Notice of USPS decision consolidate destinating mail ... P&DF to Green Bay, WI P&DC was approved...
Transcript of Notice of USPS decision consolidate destinating mail ... P&DF to Green Bay, WI P&DC was approved...
Jul-22·2013 03:06PM USPS · HO · LABOR RELATIONS 202·268·6946
lABOR RELATIONS
~ UNITEDST.!lTES lX!:J POST/JL SERVICE
July 22, 2013
Mr. Cliff Guffey President American Postal Workers
Union, AFL-CIO 1300 L Street, N.W. Washington, DC 20005-4128
Dear Cliff:
Certified Mail Tracking Number: 7013 1090 0002 4435 0834
Fax: (202) 842-4297
This is to advise that the P.ostal Service has made a decision to complete the implementation of the previously approved Area Mail Processing (AMP) consolidation of the destinating mail processing operations for the Oshkosh, Wisconsin Processing and Distribution Facility (P&DF).
As originally approved, the Oshkosh AMP consolidation would have moved this mail to the Green Bay, WI Processing and Distribution Center (P&DC). However, the continuing financial condition and declining mail volume have required continued review and changes to some of our planned mail processing consolidations, as is the case with the approved Oshkosh AMP. As a result, rather than consolidating the destinating operations Into the Green Bay P&DC, it wilt be consolidated Into the Milwaukee, WI P&DC. It is anticipated that this consolidation will be completed this summer. The Oshkosh P&DF will be maintained as a parcel and bundle processing annex for north em Wisconsin and the Upper Peninsula of Michigan.
Enclosed for your review, and in accordance with the Non-Disclosure Agreement dated February 11, 2013, are both redacted and unredacted copies of the Feasibility Study.
Should this consolidation action result in employee reassignments, they will be made pursuant to applicable law, the collective bargaining agreements, and Postal Service regulations and policies.
If you have questions, or need additional information, please contact Rickey Dean at extension 7412.
(""'~Patrick . /114 Manager
Contract Administration (APWU)
Enclosures
475 ~ENFANT~ SW
WASHiNG'I'ON DO 20260-41 Oi \WAN.IJ$F>e,COM
1/94
Jul-22·2013 03:06PM USPS · HQ · LABOR RELATIONS 202·26
Type of Distribution to Consolidate:! Destinating Facility Name & Type:! Oshkosh P&DF
Street Address:! 1025 W20th Ave I
Clty:l Oshkosh I
State:1 WI 50 FacUlty ZIP Code:j 54902
District:) Lakeland Area:• Great Lakes
Finance Number:! 566285 Current 3D ZIP Code(s):! 549
Miles to Gaining Facility: I 64.5 EXFC offlce:i Yes
Plant Manager: j Evonne L. Hraban Senior Plant Manager: j Charles A. Sciurba (A)
District Manager: • Steven E. Wenzel Facility Type after AMP:~ P&DC/F
Facility Name & Type:! Milwaukee P&DC Street Address: I 345 W Saint Paul Ave
City:i Milwaukee State:i WI
50 Facility ZIP Code: t 53203 District: • Lakeland
Area:! Great Lakes Finance Number:! 565481
Current 30 ZIP Code(s): I 530-532, 534 EXFC office:j Yes
Plant Manager; l Charles A. Sciurba (A) Senior Plant Manager: j Charles A. Sciurba (A)
District Manager:: Steven E. Wenzel
Start of Study: 05/20/13
REDACTED
MODS/BPI Office
Date Range of Data: Jan-01-2012: Dec-31-2012 Processing Days per Year: 310
Bargaining Unit Hours per Year: 1,753 EAS Hours per Year: 1,828
Date of HQ memo, DAR Factors/Cost of Sorrowing/New Facility Start..up Costs 11/01/12
Update
Date & Tirne this workbook was last saved: I 7/8/2013 11:40
Area Vice President:: Jacqueline Krage Strako Vice President, Network Operations:! David E Williams
Area AMP Coordinator:! Nancy Schoenbeck HQ AMP Coordinator:! Barbara Brewington
Package Page 1 AMP Data Entry Page
Jul-22·2013 03:07PM USPS · HQ · LABOR RELATIONS 202·268·6946
Fa.oU~ ZJP Coelt: · Flliuli\9 f\fUt&'lbtr:
Cu~30ZIPI!~$l:..:=,::;__ _____________________ . ____ _
Ty~of Oltirll:u.ttlon to CG!Isolldtlt~: .:Oiclln:=:;;*;:.;;tln~tS------.,...._.
-ilft.nt· F1~1ity !llama and TJPfl: ~Ret A4ifdNf&11
City,! _.Ct.! f'IIOUity liP ~In Jfn~UJ~W Muntl;lvr.
Qumuat 3D ZIP eodtft.l:
Lqi!Ni EAC!j.!TY;.
Postmaster or Plant MMJ19tn
__ ~_w_,_~-~~-4_;:_H_~~~b~~'~~~~---"-·------~··~~~~~~:;~~~::--Senior PllntMirJa"Qw:
Ct11mea A Scturba rAt
IUINI!ltt,!MQlL!tf'i
Pltnat'lbnager: ~;hillltiS A Sc;~urb.i v\1
Pr!liiil'Gi Settlot ·Plane M&n~g•:
t:hlllfle:ti A &l.lutba CAl
Diltrtct Manager: Steven E. Wont&~
~~~~~~~~~.~~~~=----------}~~~Ud~~i!~~~-----------
Area YIGe PAisideot ;~I"'' Krt1ge Sttako
Vict Prttldtnt. N~ork Optnrttfotmt OS1111d t-: William$
i¥i'iiti Nat~;' u • a w•
0~:0
~~~--------------------------------------------___________________ ._ .... _·=----~ AMP Aj)PfOY'I SlgMatl.ftS
4/94
Jul-22·2013 03:07PM USPS · HQ · LABOR RELATIONS 202·268·6946
Executive Summary Last Saved: July a, 2013
Losing Facility Name and Type: Oshkosh P&DF Street Address: 1 025 W 20th Ave
City, State: Oshkosh, WI
Current 30 ZIP Code(s): 549
Type of Distribution to Consolidate: Destlnatlng Miles to Gaining Facility: 64.5
Gaining Facility 1\!amG and TypG: Milwaukee P&DC Current 30 ZIP Code(s): 530·532, 534
Savings/Costs Mail Processing Craft Workhour Savings = ___ ___:.($.;..0..:.} from Wart<nourCo$ts-PtofiOM!d
Non-MP Cra1tiEAS + Shared lbCs Work hour Savings (less Malnt/Trans) = $1 08,282 from Other Curr vs Prop
PCES/EAS Supervisory Workhour Savings = $216,273 from OtherOurrV3Prop
Transportation Savings = $26,953,216 from Transportation (HCR and PVS)
Maintenance Savings = $551,643 from Me/ntenarn;e
Space Savings = $0 ft(lm Spt~C$ EviitfuatiOI! and Otllfl'll' Costs
Total Annual Savings"" $27.829,414
Total OnewTime Costs == $1 ,483,000 from Space Evaluation artd Oth81' Costs
Total First Year Savings ;;; $26,346,414
Staffing Positions
Craft Position Loss = __ ..:.4;::;..6 -~ from Sf11fflng • Cr8ft
PCES/EAS Position Loss = __ j...,.8),__ from st<lffin(l • PCESIEAS
Volume
Total FHP to be Transferred (Average Dally Volume) = 0 from Worlrhour Com· Cvmmt ____ _;;...
