SOUTHCO UTILITY NOTICE INVITING EXPRESSION OF INTEREST (EOI) EOI No/ BGJY/ Southco Utility/ Aska Circle/ Partially or Fully Turnkey/06/2018-19/Dt.05.09.2018 Invitation for Expression of Interest from the Licensed Electrical Contractors for Executing the work of System Improvement under BGJY Program, on Partially or Fully turnkey basis under Aska Electrical Circle of SOUTHCO Utility.

Transcript of NOTICE INVITING EXPRESSION OF INTEREST (EOI)southcoodisha.com/tend/EOI Of BGJY.pdf · NOTICE...

SOUTHCO UTILITY

NOTICE INVITING EXPRESSION OF INTEREST (EOI)

EOI No/ BGJY/ Southco Utility/ Aska Circle/ Partially or Fully

Turnkey/06/2018-19/Dt.05.09.2018

Invitation for Expression of Interest from the Licensed Electrical

Contractors for Executing the work of System Improvement under BGJY

Program, on Partially or Fully turnkey basis under Aska Electrical Circle

of SOUTHCO Utility.

Page 2 of 51

SOUTHCO UTILITY

Office of the Superintending Engineer, Electrical Circle, Asika, College Square, Ganjam

Mail id:[email protected] Phone No-06822-271196

Letter No:_________ Date:-

EOI No/ BGJY/ Southco Utility/ Aska Circle/ Partially or Fully Turnkey/06/2018-19/Dt.05.09.2018

NOTICE INVITING EXPRESSION OF INTEREST (EOI)

Invitation for Expression of Interest from the Licensed Electrical Contractors for Executing the work of System Improvement under BGJY Program, on Partially or

Fully turnkey basis under Aska Electrical Circle of SOUTHCO Utility.

1.0) Background:-

SOUTHCO UTILITY an Electricity Distribution organization in Odisha, desires to entrust competent

Electrical Contractors having valid Electrical License to work in Odisha, the execution of works 1)

Erection of 11 KV New Line 2) Erection of DP Mounted Sub-station of different Capacities 3) Erection

of LT line with AB Cable 4) Up-gradation of transformer of different Capacities 5) Conversion of 11 KV

line from 2 phase to 3 phase on full or partial Turnkey basis under BGJY scheme of Balisira,

Nuagaon-II, Balipadar, Budhamba, Kabisurya Nagar, Digapahandi, Nuapada, Surangi electrical

section of Aska Electrical Circle under Ganjam District. Each section is consider as one Package.

Firms / Agencies may apply for any two Packages as per their capability by fulfilling the formalities of

SOUTHCO UTILITY. The nature of work and qualification, the pre-qualification requirements are

available at the website www.southcoordisha.com.

The interested parties are requested to submit their EOI in the prescribed format along with all

supporting documents/ credentials in sealed cover by 12.09.2018 in the Drop Box kept in the office of

undersigned.

2.0) Scope of Work:-

Sl No

Package name

11KV line New

Distribution S/S

UG of Existing S/S LT line with

AB Cable

Estimated Cost

( In Lakhs)

11K

V N

ew l

ine

11K

V C

on

v 2

W-3

W

25K

VA

, 11

/0.

4KV

63K

VA

, 11

/0.

4Kv

100K

VA

, 11

/0.

4KV

25-6

3KV

A,

11/

0.4K

V

25-1

00K

VA

, 11

/0.

4KV

63-1

00K

VA

, 11

/0.

4KV

100-

250K

VA

, 11

/0.

4KV

250-

315K

VA

, 11

/0.

4KV

3x50

+1x

35

3x35

+1x

25

1 Balisira 3 7 4 3 4.4 67.31

2 Nugam-II 1 3 2 5 5 2.9 57.98

3 Balipadar 3.8 3 6 7 2 6.4 74.95

4 Budhamba 1.25 3 5 3 1 13.65 64.26

5 KSNagar 3.7 5 12 1 6 6 27.56 189.04

6 Digapahandi 2.7 3.5 6 5 3 3 2 7.3 1.5 88.49

7 Nuapada 8.25 3.3 10 2 0.85 1.4 59.07

8 Surangi 1.5 1 1 1 0 1 0.1 16.35

* Each section is one package

Page 3 of 51

3.0 Information to Participate:- Bidders to be considered as eligible (to bid) should meet the following qualifications; (a) Bidder may quote for any one package or for multiple packages; however, bidder must quote for the entire quantum of works specified under each such package(s). One bidder can bid for maximum 2(two) packages. Quotation for more than two packages is the management prerogative to disqualify the particular package and acceptance of any two packages. (b) The bidder should have installed and commissioned the quantum of work as specified in Table below with respect to qualifying criteria (Work experience) as mentioned at Table –A below.

(i) For construction/up-gradation/renovation of 33 KV & 11 KV OH Lines taken together, the bidder(s) should have executed/upgraded/renovated at least 50% of the 11 KV and higher voltage lines.

