_ . . ' . SEP 131983 Docket No.: 50-412 Mr. Raymond E. Scott Mayor of Shippingport Post Office Box 3 Shippingport, PA 15077 Dear Mr. Scott: Subject: Nuclear Regulator" Commission (NRC) Staff Site Visit to Beaver Valley Power Station, Unit 2 (BVPS-2) and Public Meeting On September 28-29, 1983, the NRC staff will visit the Beaver Valley Site. This visit is part of the review process for the environmental impact statement associated with the recently docketed application for an operating license for Unit 2. Several Federal and State agencies are being invited to attend the visit and provide their input to the staff. The NRC staff has coordinated with Duquesne Light Company to have a brief introduction and site tour on September 28, 1983, and meeting with the utility and participating Federal and State agencies on September 29, 1983. The September 29, 1983 meeting will be open to members of the public who wish to attend as observers. In a separate, related matter, the NRC staff plans to have an open meeting with the public on the evening of September 28, 1983. This meeting is to provide a forum for any member of the general public to have direct access to the staff to identify environmental areas of concern. The NRC appreciates your kind offer to provide a suitable facility and moderate this meeting. The information below is provided for your use in making appropriate plans. 1. The date and time are September 28, 1983 from 7:00 pm to 10:00 pm. 2. An agenda is enclosed. 3. 10 members of the NRC staff are expected to be present. A roster of attendees is attached to the enclosed agenda. 4. The necessary seating capacity of the room will depend on the amount of public interest involved, from experience of past reviews a seating capacity of 100-150 should be appropriate. 8309290052 830913 PDR ADOCK 05000412 D PDR _ _ _ , _ ,

Transcript of Notification of NRC 830928-29 site visit & 830928 public ...

_

. .

'

.

SEP 131983

Docket No.: 50-412

Mr. Raymond E. ScottMayor of ShippingportPost Office Box 3Shippingport, PA 15077

Dear Mr. Scott:

Subject: Nuclear Regulator" Commission (NRC) Staff Site Visit to BeaverValley Power Station, Unit 2 (BVPS-2) and Public Meeting

On September 28-29, 1983, the NRC staff will visit the Beaver Valley Site.This visit is part of the review process for the environmental impactstatement associated with the recently docketed application for an operatinglicense for Unit 2. Several Federal and State agencies are being invited toattend the visit and provide their input to the staff. The NRC staff hascoordinated with Duquesne Light Company to have a brief introduction andsite tour on September 28, 1983, and meeting with the utility andparticipating Federal and State agencies on September 29, 1983. TheSeptember 29, 1983 meeting will be open to members of the public who wish toattend as observers.

In a separate, related matter, the NRC staff plans to have an open meetingwith the public on the evening of September 28, 1983. This meeting is toprovide a forum for any member of the general public to have direct access tothe staff to identify environmental areas of concern. The NRC appreciatesyour kind offer to provide a suitable facility and moderate this meeting.

The information below is provided for your use in making appropriate plans.

1. The date and time are September 28, 1983 from 7:00 pm to 10:00 pm.

2. An agenda is enclosed.

3. 10 members of the NRC staff are expected to be present. A roster ofattendees is attached to the enclosed agenda.

4. The necessary seating capacity of the room will depend on the amount ofpublic interest involved, from experience of past reviews a seatingcapacity of 100-150 should be appropriate.

8309290052 830913PDR ADOCK 05000412D PDR

_ _ _ , _ ,

. _ . - . - - - _ _ _ _ _ _ _ _ - _ _ - . -_ . - - . -

. .

'l

! -2-1.

5. A public address system will be necessary.

6. The staff will provide a transcription service.-

1

j Your support of this meeting will help insure that the environmental impact'

statement for BVPS-2 provides a complete and accurate assessment of theeffects of operation of the project on the environment. If you have anyquestions, or wish to discuss this matter in greater detail, you areencouraged to contact the NRC Project Manager, Lisamarie Lazo at (301)492-7791.

Sincerely,i

: Original signed hy:George W. Knighton

George W. Knighton, ChiefLicensing Branch No. 3Division of Licensing

Enclosure:As stated

j cc: See next page

J

'

DISTRIBUTIONDocument' Control'50-412:NRC PDRL PORNSICPRC System

:

LB#3 ReadingLlazoJLee

'

GWKnightonTMNovakAttorney, OELDJordan, IETaylor, IE

ACRS (16)

i

Llazc/yt[RDL:LB#3 D- 1c,GW hton

| 9//2/83 9/|y/83

- - . .. _ - . - - . . - - . .- . . _-_. - - . .-. - - - ..