Current FHP at Gaining Facility (Average Dally Volume) := ____ ...;0::... from Workhour 0011te • Oummt
Losing Facility Cancellation Volume (Average Daily Volume) = Service
Service Standard Impacts byADV
First-Class Mall® Priority Mall®
Package Services Periodicals
Standard Mail Cod~r to destination 3-dlglt ZIP Code volume Ill not
lilii$11Sb1Et
Package Page 3
296,450 ('"Total TPH I Operating Oiiiye)
AMP Executive Summary
5/94
Jul-22·2013 03:07PM USPS · HQ · LABOR RELATIONS 202·268·6946
Summary Narrative Last saved: July 6, 2013
losing Facility Name and Type: Oshkosh P&DF Current 30 ZIP Code(s): 549
Type of Distribution to Consolidate: Destinating
Gaining Facility Name and Type: Milwaukee P&DC Current 30 ZIP Code s : 530-532, 534
Background; The Oshkosh, WI Processing and Distribution Facifity (P&OF) Is a postal owned facility that prior to October 2011 processed originating and destinating mail volumes for SCF 549. An Area Mail Processing (AMP) proposal to move originating and destlnatlng volumes from Oshkosh P&DF to Green Bay, WI P&DC was approved March 21, 2011. The originating mall processing operations moved to Green Bay P&DC in October 2011:
A deviation request was submitted to modify the Oshkosh P&OF lnto Green Bay P&DC AMP originating and destinating consolidation by converting it to an originating AMP only, initiate a study to move SCF 549 desttnatlng volumes to Milwaukee WI P&PC, and to maintain the Oshkosh P&DF as a parcel and bundle annex for northern Wisconsin and the Upper Peninsula of Michigan. The approval of the deviation request was contingent upon updated AMP workbooks for Oshkosh volumes.
This workbook provides the business case for transferring all destlnatlng letter and flat mail processing and distribution operations from the Oshkosh WI P&DF to the Milwaukee, WI P&DC, which services the 3 digit SCFs of 530 - 532, and 534. Express, Priority, and all other parcel products will remain In Oshkosh. This workbook provides the workhours and staffing for the Oshkosh volumes only. Workhours and staffing for the parcel volumes for the northern Wisconsin and Upper Michigan Peninsula sites are beyond the scope of this workbook.
Financial Symmarv; Financial savings proposed for this consolidation of Oshkosh destlnatlng operations Into Milwaukee are:
Total Annual Savings Total One-Time Costs Total First Year Savings
$3,140,350 ($1 ,483,000) $1,667,360
Customar and Service Considerations:
In addition to mall processing operations, the Oshkosh P&DF houses a retail unit, a box section, a Business Mail Entry Unit (BMEU), and administrative offices. The retail unit, box section and BMEU will all remain at the Oshkosh facility at this time.
Specific service standard changes associated with this Area Mail Processing consolidation are contingent upon the resolution of both (a) the rulemakfng In which current market dominant produot service standards In 39 CFR Part 121 are being evaluated, and (b) all remaining AMP consolidation proposals that are part of the same network rationalization initiative. A complete file reflecting any new service standards will be published at www.usps.com once all of the related AMP decisions that provide the foundation for new service standards are made. Priority and Express Mall service standards will be based upon the capability of the network.
Package Page 4 AMP Summary Narrative
6/94
Jul-22·2013 03:07PM USPS · HQ · LABOR RELATIONS 202·268·6946
Summary Narrative (continued) Summary Narrative Page 2
Transportation Changes: The Oshkosh P&DF will be used as a consolldatlon and transportation dispatch hub as well as becoming a parcel and bundle sorting facility. Thera Is no change to PVS.
HCR 530NO added three (3) roundtrips for collection mail from Oshkosh to Milwaukee and return DPS mail for a cost of $229,911. Total transportation costs in the Oshkosh to Milwaukee package are $45,428.
Staffing Impacts: Movement of mail will have an impact on staffing and will require movement of personnel. A total of 49 FTE Function 1 and 13 FTE Function 38 positions will be reduced at Oshkosh by this mall move. Milwaukee will realize a reduction of 3 FTE in Function 1 due to operational efficiencies. The facility will require an increase of 3 FTE in Function 38 to maintain the additional equipment, however additlonal positions are shown at Milwaukee due to HQ Maintenance review and the addition of maintenance staffing for stations and branches.
A net total of 46 craft positions will be reduced as a result of this AMP. The mail processing employees remaining at Oshkosh will handle the consolidation and transportation dispatch hub as well as the Express, Priority, and all other parcel and bundle products remaining in Oshkosh.
The proposed AMP will result in changes in EAS workhours In Oshkosh. There will be a reduction in authorized positions: one Manager Distribution Operations, two Supervisor Distribution Operations, two Operations Support Specialists, one Administrative Assistant, and three Supervisor Maintenance Operations. There is a decrease of 4 EAS authorized positions in Milwaukee due to the applicable ratios: two Supervisor Distribution Operations, and two Supervisor Maintenance Operations. Due to the large number of EAS vacancies, the AMP results in net increase relative to on rolls and decrease to authorized.
As a matter of policy, the Postal Service follows the Worker Adjustment and Retraining Notification Act's ("WARN") notification requirements when the number of employees experiencing an employment loss within the meaning of WARN would trigger WARN's requirements. Some or all of the impacted employees described above may not experience an employment loss within the meaning of WARN due to transfers or reassignments.
Package Page 5 AMP Summary Narrative
7/94
Jul-22·2013 03:08PM USPS · HQ · LABOR RELATIONS 202·268·6946
Summary Narrative (continued) Summary Narrative Page 3
1 Cr&ft "' Function 1 employees
§qulpment Relocation and Maintenance Impacts: One (1) APBS will be transferred from Green Bay P&DC to the Oshkosh P&DF with a total relocation cost of $80,000. One (1) 76 stacker LIPS will be transferred from Wausau, WI P&DF, one (1) 70 stacker LIPS will be transferred from Kingsford, Ml P&DF to the Oshkosh P&DF with a total relocation cost of $60,000. Five (5) DBCS will be needed in Milwaukee to process the destinating Oshkosh volumes. The relocation cost of this equipment is $75,000.
Total proposed annual Maintenance savings Is $551,643 and Includes additional maintenance positions at Milwaukee to service stations and branches.
Space Impacts & One~ Time Costs; The total Interior square footage of the Oshkosh P&DF Is 101,789 sq. ft. Over 10,000 sq. ft. is currently utilized for retail, box section, and BMEU operations.
