Nov. 18 Council Meeting: Local Project Updates
-
Upload
city-of-corona -
Category
Government & Nonprofit
-
view
367 -
download
1
Transcript of Nov. 18 Council Meeting: Local Project Updates
Local Project Updates
Nelson D. Nelson
Public Works Director
x
x
Electronic Speed Signs on Fairview DriveBetween Corydon Street and Country Club Lane
Paseo Grande ImprovementsNear Cesar Chavez Academy
x
xx
Crossing Guard
Flashing Stop Beacon
Flashing Stop Beacon
Traffic Manager
x
x
Access Gate
Pedestrian Safety Improvements Ontario Avenue and Kirkwood Drive
Before
After After
TreeRemoved
Crosswalks Re-Striped
Pedestrian Safety Improvements Ontario Avenue and Kirkwood Drive
Tree Obstructing View of Stop Sign
Faded Crosswalks
Piano Key Re-Stripe
Green River Widening Project• Signs posted fines doubled• Pavement widening by Christmas• Two lanes each direction while
completing project• Sidewalks done by Christmas• Medians & Landscaping thru
March 2016
Letter to AWJV
• Letter to AWJV regarding– No West Grand Boulevard Ramp Closures until other improvement s complete to accommodate traffic
– Main Street to be restriped from North Grand Boulevard to Fourth Street
– Main Street WB On-Ramp widened as discussed in MOT meeting last several weeks
– Lincoln Avenue widening traffic control be adjusted to work more efficiently
– MOT Sub-Task Force be set up to discuss specific issues of concern to the City
– Lane Closure Chart showing schedule of projected closures throughout limits of the Project
• AWJV has acknowledged our letter– West Grand Boulevard WB On-Ramp will not be closed until completion of widening of Main Street
WB On-ramp
– Main Street will be restriped by the end of this week
– Lincoln Avenue traffic signal timing has been adjusted for efficient flow of traffic
– MOT Sub-Task Force first meeting was held Tuesday, November 17th, will meet twice each month
SR-91 ProjectLincoln Avenue Work Zone
SR-91 ProjectLocal Street Sequencing
1. Grand Boulevard ramps remain open
1. Grand Boulevard ramps remain open2. Re-stripe Main Street to 3 lanes prior to final configuration – Late Nov.
SR-91 ProjectLocal Street Sequencing
1. Grand Boulevard ramps remain open2. Re-stripe Main Street to 3 lanes prior to final configuration – Late Nov.3. Restore Lincoln Avenue to all lanes – Early Dec.
SR-91 ProjectLocal Street Sequencing
1. Grand Boulevard ramps remain open2. Re-stripe Main Street to increase capacity – Late Nov. 3. Restore Lincoln Avenue to 3 lanes prior to final configuration – Early Dec. 4. New segment of Second Street to connect Vicentia Avenue to Lincoln Avenue-Early Dec.
SR-91 ProjectLocal Street Sequencing
1. Grand Boulevard ramps remain open2. Re-stripe Main Street to increase capacity – Late Nov. 3. Restore Lincoln Avenue to 3 lanes prior to final configuration – Early Dec. 4. New segment of Second Street to connect Vicentia Avenue to Lincoln Avenue - Early Dec. 5. Permanent closure of Grand Boulevard WB On-ramp – Mid Dec.
SR-91 ProjectLocal Street Sequencing
SR-91 ProjectModified Eastbound Off-Ramp at Maple Street
• EB Off-Ramp to Maple Street has been temporarily modified• Still connects to Maple Street at same location, entrance from 91 adjusted • Is separated by K-rail from Frontage Road• David Thomas will explain more about upcoming work
Temporary Off-RampConfiguration