACHMENT 1
3 of 12
50kW CHAdeMO / 22-43 kW AC / 50kW CCS 2
OEM Fast Charging standards
Q4-2012
22-43 kW AC
2010
CHAdeMO
Q4-2013
CCS 2
EV SUBMISISON 52 ATTACHMENT 1
4 of 12
5.016 CHAdeMO / 3.375 CCS fast charging stations in Europe (per 07/11/2017)
DC-Fast Charging is happening in Europe
www.chademo.com http://ccs-map.eu/
http://www.charinev.org/ccs-at-a-glance/infrastructure/
CHAdeMOEurope: 5.016USA: 2.260Japan: 7.133Other: 2.200
Globally: 16.609
CCSEurope: 3.375USA: 2.000 approx.Other: 1.000 approx.
Globally: 6.375 approx.
EV SUBMISISON 52 ATTACHMENT 1
5 of 12
On-board versus Off-board equipment
DC charging versus AC charging
CHAdeMOmodule
Li-ion battery
Every vehicle needs to have its own onboard equipment
Infrastructure investment is shared with hundreds of users
CHAdeMOmodule
DC Fast Charging Station
On-boardCharger
Li-ion battery
BMS
AC Charging DC Charging
EV SUBMISISON 52 ATTACHMENT 1
6 of 12
A new phase: The facts can no longer be denied
Main changes in the last months
Tesla from zero to 32% market share in 6 years !
What will happen in mainstream segment with Tesla Model 3?
https://www.bloomberg.com/news/articles/2016-10-12/tesla-dominates-u-s-luxury-sedan-saleshttps://cleantechnica.com/2017/07/05/tesla-model-s-crushes-large-luxury-car-competition-h1-2017-us-sales/
EV SUBMISISON 52 ATTACHMENT 1
7 of 12
Fear to miss out: massive EV programs announced
BEV gains speed in car market
But… car development
cycle is 3-4 years per model
Focus shifts to full long range
EV, and less on PHEV
EV SUBMISISON 52 ATTACHMENT 1
8 of 12
MercedesVito E-cell
Citroën C-Zero
Ford Focus Electric
Smart EDGen 1 Renault
TwizyRenault
Fluence ZE
Citroën Berlingo
RenaultKangoo ZE
BMW i3
DC fast charging CCS (50 kW @400 V)
DC high-power charging CCS (≥150 kW @400 V)
Opel Ampera-e
300 km
VW e-Golf
130 km
130 km
VW e-UP!
110 km
Nissan Leaf 1.1
130 km
Nissan e-NV200
110 km
KiaSoul-EV
150 km
Tesla Model X (adapter)
450 km
BMW i3
190 km
VW e-Golf 1.1
300 km
Hyundai Ioniq
140 km
110 km
Peugeot iOn
110 km
Nissan Leaf 1.0
120 km
110 km
PeugeotPartner
110 km
Renault Zoe ZE
130 km
Mercedes B250E
140 km
Tesla Model S
450 km
Daimler Smart ED
110 km
Renault Zoe 1.1
200 km
Daimler E-Smart
?? km
Tesla +adapter
450 km
MitsubishiOutlander PHEV
40 km
Honda Fit
100 km
Citroën E-Mehari
200 km
Mahindra e20
110 km
Tesla Model 3ccs?
?? km350 km
Renault Zoe
130 km
Tesla Model S
450 km
Focus Electric
165 km
2019 2020 2021, …
DC high-power charging CCS (≥350 kW @400/800 V)
Mitsubishi i-MiEV
Only AC slow (3.6-7.2 kW)
DC fast charging CHAdeMO (50 kW @400 V)
AC fast charging 43 kW
AC charging 11 kW
110 km
2017 2018
AC charging 22 kW
Follow the car through Europe, and open standard protocols
Infinity LE
200 km
AstonMartinRapidE
?? km
VW ID 'Golf'
500 km?
Jaguar i-Pace
450 kmh
Skoda E
500 km?
BMW Mini E
?? km
Hyundai eSUV320 km
Ford Model E
?? km
450 km
Porsche Mission E
2010 - 2016
500 km
VW ID Buzz
VW e-Golf
180 km
Volvo XC40
350 km
Mercedes EQC
500 km
Mercedes EQA
??? km
Audi eTron (SUV)
500 km
VW ID Crozz
?? km
BMW X3e
500 km?
Honda Urbanccs?
250 km?
Mazda EVccs?
?? km
Kia Niro 150 km
Nissan Leaf
300 km
Nissan Leaf
200 km
Renault Zoe
?? km Peugeot 2008 EV
??? km
Peugeot 208 EV
??? km
600 km
Fisker Emotion FF 91 650 km
Lucid Air 650 km
EV SUBMISISON 52 ATTACHMENT 1
9 of 12
Remarks:
The technical functioning of the Tesla CHAdeMO adapter with CHAdeMO-certified charge stations is the responsibility of Tesla Motors.
Ordering e.g. via Tesla Webshop
Tesla CHAdeMO adapter
EV SUBMISISON 52 ATTACHMENT 1
10 of 12
Public and commercial car charging – use cases
Charging service should match charging application and demand
Public and commercial EV Charging
DC High PowerDC FastDC destinationAC destination
150 to 350kW+50 KW20-25 kW3-22 kW
10-20 min20-90 min1-3 hours4-16 hours
• Office, workplace
• Multi family housing
• Hotel and hospitality
• Overnight fleet
• Supplement at DC charging sites for PHEVs
• Office, workplace
• Multi family housing
• Hotel and hospitality
• Parking structures
• Dealerships
• Urban fleets
• Public or private campus
• Sensitive grid applications
• Retail, grocery, mall, big box, restaurant
• High turnover parking
• Convenience fueling stations
• Highway truck stops and travel plazas
• OEM R&D
November 27, 2017
• Highway corridor travel
• Metro ‘charge and go’
• Highway rest stops
• Petrol station area’s
• City ring service stations
• OEM R&D
EV SUBMISISON 52 ATTACHMENT 1
11 of 12
EV SUBMISISON 52 ATTACHMENT 1
12 of 12