Facility Costs for Milwaukee: Removal of the Inactive medical unit to allow for additional floor space to accommodate for the expansion of stackers on existing DBCS will be needed. Estimated cost is for this unit removal Is $175,000.
Facllltv Costs for OJhlsosh: In order to accommodate the transition to a parcel sorting facility in Oshkosh, a major facility renovation Is required. This Includes the removal of all mall processing equipment, with the exception of the LIPS, from the Oshkosh facility. Substantial building and structural work Includes but is not limited to:
o Demolish 1st floor area under mechanical penthouse. o Construct new locker rooms and restrooms o Repair walls & floors. o Repair/replace AHU, provide new space humidifiers, upgrade building control system,
replace fan motors and add VFDs for efficient operation. o Remove/replace all fire alarms and rewire so system Is still operable. o Refinish floor to match existing 10 Inch height difference (build out concrete platform
to accommodate fork lift movement and form new eloped access ramps to/from both building sides)
o Remove north wall of Tool & Parts o Remove walls In the center of the building and re-support the mezzanine above.
Package Page 6 AMP Summary Narrative
8/94
Jul-22·2013 03:08PM USPS · HQ · LABOR RELATIONS 202·268-6946
Summary Narrative (continued) Summary Narrative Page 4
o Relocate Tool & Parts to room 189. • Demolition of power to existing DBCS, LMLM, ASFM, AFCS, LIPS, and SDO platform. • Relocate two transformers and lighting relays to accommodate architectural work. • Install power drops for new APBS. Relocate 5 electrical power panels. • Perform necessary modifications to the Siemens feed systems on both of the
relocated APBS. o Redistribution of existing and installation of new Maintenance and Administrative LAN
connections. • Purchase/design SWYB platform and purchase conveyor system to transport product
up to employees to sort off into containers.
The FSO has calculated the cost range of the above scope at $750,000.
Additional costs In the facility are: " $323,000 for the removal of the LMS from Oshkosh
Total Facllltv Costs: The total one time costs for Milwaukee and Oshkosh include, $235,000 in MPE relocation listed in the AMP package, $175,000 for medical unit removal, $750,000 itemized in the Oshkosh portion of this document along with the additional $323,000 for the LMS removal from Oshkosh. Total cost equates to $1,483,000.
Other Concurrent Activities The movement of the Oshkosh destlnatlng malls will allow the Oshkosh building to be retooled to become a parcel processing facility for northern Wisconsin and Upper Michigan. This increased area includes all parcels for the 498, 499, 541-545 and 549 ZIP Code areas. The Milwaukee Mail Priority Annex will continue to process bundles and parcels for ZIP Codes 530-532 and 534.
The movement of the originating 549 Oshkosh mail from Green Bay will allow for the implementation of the approved AMPs of Wausau, WI and Kingsford, Ml originating and destinating mail to move into Green Bay without Increased expansions. The originating Wausau is expected to consolidate In the summer of 2013 with the destlnatlng volumes moving February of 2014.
The new parcel and bundle processing annex will provide the Lakeland District with better response during the fall and holiday mailing seasons, and for the growth in the parcel and package business which we have witnessed over the last year, and anticipate will continue to grow in the future. In order to be efficient at processing the parcel volumes, additional staffing beyond the scope of this AMP is required.
Conclusion: The AMP proposal to process destinatlng mall volumes from Oshkosh P&DF to Milwaukee P&DC shows a net savings of 46 FTEs. This proposal will also allow for the opportunity to proceed with the Oshkosh parcel processing annex.
Oshkosh will be retained as a transportation and collection hub for the SCF 549 offices. The 549 originating volumes from Green Bay P&DC will be re-directed to the Milwaukee P&DC.
Package Page 7 AMP Summary Narrative
9/94
Jul-22·2013 03:08PM USPS · HQ · LABOR RELATIONS 202·268-6946
Summary Narrative (continued) Summary Narrative Page 5
All collection trips that currently go to the Oshkosh P&DF will continue with letter and flats going to the Milwaukee P&DC.
This workbook provides the workhours and staffing for the Oshkosh volumes only. Workhours and staffing for the parcel volumes for the northern Wisconsin and Upper Michigan Peninsula sites are beyond the scope of this workbook.
The first year savings of this package Is $1,667,350 with a one time cost of $1,483,000. Thereafter, annual savings will be $3,140,350.
Package Page 8 AMP Summary Narrative
10/94
Jul-22·2013 03:08PM USPS · HQ · LABOR RELATIONS 202·268·6946
24 Hour Clock Last Saved: July 8, 2013
Losing Facility Name and Type: Oshkosh P&DF Current 30 ZIP Code(s}: 549
Type of Distribution to Consolidate: Destinating
Gaining Facility Name and Type: Milwaukee P&DC Current 30 ZIP Codes: 530-532, 534
Package Page 9
11/94
AMP 24 Hour Clock
Losing Facility Name and Type: Oshkosh P&DF Cummt 3D ZIP Code(s): 549
llll.lles to Gaining Faclity: 84.5
Gaining Facility Name and Type: Milwaukee P&DG Current 3D ZIP Cod'e{s}: .530-532, 534
Package Page 10
MAP last Saved:. .u, 8. 2013
AMP MAP
<..... c -' . N N
N 0 I-' w 0 w 0 co -o 3:
c: (./) -o (./)
:I: 0
);: c:x:l 0 ::0
::0 rr1 r ~ ........ 0 z (./)
N 0 N . N
"' co . "' '-.0 .+::>
"'
I-' N ........ '-.0 .+::>
Service Standard Impacts Last Saved: July 8, 2013
Losing Facility: ....:O:;...;s;.;..h;.;.;;ko.;;.;s;.;.h.;...;P;.....&;;;;.;D;;;..F;,__ ________________ _
Losing Facility 30 ZIP Code{s}: ~5~49::--=~~~--------------------Gafnlng Facility 30 ZIP Code(s}: 530-532, 534
---~------------~----------------------
Based on report prepared by Network Integration Support dated: 6/26/2013
~- Periodical and Standard mail ori:ain 3,-diait ZIP Code to destination 3-digit ZIP Code volume is not available Selected summary fields are transferred to the ExeGUfive Summaty
Package Page 11 AMP Service Standard Impacts
c.... z: --' . N N
N 0 1-' w 0 w 0
'"' ""0 3':
c </) ""0 </)
.5
s; OJ 0 ;::o
;::o rr1
~ ....... 0 :z </)
N 0 N . N 0'1 co . 0'1
"" ..j::>. 0'1
1-' w
' "" ..j::>.
Jul-22·2013 03:09PM USPS · HQ · LABOR RELATIONS 202·268·6946 14/94
Stakeholders Notification (WortBook T1b NotlfloatiOr'l· 1) Laat Saved; July a, 2013 Sblktmck:ler NOtlftcation F'age 1
Loelng F•clllty: Q~i\kc:: .. -.-... :::~ .. :~ .. : .... :. _:::.::.:.:..., .. _ .. ~"·-···-· ..... _ .......... -... ,..-..................... ··-············-············· ··-·"· AMP Event; ..... !t.!!t?!~~.~.c!Y ..