(ii) For construction/up-gradation/renovation of 11/0.4 KV S/S, the bidder (s) should have executed/upgraded/renovated at least 50% of 11/0.4 KV S/S.

(iii) For construction/up-gradation of LT line, the bidder(s) should have executed/up-graded at least 50% of LT Lines or 25% of HT Line.

TABLE - A PACKAGE WISE MINIMMUM QUALIFYING REQUIREMENTS

Minimum eligible criteria to participate in the BID

Sl No

Package 11KV line

in Km. Installation of Sub-Stations

LT line in Km.

1 Balisira 0 9 2

2 Nugam-II 0 8 1

3 Balipadar 2 9 3

4 Budhamba 1 6 7

5 KSNagar 2 15 14

6 Digapahandi 3 10 4

7 Nuapada 6 6 1

8 Surangi 1 2 1

“The bidder must have executed the quantum of work as mentioned in the Table A above during the last three financial years preceding to the year of EOI notification and should have successful operation of minimum period of one year. Bidder must enclose copies of the relevant work orders along with client certified copies of Final Invoices and/or Performance Certificates dully signed by the competent authority of the client and/or Final Inspection certificate issued by Electrical Inspector in proof of having executed the desired quantum of works during the last three financial years.” (c) If the bidder(s) participate in multiple packages, the qualifying requirement for work experience shall be considered /evaluated independently/separately for each package. However, the qualifying requirement for Turn Over shall be considered on average basis as per no of packages applied by total turnover for each package(s). (d) The minimum average Annual Turnover of the bidder in any best one financial year out of last three financial years should not be less than 50% of the estimated value of the package(s) quoted by the bidder(s).

(e) Bidder shall be financially sound and stable having liquid assets as stated in the enclosed format and/or access to credit facility of not less than one fifth of estimated cost of the package(s) for which he has submitted the bid.

Page 4 of 51

NB: 1) Only cash at bank / in hand & fixed deposit mentioned in the audited balance sheet of last FY shall be considered for accessing the Liquid Asset. 2) The average unutilized credit limit during the month prior to the month of bidding shall be considered to access the credit facility.

(i) In addition to above the bidder(s) should submit the following documents as qualifying terms.

i. Self Attested copy Labour License. ii. Self Attested copy last one yrs. Audited annual reports for companies &

partnership firm. In case of individuals, Income Tax returns with audited annual P/L & B/S.

iii. Self Attested copy EPF & ESI: Registration certificate along with last month self attested challan copy.

iv. Self Attested copy valid electrical (HT) license for electrical works. v. Self Attested copy PAN & GSTIN No.

vi. Self Attested copy User’s Certificate for work experience along with W/O copy/Invoice.

vii. Self Attested copy Electrical Inspection Report for work executed.

Note: As and when required, the bidders are required to present original document for verification.

(J) The bidders who have earlier failed to execute the work order(s) of SOUTHCO UTILITY shall

not be eligible to participate in this EOI.

(K) SOUTHCO UTILITY reserves the right to consider any minor deviation such as work experience, Turnover, liquidity asset if they do not materially affect the capacity of the bidder to perform the contract.

Dt.05.09.2018 Superintending Engineer

Electrical Circle, Aska

Southco Utility

Address For Communication:-

Office Of The Superintending Engineer, Aska Electrical Circle Near 132/33 KV Grid, Nuagaon College Suare, Asika Ganjam-761111

Letter no: ___________________________Date:______________________________

Copy communicated to:-

1. Notice Board of this office. 2. IT Center, DMU, GRIDCO, Bhubaneswar for information & necessary action. He is requested

to upload the EOI notice along with enclosures in the www.southcoodisha.com website. 3. All Executive Engineers under this circle for information & wide circulation under their

jurisdiction. 4. All Circle Heads under Southco Utility. 5. GM-Cum-Nodal Officer, Southco Utility, Ganjam District. 6. GM(Govt. Project, Safety &IT)-Cum-Nodal Officer, Southco Utility 7. GM (Fin), Southco Utility 8. Sr. General Manager, Southco Utility 9. Chief Operating Officer, Southco Utility 10. Authorized Officer, Southco Utility

for kind information

Page 5 of 51

SECTION – I

GENERAL CONDITIONS OF (EOI)

EOI No/ BGJY/ Southco Utility/ Aska Circle/ Partial or Fully Turnkey/06/2018-

19/Dt.05.09.2018

Page 6 of 51

1.0 GENERAL: -

SOUTHCO Utility hereinafter referred to as the “Owner” is desirous of construction of

various System Improvement Works under the BGJY (SI) Program, on Partially or fully

turnkey basis in their licensed area in the state of Odisha as described below:

(i) Erection of 11KV New Line

(ii) Erection of DP mounted 25KVA/ 63KVA / 100KVA, 11/0.4KV Distribution S/S.

(iii) Erection of LT line with AB cable.

(iv) Up gradation of DTR 16-25KVA, 25-63KVA, 63-100KVA, 100-250KVA

(v) Conversion of 11KV line from 2Phase to 3Phase.

