Nov. 18 Council Meeting: Local Project Updates

14
Local Project Updates Nelson D. Nelson Public Works Director

Transcript of Nov. 18 Council Meeting: Local Project Updates

Page 1: Nov. 18 Council Meeting:  Local Project Updates

Local Project Updates

Nelson D. Nelson

Public Works Director

Page 2: Nov. 18 Council Meeting:  Local Project Updates

x

x

Electronic Speed Signs on Fairview DriveBetween Corydon Street and Country Club Lane

Page 3: Nov. 18 Council Meeting:  Local Project Updates

Paseo Grande ImprovementsNear Cesar Chavez Academy

x

xx

Crossing Guard

Flashing Stop Beacon

Flashing Stop Beacon

Traffic Manager

x

x

Access Gate

Page 4: Nov. 18 Council Meeting:  Local Project Updates

Pedestrian Safety Improvements Ontario Avenue and Kirkwood Drive

Page 5: Nov. 18 Council Meeting:  Local Project Updates

Before

After After

TreeRemoved

Crosswalks Re-Striped

Pedestrian Safety Improvements Ontario Avenue and Kirkwood Drive

Tree Obstructing View of Stop Sign

Faded Crosswalks

Piano Key Re-Stripe

Page 6: Nov. 18 Council Meeting:  Local Project Updates

Green River Widening Project• Signs posted fines doubled• Pavement widening by Christmas• Two lanes each direction while

completing project• Sidewalks done by Christmas• Medians & Landscaping thru

March 2016

Page 7: Nov. 18 Council Meeting:  Local Project Updates

Letter to AWJV

• Letter to AWJV regarding– No West Grand Boulevard Ramp Closures until other improvement s complete to accommodate traffic

– Main Street to be restriped from North Grand Boulevard to Fourth Street

– Main Street WB On-Ramp widened as discussed in MOT meeting last several weeks

– Lincoln Avenue widening traffic control be adjusted to work more efficiently

– MOT Sub-Task Force be set up to discuss specific issues of concern to the City

– Lane Closure Chart showing schedule of projected closures throughout limits of the Project

• AWJV has acknowledged our letter– West Grand Boulevard WB On-Ramp will not be closed until completion of widening of Main Street

WB On-ramp

– Main Street will be restriped by the end of this week

– Lincoln Avenue traffic signal timing has been adjusted for efficient flow of traffic

– MOT Sub-Task Force first meeting was held Tuesday, November 17th, will meet twice each month

Page 8: Nov. 18 Council Meeting:  Local Project Updates

SR-91 ProjectLincoln Avenue Work Zone

Page 9: Nov. 18 Council Meeting:  Local Project Updates

SR-91 ProjectLocal Street Sequencing

1. Grand Boulevard ramps remain open

Page 10: Nov. 18 Council Meeting:  Local Project Updates

1. Grand Boulevard ramps remain open2. Re-stripe Main Street to 3 lanes prior to final configuration – Late Nov.

SR-91 ProjectLocal Street Sequencing

Page 11: Nov. 18 Council Meeting:  Local Project Updates

1. Grand Boulevard ramps remain open2. Re-stripe Main Street to 3 lanes prior to final configuration – Late Nov.3. Restore Lincoln Avenue to all lanes – Early Dec.

SR-91 ProjectLocal Street Sequencing

Page 12: Nov. 18 Council Meeting:  Local Project Updates

1. Grand Boulevard ramps remain open2. Re-stripe Main Street to increase capacity – Late Nov. 3. Restore Lincoln Avenue to 3 lanes prior to final configuration – Early Dec. 4. New segment of Second Street to connect Vicentia Avenue to Lincoln Avenue-Early Dec.

SR-91 ProjectLocal Street Sequencing

Page 13: Nov. 18 Council Meeting:  Local Project Updates

1. Grand Boulevard ramps remain open2. Re-stripe Main Street to increase capacity – Late Nov. 3. Restore Lincoln Avenue to 3 lanes prior to final configuration – Early Dec. 4. New segment of Second Street to connect Vicentia Avenue to Lincoln Avenue - Early Dec. 5. Permanent closure of Grand Boulevard WB On-ramp – Mid Dec.

SR-91 ProjectLocal Street Sequencing

Page 14: Nov. 18 Council Meeting:  Local Project Updates

SR-91 ProjectModified Eastbound Off-Ramp at Maple Street

• EB Off-Ramp to Maple Street has been temporarily modified• Still connects to Maple Street at same location, entrance from 91 adjusted • Is separated by K-rail from Frontage Road• David Thomas will explain more about upcoming work

Temporary Off-RampConfiguration