Pac:kagt Page 12
Losing FacUlty: Oahkos!l P&OF
Dale Rimge of~ 111J1)1/1::! <-' =-» 12t:tllt:!! . 'f . .. ar-
FunctJon1 Functioo 4
"" ""' tt $42.111 41 $10.!10
12 :$41l.BG 42 $0.!10
t3 $113..71 4 $10.110
N $4&.96 44 $0.!10
t5 $3B.1&l ~5 $0.!10
u ~DJJI) 46 $0.!10
u $39..73 41' $0.!10
fB $311.(11 48 __ $10~
P:ad:age Page 13
Workhour Costs ~ Current last SaYed; July 6, 2.013
Gaining Facllil)r: Mllwaukee P&DC
! I ; I )
J I ] """"' ] 403 J 400 ) 484 ) 4B4dup ] 620 1 630 I ] 4!19 ) 894 ) 6$ J B96dUD I J,~JB J; 919 r· 91Bdup J -·-. ""
. Fuootion1
"" 11 $42-!l 12 $45.1ll
13 $36.03
14 ~ 15 $37.21
18 $0.00
17 $42.42
18 $Ml.M
. lliG
FUl'ICtion 4 J
4' $!Mil)
42 $!Mil) 43>r--·---$-~
44 $1M1~
45 $1M)~
46 liMID 4l' $1).01)
48 $D.O!l
AMP Wotkhour Costs- Current
c.... c __,
N N . N 0 1-' w 0 w 0 1..0
'"0 3:
c: Ui '"0 Ui
:::c 0
s; OJ 0 ::0
::0 fT1
~ ...... 0 z Ui
N 0 N . N 0"1 co . 0"1 1..0 +:>-0"1
1-' 01
' ·-o +:>-
Jul-22·2013 03:10PM USPS · HQ · LABOR RELATIONS 202·268-6946 16/94
:t
l -++++++-1-1-++l-+++++-H-+++H-H-H-++++-t-H--t-H-H-t-H-t-t-t-t-t-i--r-H J
Package Page 15 AMP WoriJ10ur COS'!!> - Current
c.... :C --'
N N . N 0 ...... w 0 w ...... 0
'"0 :::3::
c: (./) '"0 (./)
:c 0
~ OJ 0 ;::1::1
;::1::1 il"'1
~ ,_, 0 z (./)
N 0 N . N O"l co . O"l \0 -!:» O"l
...... ""-J ........ \0 -!:»
Jul-22·2013 03:10PM USPS · HO · LABOR RELATIONS 202-268·6946 18/94
Jul-22·2013 03:10PM USPS · HQ · LABOR RELATIONS 202·268·6946 19/94
Jul-22·2013 03:10PM USPS · HQ · LABOR RELATIONS 202·268-6946 20/94
losTng Facility: Oslilc<M;h J>&DF
Package Page 19
Workhour Costs - Proposed Last Saved: July 8, 2013
Gaining Facility: Milwauke~ P&DC
AMP Workhour Costs -Proposed
c._, :;::: --'
N N . N 0 1-' w 0 w 1-' 0
'"'0 3:
c U') '"'0 U')
::::c 0
s;;: co 0 ;:t:l
;:t:l rr1
~ ........ 0 :z U')
N 0 N . N 0)
co . 0) <.0 .p;. 0)
N 1-' ....... <.0 .p;.
Jul-22·2013 03:10PM USPS · HQ · LABOR RELATIONS 202·268·6946 22/94
Proposed I Propos.ed operatlon lvlnua1 FliP
Package Page 2.1
Proposed Annt1al TPH or
Proposed Ani!UIII
Proposed Producti\lity
(6) Propll&l!d
Annual Proposed I Proposed O~n Annual FHP
P!'0p01141d lvlnual TPH or
PI"'fl''OSed Anl!l£8l
Proposed Produr:tlvlly
Propo!lif!d Annt1al
AMP woomour Costs -Proposed
L c --'
N N . N 0 ...... w 0 w ...... ...... -o 3:
c: {./) -o {./)
::::c 0
j; CD 0 ;;:t:J
;;:t:J rr1 r-~ ........ 0 :z {./)
N 0 N . N 0"\ 00
0"\ \0 ..j::>. 0"\
N w ......_ \0 ..j::>.
Jul-22·2013 03:11PM USPS · HQ · LABOR RELATIONS 202·268-6946 24/94
IIIII 1111111111111111111~ 11111111111111
I. . I
.
II
l I
s i
I . .
I I 1
: I I I
11111111111111111111111111111111111111111111111111111111111
PI'Ofi'O'SGdl PI"'O""'''ld Opemion AnnW!I fliP
Package Page 23
Proposed Amruill Tl'H or
Propoood Annual
Proposed Productlvitv
Propasad AnrwaJ
AMP Wortoour Costs - Proposecl
c.... c --'
N N . N 0 1-' w 0 w 1-' 1-'
'"'0 3:
c Vl '"'0 Vl
:::r: 0
s;: c:xJ 0 :::0
:::0 ,.,.,
~ ~
0 :z Vl
N 0 N . N 0'> 00 . 0'> <.0 ..j:::o 0'>
N Cl ........ <.0 ..j:::o
Jul-22·2013 03:11PM USPS · HQ · LABOR RELATIONS 202·268·6946 26/94
(t) (2) f.ll (4) (1>) (G) Proposed Proposed Pwopcsed Pl'Opllllied Proposed Pmpos.ed Opersflon AnnuaiFHP AnntJ;al TPH or Aomlal ProdtJCIIYII.y Allm.lal tlumlleJS '1/a!llme NA TPH V<Jiu!nlt Woriftrurs ClPH Ill' 1\lATPHI , \lfodlhOIIf Cosls
Comblood Current Annual Woltllour Cost : $0 {This l'lllf1¥lar hrougllt foJwan:l iiom ~ CoSI'B- Cum!flt}
Proposed Annual Workhour Cost : $0 {Tdal Clf Co0tv1s 6 aml1:2: oo lhl$ pagaJ
Minimum Function 1 Woftlhour Savings : $0 {Tl1is oomber represenls :PfOposed warldloor sa'Ot!gs \\ilh IIIJ produclion"!Y improwmem!
<~~~Plied io <JPet.alioQS at 1'-e galr*!g fa.cjjl)')
Funclion1 Workllol.u' Savings : ($(!) .. __ _ OlliS mmser equdslfle dlm!llllll:le In !Be o;men~ and proposed 'Wlllldlo~ cosll'
aboue and is mllll!d fll('l,lllf;d 1o lhe&ecufiora Swnmaoy)
Package Page 25
(7) {3} ~9) (10) Propos41d Prop~M<ed Propo900 Proposed Oper.ll[cn Annual FHP lumual TPH or Armual Nwlber.s Voii!Rle NATPH V<Jiumeo WIII'Kflours:
(11} (12) Proposed Proposed
Producftvil.y AnllUIII {TPH or 141\TPitl _WOl'ldloi!f~
AMP Wmldmur Costs - Proposed
c.... :;.:::: __,
N N . N 0 ....... w 0 w ....... ....... ""'0 3:
c (./) ""'0 (./)
a s;: c;c 0 :;:l::l
:;:l::l iT"1 I
~ -0 :z: (./)
N 0 N . N 0"> 00 . 0"> \0 ..j:::>. 0">
N -...,)
' \0 ..j:::>.