2.0 Scope of Work: -

2.01 The scope shall include supply and installation of all materials & equipments to complete the

works except the following materials/ equipments which shall be supplied by the Owner.

a) Distribution Transformers

The agency shall quote the price of the above item. In case the owner is fails to supply the

material then the agency is allowed to supply the same as per rate quoted by the agency.

The total price including the OSM material price quoted by the agency shall be taken into

consideration for evaluating the cost of bid

2.02 The detailed scope of the work shall include;

i. Detailed survey of substation, line and preparation of SLD / BOQ to be done by the

bidder

ii. Complete manufacture, including shop testing & supply of materials from the approved

vendor (materials which are to be supplied by the bidder) on subsequent approval of the

owner (REC standard)

iii. Packing and transportation from the manufacturer’s works to the site.

iv. Receipt, storage, preservation and conservation of equipment at the site.

v. Pre-assembly, if any, erection testing and commissioning of all the equipment;

vi. Reliability tests and performance and guarantee tests on completion of commissioning;

vii. Loading, unloading and transportation as required.

viii. Erection of equipments in Sub-station including civil works.

ix. Erection of lines of specified voltage.

x. Inspection, Testing, Commissioning of substations and lines / installations

xi. Storing before erection

xii. Getting the substations & lines inspected as per BGJY circular of GoO after completion of

work.

xiv. Dismantling of existing electrical structures and return of these dismantled items at the

Owner’s stores, safe custody of the items and return of unused Owner’s supplied

materials to the Owner’s stores.

3.0 DEFINITION OF TERMS

(i) The ‘Contract ’means the agreement entered into between the Owner and the

Contractor as per the Contract Agreement signed by the parties, including all

attachments and appendices there to and all documents incorporated by reference

therein.

(ii) ‘Owner’ shall mean SOUTHCO Utility and shall include its legal representatives,

successors and assigns.

(iii) ‘Contractor’ shall mean the Bidder whose bid will be accepted by the Owner for the

award of the Works and shall include such successful Bidder’s legal representatives,

successors and permitted assigns.

Page 7 of 51

(iv) ‘Sub-Contractor’ shall mean the person named in the Contract for any part of the works

or any person to whom any part of the Contract has been sublet by the contractor with

the consent in writing of the Owner and will include the legal representatives,

successors and permitted assigns of such person.

(v) ‘Engineer in Charge’ shall mean the officer appointed in writing by the Owner to act as

Engineer from time to time for the purpose of the Contract.

(vi) ‘Specifications’ shall mean the specifications and Bidding Document forming a part of

the Contract and such other schedules and drawings as may be mutually agreed upon.

(vii) ‘Site’ shall mean and include the land and other places on, into or through which the

works and the related facilities are to be erected or installed and any adjacent land,

paths, street or reservoir which may be allocated or used by the Owner or Contractor in

the performance of the Contract.

(viii) ‘Inspector’ shall mean the Purchaser or any person nominated by the Owner from time

to time, to inspect the equipment; stores or Works under the Contract and/or the duly

authorized representative of the Owner.

(ix) ‘Notice of Award of Contract’/ ‘Letter of Award’ shall mean the official notice issued by

the Owner notifying the Contractor that his bid has been accepted.

(x) ‘Date of Contract’ shall mean the date on which notice of Award of Contract/ Letter of

Award has been issued.

(xi) ‘Performance and Guarantee Tests’, shall mean all operational checks and tests

required to determine and demonstrate capacity, efficiency, and operating

characteristics as specified in the Contract Documents.

(xii) The term ‘Final Acceptance’/ ‘Taking Over’ shall mean the Owner’s written acceptance

of the works performed under the Contract, after successful commissioning/ completion

of Performance and Guarantee Tests, as specified in the accompanying Technical

Specifications or otherwise agreed in the contract.

(xiii) ‘Commercial Operation’ shall mean the condition of operation in which the complete

equipment covered under the Contract is officially declared by the Owner to be available

for continuous operation at different loads up to and including rated capacity. Such

declaration by the Owner, however, shall not relieve or prejudice the Contractor of any

of his obligations under the Contract.

(xiv) Words imparting ‘Person’ shall include firms, companies, corporations and associations

or bodies of individuals, whether incorporated or not.

(xv) Terms and expressions not herein defined shall have the same meaning as are assigned

to them in the Indian Sale of goods Act (1930), failing that in the Indian Contract Act

(1872) and failing that in the General Clauses Act (1897) including amendments thereof,

if any.

(xvi) In addition to the above the following definition shall also apply

a) ‘All equipment and materials’ to be supplied shall also mean ‘Goods’ b) ‘Constructed’ shall also mean erected and installed. c) ‘Contract Performance Guarantee’ shall also mean ‘Contract Performance

Security’. 4.0 VALIDITY:-

The offer shall be valid for a period not less than 90 days from the date of bid opening.