-. - - .- - --

Beaver Valley*

: .*

~

' Mr. Earl J. Woolever -

Vice President, Nuclear CmstructionDuquesne Light CompanyRobinson Plaza Bldg. No. 2, Suite 210PA Route 60Pittsburgh, Pennsylvania 15205

cc: Gerald Charnoff, Esq. Mr. H. M. Siegel, Manager EngineeringJay E. Silberg, Esq. Beaver Valley Two ProjectShaw, Pittman, Potts & Trowbridge Duquesne Light Company1800 M Street, N. W. Robinson Plaza Building No. 2

4

Washington, D. C. 20036 Suite #120PA Route 60

Varin. Carter, Esq. Pittsburgh, Pennsylvania 15205Special Assistant Attorney GeneralBureau of Administrative Enforcement Mr. C. E. Ewing, Quality AssuranceExecutive House - Cth Floor ManagerHarrisburg, Pennsylvania 17120 Quality Assurance Department,

Duquesne Light CompanyMr. R. J. Washabaugh P. O. Box 186BV-2 Project Manager Shippingport, PA 15077Duquesne Light CompanyRobinson Plaza Building No. 2 Director, Pennsylvania EmergencySuite 210 Management Agency '

PA Route 60 Room B-151Pittsburgh, Pennsylvania 15205 Transportation & Safety BuildingHarrisburg, Pennsylvania 17120Mr. T. J. Lex

Westinghouse Electric Corporation Mr. Thomas GeruskyPower Systems Bureau of Radiation ProtectionP. O. Box 355 PA Department of EnvironmentalPittsburgh, Pennsylvania 15230 ResourcesP. O. Box 2053Mr. P. RaySircar Harrisburg, Pennsylvania 17120Stone & Webster Engineering Corporation

P. O. Box 2325 '

BVPS-2 Records Manacement SupervisorBoston, Massachusetts 02107 Duquesne Light CompanyPost Office Sox 4

Mr. Glenn Walton Shippingport, Pennsylvania 15077U. S. NRCP. O. Box 181 John A. Lee, Esq.-

Shippingport, Pennsylvania 15077 Daquense Light Cor;any1 0xford Sentre

Mr. R. Haynes, Regional Administrator 301 Grant StreetU. S. NRC, Region I Pittsburgh, Pennsylvania 15229631 Park AvenueKing of Prussia, Pennsylvania 19405 Ms. Susan L. Miatt -

OCRE RepresentativeMr. E. F. Kurtz, Jr. , Manager S275 Munson RoadRegulatory Affairs Mentor, Ohio 44060Beaver Valley Two ProjectDuquesne Light Company Dr. Judith H. JohnsrudRobinson Plaza Building No. 2 Co-Director and Legal RepresentativeSuite #120 Environmental Coalition on 'uc'. earPA Route 60 PowerPittsburgh, Pennsylvania 15205 433 Orla,dc Avenue

State College. Fennsylvania 15055

-_ __ --- __

. a . e r . a i i ey-

'' '

- - 2-, ,

.

fir. Ralph F. Walker1518 Fifth StreetNew Brighton, Pennsylvania 15066

Mr. George S. WhiteBox 58Shippingport, Pennsylvania 15077

Mr. William A. Lochstet119 East Aaron DriveState College, Pennsylvania 16801

Thomas D. Rees, Esq.Office of General CounselHarristown 2, 17th Floor333 Market StreetHarrisburgh, Pennsylvania 17120

Maxine Woelfling, Esq.Department of Environmental Resources505 Executive House

'P. O. Box 2357Harrisburgh, Pennsylvania 17120

*

.

.

,

e

Y

. ..

.

Nuclear Regulatory Commission Staff.

Environmental Review

Public Meeting

I. Opening remarks by moderator.

Moderator, Mayor Raymond Scott, introduces himself, welcomespersons attending the meeting and the NRC staff, and makes anyadministrative remarks to guide the conduct of the meeting.(ie. sign up sheet used to determine which persons desire toexpress environmental concerns to the staff, any breaks, specifylength of the meeting 7-10:00 pm, etc.)

II. Introductory remarks by the NRC Branch Chief for Licensing, George Knighton.

1. Explains the purpose of the meeting. (ie. The forum of the meetingis to provide any members of the general public to have direct accessto the staff to identify environmental areas of concern which havedeveloped or changed since the CP stage, what topics will not beentertained).

2. NRC Project Manager, Lisamarie Lazo summarizes the licensing processand where BVPS-2 is in the process. Introduce the NRC staff andallows each member of the technical review staff to briefy outlinetheir scope of the review for the BVPS-2 plant.

III. Through use of the sigr. up sheet the moderator determines which personsdesire to express er.vironmental concerns to the staff and invites themto speak consecutively, unless it is appropriate for a response from thestaff.

IV. Moderator maintains general order of the meeting.

V. Approximately 15 minutes prior to the end of the meeting, the moderatorterminates the public discussion with the staff. The NRC Branch Chieffor Licensing summarizes his assessment of the meeting.

VI. Closing remarks by the moderator.

. _ - . _- -

.

'

i.

!

NRC STAFF ATTENDANCE 70R PUBLIC MEETING.

,

Division of Licensing (DL)

George W. Knighton, Licensing Branch ChiefLisamarie Lazo, Project Manager

Environmental and Hydrologic Engineering Branch (EHEB)

Charles W. Billups, Aquatic ScientistGermain E. LaRoche, Senior Land Use AnalystJohn C. Lehr, Senior Environmental EngineerRaymond 0. Gonzales, Hydraulic Engineer

Accident Evaluation Branch (AEB)

Sarbes Acharya, Senior Radiological Engineer

Radiological Assessment Branch (RAB)

Tin Mo, Health Physicist

Site Analysis Branch (SAB)

Charles M. Ferrell, Site Analyst

i

.

- e w-- -1- - --3e-m -c,- - -- m. - - e e- - , ,--, , , , - ------- -- -- ,-----e ,+-- - - - - - , - . - -- - .