I Ottler Worth~-~ ~e Analysis - ·---~--· ---- --,
--·-· J!t¥3,211'13 ~Fiu:iily:: OsbllaorAIP&DF Galnilg F.-,.:.lllllwiUea P&llC lllliltllattll>afDIII'IIr: 011011'12 Ill ...!'12mfi22>!.J~-----
Pact.ageF'age2S AMP Other Curr vs Prop
<...... s:: __. . N N . N 0 f-lo w 0 w f-lo f-lo
""0 3:
c: Vl ""0 Vl
::J: 0
);: o:::l 0 ~
~ rr1 r ~ ....... 0 :z: Vl
N 0 N . N 0"1 co . 0"1 \.0 ..j::o. 0"1
N co ......... \.0 ..j::o.
Jul-22·2013 03:12PM USPS · HQ · LABOR RELATIONS 202·268·6946 29/94
Jul-22·2013 03:12PM USPS · HQ · LABOR RELATIONS 202·268·6946 30/94
Jul-22·2013 03:12PM USPS · HQ · LABOR RELATIONS 202·268-6946 31/94
I Grouped Subtotals for Transportation, Maintenanoe, Supervision & Flow Adjustments, along with Facility and CombkJe-dSUmml:iiies~---~ I
~ ~ Ops::::r II II
Pact;age Page 30
[:;:) ....,._ ..... OpsU.fl.IIi'!I.Ops"llil6,.1116 I · Ill I lips:;:::! II II Opsll11.--1'>11 Ops"llil6,.:116&13'fl
---1
-~
AUP Othef"Gurr !l5 Prop
<..... ::::: --' . N N . N 0 f-1 w 0 w f-1 N
-o 3:
c (./') -o (./')
:I: 0
s; C1J 0 ;;c:J
;;c:J rr1
~ ....... 0 z (./')
N 0 N . N 0"\ co . 0"\ <..0 ~ 0"\
w N ........ <..0 ~
Current- Combilled
"TlU.C'riiJ\'Ops[nd81] lD3..:5"rB'\1 "'' ,~ Tmn........,an Ops [nun 2] 11E.578 ~· --~·
Malnl-.e Dps [nile 3J 1J I
~o., 0 s.p..,!Cmt.Minl Opo (p.... 0
Total -
LDC
ltofs8:; 'lf.ft:lseg (.)(:$ gdf'llilltl 'l•ns-f"JS" &.,~IIDI'"7•tm
2i>IJ'ill9 .. , .. m'P\!Siah Sj,P:ngloM ..... ...,I ...
<IIII=CVO!J<ir,g'II>'Viii_T.,.
PacbgePB1J11131
1.00
Summary by Sub-Group Specia!Mjus!menls
ContJbed·
AraualWM:hua I h1rm.l Dl1in:
0 $II !II S9 ol so Ol $0 !II $0 ill $D
mg::~~-::0;;-~~f@:RjffZZ~
AMP 01he.r Gurr vs Prop
<..... s:: --'
N N . N 0 1-' w 0 w 1-' N
"'0 3:
c V'J "'0 V'J
:::c 0
s;;: OJ 0 :;:10
:;:10 rr1 ;-
~ 1-1
0 ::z V'J
N 0 N . N 0) Q:) . 0) <.0 -t::>o 0)
w w ......... <.0 -t::>o
Jul-22·2013 03:12PM USPS · HQ · LABOR RELATIONS 202·268·6946 34/94
Staffing • Management Last Saved: July 8, 2013
Losing Faciliey: ....;.O..;..sh_k_os_h_P_&_DF ____ -==----:o:o-----=---'"'!':'!"! Data Extra¢tion D11t.: 03106/13 Finance Number: 566285 ------
Management Positions (1) (2)
l Cur~~~ Auth (4) (5) {8)
Line Position Title L.eval Staffing On-Rolls s~:ffi~~" Difference
1 MGR I:)A/'\t"!I=~Ji::(h!utLJJ<:) 1 ~IBUTION F'CL TV EAS-24 1 1 1 0
2 IMGR utl:! (RIB UTI ON OPERATIONS EAS-19 1 1 0 -1 3 MGR MAI~TENANCE ~S-19 1 1 1 0 4 !OPERATIONS Sl.. - ; I ~DI:I"'IA 1ST EAS-17 2 2 0 -2. 6 SUPV DISTRIBUTION OPERATIONS EAS-17 4 ' ,,;;:ll:l'iiJ:':l' 2 0 e SUPV MAlNTENllt..!CE OPERATIONS EAS-17 3 • 0 -1 7 ADMIN I;:; ri'V\ iiVE ASSISTANT (FI.D) E:AS-12 1
·'
0 0 8 '
9 10 11 12 13 14 15 16 17 18 19 20 21
22 23 24 25 26 27 28 29_ 30 $1 32 33 34 35
l~ 37 38 39 40 41 42 43 44
Package Page 32 AMP Staffing - PCES/EAS
Jul-22·2013 03:13PM USPS · HQ · LABOR RELATIONS 202·268·6946 35/94
45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 as 67 as 69 70 71
. 72 73 74 75 76 77 78 79
Totals 13 8 4 (4)
Retirement Eligibles: 2 Position Loss~ 4
Package Page 33 AMP Staffing - PCES/EAS
Jul-22·2013 03:13PM USPS · HQ · LABOR RELATIONS 202·268·6946
Gaining Facility: Milwaukee P&DC Data Extraction Date: 03!05/13 Finance Number:
Management Positions
Line
(12)
,Position Title 1 SR PLANT MANAGER (1) 2 MGR IN-PLANT SUPPORT 3 MGR MAINTENANCE (LeAD) 4 SR MGR DISTRIBUTION OPERATIONS 5 MGR DISTRIBUTION OPERATIONS 6 MGR MAINTENANCE OPE·RATIONS 7 MGR. DISTRIBUTION OPERATIONS 8 OPeRATIONS INDUSTRIAL ENGINEER (Fl 9 MGR TRANSPORTATION/NETWORKS
1 0 OPeRATIONS INDUSTRIAL eNGINEER (FI 11 MGR MAINT ENGINEERING SUPPORT 12 MGR MAINTENANCE OPERATIONS SUPPT 13 OPE:RATIONS SUPPORT SPECIALIST 14 MAINTENANCE ENGINEERING SPECIALIST 15 MGR DISTRIBUTION OPERATIONS 16 MGR FIELD MAINT OPRNS (LEAD) 17 OPERATIONS SUPPORT SPECIALIST 16 OPERATIONS SUPPORT SPECIALIST 19 SUPV DISTRIBUTION OPERATIONS 20 SUPV MAINTENANCE OPERATIONS 21 SUPV MAINTENANCE OPERATIONS SUPPOR 22 SUPV TRANSPORTATION OPERATIONS 23 ADMINISTRATIVE ASSISTANT (FLO) 24 25 26 27 28 29 30 31 32 33 34 35 36 37 36 39 40 41 42 43 44 45 46 41
Package Page 34
(, :3)
Level
POES-01 eAS-25 EAS-26 EAS-25 EAS-24
EAS-22
E!AS-22 EAS-21 EAS-21 EAS·20 EAS-20
EAS-20
EAS·19 EAS-19 EAS-19
EAS-18 EAS-17
EAS-17 EAS-17
EAS-17 EAS·17
EAS·12
(14) (1 S) Current Auth Current
Staffing On-Rolls
1 1 1 1
2 2
3 3 1 1 2 2
1 1
1 , ··II: .. 1 1 1 1 1 1 2 2 1 1 1 1 7 7
1 1 3 3
565481 --------
(17) (16) Proposed Staffing
Difference
0
0 1
2 0 3 0
0 2 0
0
0 0 0
2 0
0 0
7 0 32 6
9 0
a 0
AMP Staffing ~ PCt:S/EAS
36/94
Jul-22·2013 03:13PM USPS · HQ · LABOR RELATIONS 202·268·6946 37/94
48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 es 69 70 71 72 73 74 75 76 n 78 79
Total 79 63 75 12 ..