Page 8 of 51

5.0 PRICE: -

The Bidder shall complete the appropriate Price Schedules enclosed in format

stating the Taxable value for each item including Packing & forwarding, freight & insurance,

loading & unlading charges but excluding GST and thereby arriving at the total amount

before GST. The bidder should also consider the input tax credit available to them while

quoting the price. The taxable value so quoted for the Contract shall remain FIRM as per the

above Parameters and Owner shall not compensate Bidder for any variations. However any

variation in the rate of GST within the schedule date of execution of the contract shall be

borne by the Owner, else the same shall be borne by the bidder. GST should be added at last

to arrive the total value of the work as indicated in the price bid. Price evaluation shall be

carried out on the basis of total value of work including GST.

6.0 OPENING OF THE BID: -

6.01 Information relating to the examination, clarification, evaluation and comparison of Bids and

recommendations for the award of a contract shall not be disclosed to Bidders or any other

persons not officially concerned with such process. Any effort by a Bidder to influence the

Owner’s processing of Bids or award decisions may result in the rejection of the Bidder's Bid.

7.0 EVALUATION OF BIDS & AWARD OF CONTRACT:

7.01 To assist in the examination, evaluation and comparison of Bids, the Owner may, at its

discretion, ask the Bidder for a clarification of its Bid. All responses to requests for

clarification shall be in writing and no change in the price or substance of the Bid shall be

sought, offered or permitted.

7.02 Owner will examine the Bids to determine whether they are complete, whether any

computational errors have been made, whether required sureties have been furnished,

whether the documents have been properly signed, and whether the Bids are generally in

order.

7.03 Arithmetical errors will be rectified on the following basis. If there is a discrepancy between

the unit price and the total price per item that is obtained by multiplying the unit price and

quantity, the unit price shall prevail and the total price per item will be corrected. If there is

a discrepancy between the Total Amount and the sum of the total price per item, the sum of

the total price per item shall prevail and the Total Amount will be corrected.

7.04 Prior to the detailed evaluation, Owner will determine the substantial responsiveness of

each Bid to the Bidding Documents including production capability and acceptable quality of

the Goods offered. A substantially responsive Bid is one, which conforms to all the terms and

conditions of the Bidding Documents without material deviation.

7.06 The Owner will award the Contract to the successful Bidder whose Bid has been determined

to be the lowest - evaluated responsive Bid, when the lowest bidders is not ready and/or

capable to undertake the entire work envisaged, then the Owner may explore the possibility

of the execution of works through other bidders if they are willing to execute at L1 rate.

Such exploration shall be carried out in a sequential order starting with L2 bidder then with

L3 bidder and so on.

7.07 In case of omission of any item in the price bid or the price for the item has not been quoted

by the firm, then zero cost shall be loaded to the bid and the contract shall be awarded with

zero cost that means the firm will have to bear the cost of that item entirely as the item

price shall be considered as inclusive anywhere in other items. The bidder shall have to give

Page 9 of 51

an undertaking to the effect that prices for any item not quoted shall be treated as free

supply or to be done free of cost.

8.0 OWNER’S RIGHT TO VARY QUANTITIES AT TIME OF AWARD:

While placing orders and / or during execution of contract, Owner reserve the right to

increase or decrease the quantity of goods and services specified in the Schedule of

Requirement up to 20% of the tender quantity without any change in price or other terms

and conditions.

9.0 INSPECTION AND TESTING:-

9.1 The major materials such as PSC poles, Conductor, AB Cable, PVC Cable, Transformers, AB

Switch/HG Fuse, Isolator, LAs, shall be inspected by the Owner or any authorized

representative of the Owner or jointly by the Owner/Owners Authorized Representatives

with REC outsource independent third party agencies designated as REC Quality Monitors as

per relevant ISS at the Contractor’s or its Sub-Vendors manufacturing works. All other minor

materials shall be inspected by the Owner or any authorized representative of the Owner

only. They shall give the advance notice in writing about the place of Inspection and or

testing at least 15 days before the schedule date on which the materials will be ready for

Inspection & Testing.

9.2 The Engineer-in-charge shall be entitled at all reasonable times during installation to inspect

/ examine and test the materials at the contractor’s store / erection site about workmanship

of the materials to be supplied under this contract. If the said materials are being

manufactured in other premises, the contractor shall provide unhindered clearance, giving

full rights to the purchaser to inspect, examine and test as if the materials were being

manufactured in his premises. Such inspection / examination and testing shall not relieve

the contractor of his obligations to execute the contract by letter and spirit. The contractor

shall give the purchaser advance notice in writing of the Date and the Place at which the

materials will be ready for testing. The inspecting officer coordinating office for the entire

work shall be the Owner’s authorized representative.

10.0 COMPLETION AND COMPLETENESS OF THE EQUIPMENT:-

10.01 Time being the essence of the contract; the work shall be completed within 02 (Two)

months from the date of issue of work order.

