Turlock Irrigation District 333 East Canal Drive P.O. Box 949 Turlock, CA 95381-0949 NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION Project Title: Washington Substation Lead Agency: The Turlock Irrigation District (TID) is the Lead Agency for the Project (as described herein) and has prepared the Initial Study/ Mitigated Negative Declaration in accordance with the requirements set forth in the California Environmental Quality Act (CEQA). Project Location: 325 S. Washington Road, Turlock Irrigation District, Washington Substation

description

Notice of intent to adopt the Mitigated Negative Declaration for the Washington Substation

Transcript of Notice of Intent to Adopt Washington Substation MND

Page 1: Notice of Intent to Adopt Washington Substation MND

Turlock Irrigation District333 East Canal DriveP.O. Box 949Turlock, CA 95381-0949

NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION

Project Title:Washington Substation

Lead Agency:The Turlock Irrigation District (TID) is the Lead Agency for the Project (as described herein) and has prepared theInitial Study/ Mitigated Negative Declaration in accordance with the requirements set forth in the CaliforniaEnvironmental Quality Act (CEQA).

Project Location:325 S. Washington Road, Turlock Irrigation District, Washington Substation

Page 2: Notice of Intent to Adopt Washington Substation MND

Project Need:

To continue maintaining power system reliability as growth continues to occur on the west side of Turlock and toenable electric distribution demand to be moved from Commons Substation which will alleviate congestion onTID’s sub-Transmission (69 kV) System.

The proposed project would tie into the Walnut-WEC 115 kV transmission line that runs along the south fence lineof the subject parcel. Use of the proposed project site would eliminate the need to expand or construct newtransmission lines as existing transmission facilities can serve the substation.

Project Description:

The proposed project site is located at 325 S. Washington Road in unincorporated Stanislaus County. Theproject will expand an existing 10.0-acre substation facility to include an additional 2.0 acres of new equipment,utilizing portions of the site that have already been fenced, graded and disturbed for use as a storage yard.

Copies of the Initial Study/ Mitigated Negative Declaration are Available at the Following Locations:

Electronic copies are available online at: http://www.tid.com/

Hard copies are available at:

Turlock Irrigation District333 E Canal DriveTurlock, CA 95380

Turlock Public Library550 North Minaret Avenue

Turlock, CA 95380

Modesto Public Library1500 I Street

Modesto, CA 95354

20-Day Public Comment Period:

Begins: June 23, 2016

Ends: July 13, 2016

Board Consideration:

The Mitigated Negative Declaration will be considered for adoption at the TID Board meeting held on July 26,2016 at: 09:00 AM

TID Business Office333 East Canal DriveTurlock, CA 95380

For Additional Information or to Submit Written Comments, Please Contact:

Janis Scott, TID Senior Electrical EngineerP.O. Box 949Turlock, CA 95381-0949(209) 883-8605E-mail: [email protected]