Retirement Ehg1bles: 30 . . Pos1t1on Less~ (12)
Total PCES/EAS Position Loss: (8) (This number carried forward to theEx~cutive SummBry) =="*""'--
Package Page 35 AMP Staffing - PCES/EAS
Staffing - Craft Last saved: Julys. 2o1a
Losing Facilit;y: Oshkosh P&DF Finance Number: 566.285
Data Extraclion Date: 03/05/13
{1) (2) (3) {4) (5} (6}
Craft: Positions Casual'siPSEs Part Time Ful Tfme Total Total Difiereooe On-Rolls On-Rols On-Rolls On-Rolls Proposed Function 1 -Clem 12 0 60 n 23 (49) Function 4 - Clem 0 0 0 Function 1 - Mail Handler 0 0 15 15 15 ()
Function 4 - Mml Handler 0 0 0 Function 1 &4Sub-Total 12 0 75 87 38 (49)
Function 3A - Vehide Servke 0 0 0 Fmction 38 -Maintenance 5 0 19 24 11 (13} Functions 67-69 -lmldiRehabiWC 0 0 other Functions 0 0 0
Total 17 0 M 111 49 {62)
Retirement Eligibles: 34
Gaining Facility: Milwaukee P&DC Ffnance Number: 565481
Data Extnlclion Date: 03/05/13
(1) (8} (9) (10} (11) (12) Craft Positions Casuals/PSEs Part Time FIJI Time Total Total
Difference On-Rolfs On-RoDs On-Rolls On-Rols Proposed Function 1 - Clerk 116 0 423 539 528 {11' Function 1 - Mail Handler 32 0 248 200 288 8
Function 1 Sub-Total 148 0 671 819 816 {3)
Function 3A -Vehicle Service 6 0 52 58 58 0 Function 3B -Maintenance
~ 0 152 163 182 19
Funclians 67-69- L.mtdiRehabMJC 0 32 32 32 0 other Flll'l.dions 0 0 4 4 4 (I
Total 165 0 911 1,076 1,092 16
Retirement Elgibles: 304
Total Craft Position Loss: 46 {This number carried forward to lfle Executhre Si.rmmBJ)r)
(13) Notes: Additional maintenance pen;onnei proposed at Milwadtee ilcludes staffinjl for stations and branches {as per HQ Mai!Jt).
PackagePage36 AMP Staffing - Craft
<...... c: ...... . N N
N 0 ....... w 0 w ....... w '"0 3:
c: Vl '"0 Vl
a s; co 0 ;A:~
;A:~ rr1
~ -0 z Vl
N 0 N . N 0'1 00 . 0'1 \.0 ..j::>. 0'1
w 00
' \.0 ..j::>.
LDC36
[ LOC37
I LDC38
I LDC39
Total
Maintenance Last Saved: July 8, 2013
Losing Facility: Oshkosh P&DF Gaining Facility: Milwaukee P&OC
Date Range of Data~ Jan-01-2012 : Dec-31-2012
Workh our-Activity -- - ~ ~ - ... ~"' ~P~ Costll Di:~ce I - Workhour tl,ctivity "
~- -- .~~ ~ ~ '
'" ···~-~ (5} {6}
Proposed Cost ~ilferena:
Mail Processing $ Equipment
Building Equipment $
Building Services $ (Cu$t0di<JJ~
Maintenance $ Operations Support
Maintenance $ Training
~~t.~::..,._~,£.:.~~~~'J{~{:~k:
~G:~~;dt<sr!~!so1it:~tti ;;;.~~~~w~~,.~~~;;,.~~a;~ .. ::. ;"r~~·~
Otht-r Re-la1.-rtd ~~,a ,rnsnanc& & f'ac il' l\• C<:'Sib
$
Mainmnance Paris, Supplies & $ Facillly Ulllllies
-
Adjustments ~·Qil\!!!'CWI' IISProp"<»
-- Grand Total $
702,265 $ 59,693 $ (642,57.2.}
379,342 $ 311,061 $ {68,282)
614,722 s 338,097 $ {276.625)
51,664 $ 0$ (51,664)
11,461 $ 11,461 $ 0
1,759,454 $ 720,311 s (1,039,142)
l Currem Cost II Proposed Cost! I Difference I 411,622 $ 150,000 $ (261,622)
$ 0
2,171,076 $ 870,311 $ {1,300,764)
E_ Mail Processing $ Equipment
E_ Building Equipment $
I LllC38
LDC39
I LDC93
Total
Building Services $ (CrAsroG\ill ~
Maintenance $ Operations Support
Maintenance $ Training -$
01h~t' Rt:lc;t~d rlla mte-;ta~l~e &
Far.t!ltyCo~l~
Manenanca Parls, ~plies & $ Faclll~ Uliltfes
Adj~ ;from "0\'lle.r Cwt I'S Pro(r !ab}
~ ~. -
7,522,445 $ 7,806,884 $ 284,438
2,130,739 $ 2,130,739 $ 0
3,242,32.1 $ 3,595,788 $ 353,467
872,03a $ 933,254 $ 61,216
190,678 $ 100,678 $ 0
13,958,220 $ 14,657,342 $ 699,122
I Current Co~ liP~ Cost'' D~ronoo I 2,505,179 $ 2,555,179 $ 50,000
$ 0
Grand Total $ 16,463,399 $ 17,212,521 $ 749,122 • ~- - -··' • T • ,..~,....: --
Annual Maintenance Savlngs: $551,643 (This m.n~~ercaflhdtorwardto lheExecr.oDve Sl:JmmBty)
~)N~--------------------------------------------------------------========
Package Page 37 AMP Maintenance
<..... s:: --' . N N . N 0 1--' w 0 w 1--' w -o 3:
c:: (/! -o (/!