10.02 The work shall be treated as complete item wise when one item shall be complete in all

respects with all mountings, fixtures and standard accessories which are normally supplied

even though not specifically detailed in the specification. No extra payment shall be payable

for such mounting, fittings, fixtures and accessories which are needed for safe operations of

the equipment as required by applicable code of the country though this might not have

included in the contract.

10.03 All similar components and/or parts of similar equipment supplied shall be inter-changeable

with one another. Various equipments supplied under this contract shall be subject to

Owner’s approval.

10.04 Purchaser however reserves the right to re-schedule the completion period, if required.

11.0 REJECTION OF MATERIALS: -

In the event of the materials supplied by the contractor and/or the installation works are

found to be defective in quality and the workmanship is poor or otherwise not in conformity

with the requirements of the REC/IS specification, Owner shall reject such materials /

services and ask the contractor in writing to replace / rectify the defects. The contractor on

receipt of such notification shall rectify or replace the defective materials and/or re-install

Page 10 of 51

the work already executed, free of cost to the Owner. If the contactor fails to do so the

Purchaser may at his option take the following actions which could be on concurrent basis.

A) Replace or rectify such defective materials and recover the extra cost so involved

plus 25% from the Contractor.

B) Terminate the contract for balance supply and erection with enforcement of penalty

as per contract.

C) Acquire the defective materials at reduced price considered acceptable under the

circumstances.

D) Forfeit the Contract Performance Bank Guarantee.

12.0 EXPERIENCE OF BIDDERS: -

The bidders are required to furnish information regarding their experience on the following

aspects as per format provided in Annexure-IV.

i. Description of similar type of work with same or higher voltage level executed

during the last three years with the name(s) of the party(s) to whom / where

supplies / erection were made.

ii. Purchase / work orders details (P.O / W.O No. and date only) executed

(construction work) during the last three years along with Electrical inspection

report copies and copies of user’s performance certificates.

Bids may not be considered if the past performance is found to be un-satisfactory.

13.0 DEVIATION FROM SPECIFICATION: -

The bidders are requested to study the specification and the attached drawings thoroughly

before bidding so that if they make any deviations, the same are prominently brought on a

separate sheet under the headings “Deviations” as per formats provided under Annexure –

V & VI. All such deviations to the technical & commercial terms of the specification shall be

indicated in a separate list as indicated above. In absence of such deviation schedule, it will

be presumed that the bidder has accepted all the conditions stipulated in the EOI,

notwithstanding any deviations mentioned elsewhere in the Bid. However the acceptance of

deviation is not binding on the Owner.

14.0 CONTRACTOR TO INFORM HIMSELF FULLY: -

The contractor shall examine the instructions, general conditions of the contract,

specifications and the schedule of quantity and delivery to satisfy him as to all the terms and

conditions and circumstances affecting the contract price. He shall quote prices according to

his own judgment and shall understand that no additional cost except as quoted shall only

be considered.

15.0 PATENT RIGHT: -

The contractor shall indemnify the Owner against all claims, actions, suits and proceedings

for the alleged infringement any patent design or copy right protected either in country of

origin or in India by the use of any equipment supplied by the contractor but such indemnity

shall not cover any use of the equipment other than for the purpose indicated by or

reasonable to be informed from the specification.

16.0 GUARANTEE PERIOD: -

16.01 The materials to be supplied by the contractor shall be guaranteed for satisfactory operation

against defects in design and workmanship for a period of 24 months from the date of

handing over the completed installations after commercial operation at required voltage

level.

16.02 The above guarantee certificate shall be furnished in triplicate to the Owner for his approval.

Any defects noticed during the above period should be rectified by the Contractor free of

cost to the Utility provided such defects are due to faulty design, bad workmanship or bad

Page 11 of 51

materials used on receipt of written notice from the Owner. The Contractor as notified by

the Owner shall rectify any such defects within one month failing which the Owner will set

right the defects through other agency and recover the cost so incurred either from any

pending Invoices or Bank Guarantee.

17.0 PENALTY FOR DELAY IN COMPLETION OF CONTRACT: -

17.01 If the contractor fails to complete the works by the scheduled period or any extension

granted thereby, the contractor shall be liable for payment of penalty amounting to 0.5%

(half percent) of the contract price per week of un-finished works subject to the maximum

of 5% (five percent) of the total contract price and subject to force majeure conditions. After

receipt of LOA, the Contractor shall submit detail work plan through PERT chart/BAR chart

with the Owner within 15 days. The penalty for liquidated damage as mentioned above will

be levied if any deviation to be schedule on any item of work due to the fault of the

contractor is observed.

17.02 Penalty amount can be realized from the proceeds of the Contract Performance Bank

Guarantee, if the situation so warrants.

17.03 Extension of delivery period could be with / without levy of penalty with the discretion of

Owner.

18.0 RIGHT OF WAY:

Right of way issues, if any, arising during execution of the works shall have no liability on the

Owner. These issues shall be settled at the sole discretion of the Contractor. The Owner shall

however extend all possible help to the Contractor including discussion with the local

authorities for early resolution of these issues.

