From: David Keith <[email protected]>Sent: Friday, June 19, 2015 3:09 PMTo: Miller, GarygCc: Dave Moreira ([email protected]); Phil Slowiak; Wendell Mears; Daleel Nangju; John
Verduin; John LaplanteSubject: San Jacinto June 19 Visual Armored Cap InspectionAttachments: SJCAP5.jpeg; SJCAP1.jpeg; SJCAP2.jpeg; SJCAP3.jpeg; SJCAP4.jpeg
Gary – As requested, Daleel Nangju, an engineer with Anchor QEA, performed a visual inspection of the armored cap at San Jacinto following the recent storm event and associated high water levels from the storm surge. The eastern cell of the northern impoundment remained underwater during the inspection due to tidal conditions; however, the exposed areas of the cap in the western cell and the berms remain intact, and appear the same as before the 6/16 rain event. The attached photos document some of Daleel’s observations.
As you know, we have full inspection scheduled for July. In the interim, please don’t hesitate to contact me if you have any concerns.
Thank you, David
David Keith, Ph.D., P.G., C.Hg. Anchor QEA, LLC 614 Magnolia Avenue Ocean Springs, MS 39564
Phone: 228‐818‐9626 Cell: 228‐224‐2983 [email protected]
ANCHOR QEA, LLC www.anchorqea.com Please consider the environment before printing this email. This electronic message transmission contains information that may be confidential and/or privileged work product prepared in anticipation of litigation. The information is intended for the use of the individual or entity named above. If you are not the intended recipient, please be aware that any disclosure, copying distribution or use of the contents of this information is prohibited. If you have received this electronic transmission in error, please notify us by telephone at (228) 818‐9626.