:::c 0
~ o;:l 0 :::0
:::0 rr1
~ ....... 0 :z (/!
N 0 N . N O'l 00 . O'l <..0 ..j::::. O'l
w <..0 ........ <..0 ..j::::.
Losing Facility: Oshkosh P&DF Finance Number; 566285
Date Range of Data; __;;..;;:0:;:;:1;:;:10~1':":11":::"'2----:"to---12131112
(1) Current
(2}
Transportation - PVS Last Saved: July 8, 2013
Gaining Facility: Milwaukee P&DC Finance Number. 565481
~~~~---------
PVS Transportation Savings (Losing Facility): I ~ ~~ PVS Transporlation Savings (Gaining Facility}:[ --- $0 I Total PVS Transportation Savings: $0 «={This number is Sllll1llled with Tolal tinrn 'Trans-HeR' and earned fufwaRJ to !he
ExeciJlWe Summary as TranspoltBliwi SiM'lgs)
(7}Nolas: ------------------------------------------------------------------------------------
· :t:: · ·•.·. nw]f4~t~t~Mr~~" c:i~
Package Page 38 AMP Transportation- PVS
<..., 1::: ...... . N N . N 0 ....... w 0 w ....... w ""0 3:
c: </) ""0 </)
:::c 0
s; co 0 ::0
::0 ,..,.,
~ -0 :z: </)
N 0 N . N 0'1 co . 0'1 <..0 ..j:::>. 0'1
..j:::>. 0 ........ <..0 ..j:::>.
Transportation - HCR last Saved: July 8, 2013
Losing Facility:_Oshkosh P&DF Gaining Facility: Milwaukee P&DC
Type of Distribution to Consolidate: Destinating ------~~-------------
Date of HCR Data File:
Rwte
Package Page 39
CET for cancellations:
Route Current Annual
Current Annual
CETforOGP:
CT for Outbound Dock:
2 I 13 I 14 Current Proposed Proposed Proposed Cost per I Annual Annual Cost per
AMP Transportation - HCR
L s::: _.. . N N
N 0 1--' w 0 w 1--' ~
""0 3:
c: Vl ""0 Vl
:::c 0
~ OJ 0 ;::c
;::c f'T1
~ ...... 0 :z: Vl
N 0 N . N 0'1 (X) . 0'1 '-.0 ~ 0'1
~ 1--' ......... '-.0 ~
1
Route
2 CllJT'ellt Annual
Pacbge Page 40
3 Current Annual
4
Current I Proposed Cost per Annual
7 Proposed Cost per Route
Current AnRual
c.Jrrent Annual
Current I Proposed Cost per Annual
13 Proposed Annual
14 Proposed Cost per
AMP Transportation - HCR
c..... z: -'
N N
N 0 ...... w 0 w ...... ..j::>.
o:l 3:
c: Vl o:l Vl
:c 0
s;: o::;J 0 ;:o
;:o 1"'1"1 r ~ ....... 0 z Vl
N 0 N . N 0'1 Q:l . 0'1 1.0 ..j::>. 0'1
..j::>. N -....... 1.0 ..j::>.
Route Current Annual
Current Annual
Moving to Gain(-)
Current Cost per
Proposed I Proposed Ann uaT Annual
Proposed Cost per Route
HCRArmual Savings (Losing Facility): $4,09a,1tf7
Total HCR Transportation Savings; ___ $26,963,216
Package Page 41
Current Annual
Current Annual
Current Cost per
Mile
Proposed Annual
13 14
Changes Proposed Resuft
HCR Annual Savings (Gaining Facility): :f!llift#fliU/:H
<<= (fhls liUIElber is ~mmed wl111 Totar ftom 'Trans-f'VS' a~~d carried foi'\WI'tf w lbe E1aiJI:tJflvs Surm:rlaly as T~tloo Simi'lgs)
c... ::::::: __, . N N . N 0 ....... w 0 w ....... ~
"'0 3:
c (./) "'0 (./)
:c 0
;: CD 0 ;::o
~~'~}~ ~
AMP Transportation - HCR
~ -0 :z (./)
N 0 N . N 0'1 co . 0'1 <.D ~ 0'1
~ w
' <.D ~
Jul-22·2013 03:14PM USPS · HQ · LABOR RELATIONS 202·268·6946
Distribution Changes Last hved: July$, 2013
Losing Facility: Oshkosh P&OF Typt Of Distribution to Consoll<latt:~Oe:5!t!:En::atit.rn:-:.g:=:=.:.-----------------------
(1)
lndloett taon DMM labeling llttarro~ed l!y pl11clng an "X" to tne left of tho llet.
OMMLQ01 ___ CMML011
___ DMMI.201
___ DMMIM1
___ DMM Le02
___ DMM UI03
___ DMMU104
___ DMMUIOS Alltien Clldt' Column A· (!.Of I ZIP 0011& l'll'lftX \11'011~
(4 ~~ Jan '13
Ftb'13
Jan '13
Fib '13
OMMIAOll
__ X_DMM Le07
f<lr Outlnatlon l!nl Claccunta • I"Airr Abcolntmtnt SumrMI'Y Repcrt
l.olln;/OIInlnl! ::: ,_aiUty Nam6 Ba~d":Dill !.caine Fsellll.v 148 Otrokolh P&OF 305
Loalna Faelltty 549 Oihkollh P&OP 21il7
Galnlna l"ao:llltv 530 MIIW!!Ukas PS.OC :ne Galnlna FllcllllY 530 Mllw&uk•t PICC 2e1
Nt• lh!JW lie DURI
48 1!.08% 111
Tl ~15.93% 80
eo 1Uiil% 72 70 24.39% 57
Oolumn II· LA~! to
i ~ ~
11.72% 0
20.20% 1
22,78% 0
11.88% 0
(I) Notti: Y;!t!J !h.uReroval aflna AMP, labeling llat ;tlangta wm bt ooordlnlted whh the sru and local FAST caordlnatcl'll.
Package Page 42
tll IOIK Unaoful caunl
O.ll~ ~59 84.92% a 0.34% 21\l 73.74% 7
0.00% 2115 11.01l~ 127 0.00% 217 71l,B1% 114
AMP Clatrlbution Changee
44/94
MPE Inventory last Saved: July 8, 2013
losing Faeility;..;O:..::sc:.:;h::..::ko::..::s:;..:h..:..P..:;;&;;;:;D;.;.F __________ _ Gaining Facility: Milwaukee P&DC
Data ExlracHon Date: 03105113
(1) {2) (3) {4)
Equipment Current Proposed
Difference Type Number Number
Equipment Current
Type Numbet'
AFCS 1\FCS
A.FCS200 0 0 0 AFCS200 6 AFSM -ALL 1 0 (1) AFSM -All.. 5
APPS APPS
ClOSS 0 0 0 ClOSS 3 CSBCS CSBCS
DBCS & 0 {8) DBCS 26 DBCS-OSS 0 0 0 DBCS-OSS 6
DIOSS 1 0 {1) DIOSS 7 FSS FSS
SPBS 0 1 1 SPBSIAPBS 0 UFSM UFSM
FC J MlCRO MARK FC I MICRO MARK
ROBOT GANTRY ROBOT GANTRY
HSTS/HSUS HSTS/HSUS
lCTS/lCUS 0 0 0 LCTS/LCLIS 3 UPS 2 4 2 UPS 0
MPBCS-OSS . MPBCS-OSS
T.ABBER TABBER PIV PIV
lCREM 0 0 {) lCREM 1
(5} (6) (7) (8)
Proposed Difference
Equipment Relocation Number Change Costs
6 0 0 5 0 (1)
3 0 0
31 5 (3} $75,000
6 0 0
7 0 (1)
0 0 1 $80,000
3 0 0 0 0 2 $6(1,000
1 0 0
Mai1 Processing Equipment Relocation Costs from Losing to Gruning Facility: $235,000 (Thisnumberiscarrled forward to SpaceEV81rJaffanand
other Costs) (9) Notes: LIPS and NSPI3S wiD oome from olher siles.