19.0 CONTRACTOR’S DEFAULT:

19.01 If the Contractor neglects to execute the works with due diligence and expedition or refuses

or neglects to comply with any reasonable order given to him, in writing by the Engineer in

connection with the works or contravenes the provisions or the contract, the Owner may

give notice in writing to the Contractor to make good the failure, neglect or contravention

complained of. Should the Contractor fail to comply with the notice within thirty (30) days

from the date of serving the notice, the Owner shall be at liberty to employ other workmen

and forthwith execute such part of the works as the contractor may have neglected to do or

if the Owner thinks fit, without prejudice to any other right, he may have under the Contract

to take the work wholly or in part out of the Contractor’s hands and re-contract with any

other person or persons to complete the works or any part thereof and in that event the

Owner shall have free use of all Contractor’s equipment that may have been at the time on

the Site in connection with the works without being responsible to the Contractor for fair

wear and tear thereof and to the exclusion of any right of the Contractor over the same, and

the Owner shall be entitled to retain and apply any balance which may otherwise be due on

the Contract by him to the Contractor, or such part thereof as may be necessary, to the

payment of the cost of executing the said part of works or of completing the works as the

case may be. If the cost of completing of works or executing part thereof as aforesaid shall

exceed the balance due to the Contractor, the Contractor shall pay such excess. Such

payment of excess amount shall be independent of the liquidated damages for delay which

the Contractor shall have to pay if the completion of works is delayed.

19.02 In addition, such action by the Owner as aforesaid shall not relieve the Contractor of his

liability to pay liquidated damages for delay in completion of works.

19.03 Such action by the Owner as aforesaid the termination of the Contract under this clause shall

not entitle the Contractor to reduce the value of the Contract Performance Guarantee nor

Page 12 of 51

the time thereof. The Contract Performance Guarantee shall be valid for the full value and

for the full period of the Contract including guarantee.

20.0 TERMINATION OF CONTRACT ON OWNER’S INITIATIVE:

20.01 Owner reserves the right to terminate the Contract either in part or in full due to reasons

other than those mentioned under clause entitled ‘Contractor’s Default’. The Owner shall in

such an event give fifteen (15) days notice in writing to the Contractor of his decision to do

so.

20.02 The Contractor upon receipt of such notice shall discontinue the work on the date and to the

extent specified in the notice, make all reasonable efforts to obtain cancellation of all orders

and Contracts to the extent they related to the work terminated and terms satisfactory or

the Owner, stop all further sub-contracting or purchasing activity related to the work

terminated, and assist Owner in maintenance, protection, and disposition of the works

acquired under the Contract by the Purchaser. In the event of such a termination the

Contractor shall be paid compensation, equitable and reasonable, dictated by the

circumstance prevalent at the time of termination to be determined by the arbitrator

without stopping the work but to carry out the left over work to other agency.

20.03 If the Contractor is an individual or a proprietary concern and the individual or the

proprietor dies and if the Contractor is a partnership concern and one of the partners dies

then unless the Owner is satisfied that the legal representatives of the individual Contractor

or of the proprietor of the propriety concern and in the case of partnership, the surviving

partners, are capable of carrying out and in the case of partnership, the surviving partners,

are capable of carrying out and completing the Contract the Owner shall be entitled to

cancel the Contract as to its uncompleted part without being in any way liable to payment of

any compensation to the estate of deceased Contractor and /or to the surviving partners of

the Contractor’s firm on account of the cancellation of the contract. The decision of the

Owner that the legal representatives of the deceased Contractor or surviving partners of the

Contractor’s firm cannot carry out and complete the contract shall be final and binding on

the parties. In the event of such cancellation the Owner shall not hold the estate of the

deceased Contractor and/ or the surviving partners of the Contractor’s firm liable to

damages for not completing the Contract.

21.0 FORCE MAJEURE: -

The Contractor shall not be liable for any penalty for delay or for failure to perform the

contract for reasons of Force Majeure such as “acts of God, acts of the Public enemy, acts of

Govt., Fires, Flood, Epidemics, Quarantine restrictions, Strikes, Freight Embargos and

provided that the Contractor shall within ten (10) days from the beginning of such delay

notify the Owner in writing of the cause of delay. The Owner shall verify the facts and grant

extension as facts justify.

22.0 EXTENSION OF TIME: -

If the delivery of the equipments / materials is delayed due to reasons beyond the control of

the Contractor, the Contractor shall immediately inform well in advance of his claim for an

extension of time. The Owner on receipt of such notice may agree to extend the contract

period as may be reasonable but without prejudice to other terms & conditions of the

contract.

23.0 SAFETY PRECAUTIONS:-

The agency shall observe all applicable regulations regarding safety at the Site. Any

compensation due on account of accident at site shall be to the contractor’s account.

Page 13 of 51

24.0 STORE:-

Storing of materials from supply to erection shall be arranged by the contractor at his own

cost. No compensation shall be made by the Owner for any damage or loss of materials

during storing, transit transportation and at the time of erection.

25.0 INSURANCE: -

Contractor shall arrange adequate Transit-cum-storage-cum-erection policy and shall

submit the copy of the same to the Owner. The policy shall initially remain valid for a period

of sixty days over & above of the Contract completion period and shall be extended as

required till handing over. Contractor shall be responsible for lodging of claim with the

insurer as well as for all required follow up with the insurer for settlement of claim in case of

loss/damage/theft of material during transit/storage/erection till the completed works is

handed over to the Purchaser and is accepted by the authorized representative of the

Purchaser in writing.

Contractor shall also arrange adequate cover for his employees / labourers engaged in the

works as well as arrange third party insurance cover to indemnify any possible damages to

public at large not connected with the works process. Any claim(s) pertaining to this shall be

the responsibility of the Contractor.

The contractor shall undertake free replacement of the materials damaged or lost during

transit, which will be intimated by the Consignee within 30 days of receipt of the materials at

Owner’s stores.

26.0 ENGINEER IN CHARGE:-

Authorized Engineer of the Owner shall be the Engineer in charge for the Project. The same

shall be intimated at the time of issue of Work Order.

27.0 CONTRACT PERFORMANCE BANK GUARANTEE:-

27.01 Within 15 days of issue of the Work Order or Letter of Award, whichever is earlier, the

Contractor shall submit Contract Performance Bank Guarantee issued by a scheduled Bank,

in favour of the Owner, covering 10% of the total value of the work order.

27.02 The said Bank Guarantee shall be prepared in the prescribed Performa as attached in

Annexure - III. The Bank Guarantee furnished shall be executed on Non-judicial Stamp paper

worth of Rs 100/- (Rupees Hundred only), purchased in the name of the issuing bank, as per

the prevalent rules. The Bank Guarantee so provided shall be en-cashable on the Aska

branch of the issuing Bank.

27.03 The Contract Performance Bank Guarantee shall remain valid for a period not less than 90

days over and above the guarantee period, basing on stipulated completion period in the

W.O. towards security and acceptance thereof, failing which the work orders (W.O) shall not

be issued to the successful bidder.

27.04 No interest shall be allowed by the Owner on the above Performance Security Deposit.

27.05 If the Contractor fails to submit the required CPBG, the required CPBG amount shall be

recovered from the contractor @ 10% from each RA bills.

28.0 TERMS OF PAYMENT:

28.01 90% (Ninety percent) of contract price on pro-rata basis along with taxes and duties shall be

paid progressively (after necessary advance adjustment with interest as applicable) for each

completed items of work certified by the Jr. Manager or Asst. Manager/SDO concerned

against each calendar month by first week of the succeeding months along with utilization

certificate. No payment shall be released if the accounts for utilization of materials unless

follow with proper certification by the concerned Jr. Manager or Asst. Manager/SDO within

Page 14 of 51

30 days of submission of claim subject to certification by Owner’s Engineer-in-charge on the

basis of check points involved in such items of work.

28.02 Balance 10% (Ten percent) of contract price shall be paid after completion of all works,

envisaged under this package including any additions and alterations, testing &

commissioning, return of dismantled materials/ un-used free supply material, taking over

certificate and entire stretch is fully ready for commercial operation. The payments shall be

subjected to clearance from electrical inspectorate.

29.0 PAYING OFFICER:

Executive Engineer of concerned division along with the DDO concerned division shall be the

paying officer of the said work, subject to submission of the following documents.

I) Tax Invoice in Triplicate duly certified by the Engineer-In-Charge (Invoice must

contain GST registration No., PAN, HT license etc.)

II) Bank Guarantee approved by concerned Executive Engineer or Superintending

Engineer, Electrical Circle, Aska after receiving confirmation from concerned bank.

III) Guarantee Certificate approved by Executive Engineer concerned.

IV) All Inspection /Testing certificates are approved by Engineer in charge against

contract supply items. All materials inspection report must be submitted along with

the bills.

V) Work Completion Certificate for each completed work duly certified by the

Engineer-In-Charge.

VI) Hand Over / Taken over report duly acknowledged.

VII) Electrical Inspection Report.

VIII) Material utilization certificate of Owner Supply Material (if any) duly certified by the

Engineer-In-Charge.

IX) Copies of all Statutory documents such as Valid Labour License, valid HT License from

ELBO Odisha / Electrical Project Licenses, EPF Challan, ESI Challan, WCT payment

Challan, PAN Card, Copy of and any other documents as required by the paying

Officer.

X) Certificate from Engineer-In-Charge that, “all the work has been done as per the

technical specification / latest REC specification as well confirming to latest edition of

the corresponding Indian Standard Codes”.

Besides above, any other standard documents as required for passing & processing the

bills for payment under this contract. Owner shall notify the paying officer for the project at

the time of issue of Work Order.

30.0 OWNER’S RIGHTS: -

The Owner reserves the right to accept any bid or reject any or all bids or cancel / withdraw

invitation of bid or to vary the quantity for placement of order without assigning any reason

to such decision. Such decision by the Owner shall bear no liability.