Package Page 43 AMP MPE Inventory
<..... z: --' . N N . N 0 ....... w 0 w ....... ..j::>.
-c 3:
c Vl -c Vl
:c 0
~ o;:l 0 ::0
::0 rr1 I
~ ........ 0 z Vl
N 0 N .
"N 0'1 00 . 0'1 '-0 ..j::>. 0'1
..j::>. Cl
' ·..o ..j::>.
Package Page 44
Customer Service Issues Ul!l51Wed: ~ !1, 2013
LosiDg Facility:-=Ost!ko6:..::.:.::.=hc.:.P..:;;&DF=---------------5-Dfglt ZIP Code: 54902
DdaE~~-=~~~3~-------
1. Collec:6on Poinl:s
~ plcMd uplleii:R 1 p.m. I ~- I --- I NllriDfK pict.ed up~ t-6 p.m.. --
T===~' 384 t=~ II 0 I 0 I Cl I 0 I 0 I 0 I 2.. How many tlDIIection bfUB!I. am designated fDr•1oca1 detiway"?
3. How many •1oca1 delivefT" boxes will be l'1li1RJifed as a n:!Bult of Aflll>?
4. DeDvery Perfumlanc:e Report Qlllll"lllrlFY l'erl::all
"CIKt!oo; ~ IIebe 5 p.m. 02FY12 85.9%
Q3FY12 89.4%
04FY12 81.6"1!. Q1 FY1_~_ ~17.1%-
5.. .Retal Unit bsld&Losllg fadl~ {Window Sentice TUDeS)
1 --o--J
I o I
&.. Business {Bulk) llail Act:eptance H01n
~ ~ ~- n""'!:..;:.;: _. '~ ~~t .,. """'.::~....,._-
start End Slar:t End I start Eod 5I8ft End
UmclllJ 8;(10 18::30 8:;00 18:3Cl 1 lilondiiJ 10:00 18:00 10::(1() 18:00 Tu.....Ja, 8::(10 18::30 8:;00 18:3() lU!sd!IJ 10:00 18:00 10::CO 18:00
8::CO 18::30 8:;00 18:3() ; 10:00 18;00 10::(10 18:00
~ 8::(10 18::30 8:;00 18:3() : n.ums, 10:00 18:00 10::(1() 18:00 Frida'} 8:00 18::30 8:00 1~ F!WaJ 10:00 18:00 10::(10 18:00
SaoUd!l) 9;00 14::30 9;00 14:00 Saltrda:l Closed Closed Cklsed CJasad
7. can customers obtain a local postmart: in aecon:Jane& 'Willi applicatJie polcies ill tile Postal Opfr.mons MvJual? Yes
8.. Mltes;: Proposed 1ime of Wrdow and BilGE wil be dependart on i.llul& lrucl!; schedi.Es. C€Jieclicm baHes Clmllllly klcaled mriBide of lhe Oshflosb P&DC !lalote ftleir last ccledtoo lmes at20:00, llese l'fll'Uid not be changed at 1hls tina.
Gaining Facility: Mlwaukee P&DC
9. Whid postmark wiJ be printed on eoOI!Ction mail?
Une I llliwaukee 5320.3
Une2 Dab!-& lime :$'""£r ~c-'ni\r~ _
•
AMP Customer Service Issues
c... c --' . N N . N 0 f-lo w 0 w f-lo .,J:::.
-o 3:
c: </) -o </)
:::c 0
j; r.::;o 0 ;:t:J
;:t:J i'"1
~ -0 z </)
N 0 N . N O'l co O'l <.0 .,J:::. O'l
.,J:::. O'l '<.0 .,J:::.
Jul-22·2013 03:14PM USPS · HQ · LABOR RELATIONS 202·268·6946
Space Evaluation and Other Costs Last SS\Ied: JUly a. 2.013
Losing Facility: Oshkosh P&DF
1 . Affected Facility Facility Name -'l'E'ffi-'~:'-2:""---------
Street Address: City, State ZIP:
2. l.ease Information. (If not leased skip to 3 below.) Enter annual lease cost ownsd
enter lease expiration date-i'iNm/A=='--------------Enter lease options/terms-=-=N"'-tA,__ ____________ _
3. Current Square Footage Enter the total Interior square footage of the facllltt......;,.1 o~1:.~.78~9ws_g~ft:....· -----------
Enter gained square footage expected with the AM#....-=co _____________ _
4. Planned use for acquired space from approved AMI TM P&DF will be renovated Into a parcel & bundle soiling facfii}Y for all o1 Northern \1\RSconsln and Upper M!ch!Qsn.
5. Facility COsts
Enter any projected one-time facility costs'-: ""'$='1 <=24..:.:8==-0o::..:o:......,.._~----,--=---==---=---:---:-:{Ttlis number shOwn below under one·11me costs seet1on.
6. Savings Information
Space Savings ($): $0 ---"'{Ttl~l$:-:n:-:um:-:b::-:e-:-r e:-:a-::;rrl;:-:ed::-:~::-:orw:-:a:-:rd"t"'"o-:::lh-=-e Sx-=:."'"ec-:-ut/ve=-..s::::um=-=m=-=a=ry)'
Employee Relocation Costs: ~$0.:....-~--~
Mail Processing Equipment Relocation Costs: $235,000 (1rom MP~ /fWii!nil:>ry)
Facility Costs: $1,248,000 (from abO\it)
Total One-Time Costs: $1.483,000 (This number canil!d fotwa!'d to EiX9cutliltl summaty)
LOGlng FacllllY:,.;:O""IU!""k::::ca::.:.h.:...P&""P"""F ________ _ Gaining Faclllcy: Milwaukee P&DC
(1)
Product
Ran~;~t Of Repolt --..:..~'Y:-1..,.2 __
(2)
Associated REC
Wichita \i\llehtta Wichita Wichita WIChita
(3)
Current Cost per1.000 Images
(4)
Product AEi$QQiatad RliC
(8)
currant cost par 1,000 Images $34.10 $34.65 $196.02 $34.12 $34,68
Package Page 45 AMP Space Evaluation and Other Costs
47/94