31.0 DISTINCT MARK ON EQUIPMENT AND MATERIALS:

All the major equipments and materials required for the works shall have distinct mark of

Owner, Scheme BGJY, Financial Year either by way of punching on metal part(s) and /or in

built during casting and /or painting as per common practice and /or as mutually agreed.

This should be clearly visible in day light in naked eyes.

32.0 DISPUTE RESOLUTION AND JURISDICTION: -

(a) Any disputes arising out of this contract shall be referred to the Authorised Officer,

Southco Utility who shall decide the case as sole Arbitrator.

(b) For the purpose of dispute resolution, this agreement shall be governed by the

provision of Arbitration and Conciliation Act, 1996.

Page 15 of 51

(c) All disputes shall be subjected to exclusive jurisdiction of the Courts at Berhampur

and the writ jurisdiction of Hon’ble High Court of Odisha at Cuttack.

33.0 TRANSFER AND SUB-LETTING

The Contractor shall not sublet, transfer, assign or otherwise part with the Contract or any

part thereof, either directly or indirectly, without prior written permission of the Owner.

34.0 SUBMITTALS REQUIRED AFTER AWARD OF CONTRACT

34.01 Within immediate effective date of contract the contractor shall provide three copies of an

outline program of production, inspection, testing, delivery, survey, erection, pre-

commissioning and commissioning in chart form. Included in the program will be the

detailed schedule of drawing to be submitted.

34.02 The periodic progress report as required by the Owner shall be submitted by the contractor

as per the format prescribed by the Engineer in Charge.

35.0 APPROVAL PROCEDURE OF SUB VENDORS & DRAWINGS OF BOUGHT OUT MATERIALS

Three copies of all drawings, GTP, QAP shall be submitted for approval as per REC standard /

corresponding IS and three copies for any subsequent revision.

36.0 TAKING OVER

36.1 Upon successful completion of all the tests to be performed at site on equipment / materials

supplied, erected and commissioned by the contractor, the supply engineer shall issue to the

contractor a taking over certificate as a proof of the final acceptance of the equipment /

materials on a written request within 10 days of commercial operation. Such certificate shall

not be un-reasonably withheld nor will the engineer delay the issuance thereof on account

of minor omission or defects, which do not affect the commercial operation and / or cause

any serious to the equipment/material. The conditional Taking over Certificate can be issued

if any minor omission or defects pointed by the Engineer-in-Charge/Supervising

Officer/Electrical Inspector. The Contractor should rectify those defects within a month of

conditional T.O.C failing which Owner will rectify those by replacing those materials or

engaging other agencies. The amount so involved will be fully recovered from the

Contractor’s bill. Such certificate shall, however, not relieve the contractor of any of his

obligations which otherwise survive by the terms & conditions of the contract after issuance

of such certificate.

36.2 For the satisfaction of Owner about quality, the Owner shall have unreserved right for

arrangement of testing of equipment/ materials and the complete system independently by

self or any other agency chosen by the Owner. The contractor is expected to agree and

extend necessary help during such test if necessary.

37.0 LATENT DEFECT WARRANTY

37.01 The period of latent defect warranty in terms of this bidding documents, shall be limited to

one (01) years from the date of completion of Guarantee period.

38.0 INDEMNIFY

38.01 The Contractor, its successor and assignee shall indemnify the Owner, its successor and

assignee from all current & future liabilities that may arise out of Turn Key Contract(s)

entered into between the Owner & the Contractor under this BGJY (SI) Programme. The

Owner in term shall indemnify the GoO & GRIDCO.

Page 16 of 51

SECTION – II

ANNEXURES

EOI No/ BGJY/ Southco Utility/ Aska Circle/ Partially or Fully

Turnkey/06/2018-19/Dt.05.09.2018

Page 17 of 51

ANNEXURE – I

BID PROPOSAL LETTER

Electrical Installation of Works under SOUTHCO UTILITY

Bidder’s Name and Address: __________________________________

Bid Proposal Reference: ___________________________________

Person to be contacted: ___________________________________

Designation: ___________________________________

Telephone No. : ___________________________________

E-mail: ___________________________________

Fax No. : ___________________________________

To,

Superintending Engineer Electrical Circle, Aska

Dear Sir,

I the undersigned bidder have read and examined the detailed Conditions of the

EOI specification and bidding documents for execution of various electrical

installations works and do herewith submit our bid for the following packages:

Sl.

No.

Name of the

Owner

Name of the

Package

Estimated Cost

(Rs. in Cr.)

Dated this ………………………..day of ………………………………20…..

Thanking you,

Yours faithfully,

(Signature of the Authorized Signatory)

Name ……………………………

Designation ……………………………..

Seal of the company………..

Page 18 of 51

ANNEXURE – II

DECLARATION FORM

To,

Superintending Engineer

Electrical Circle, Aska

Sir,

Having examined the above General Conditions of the EOI and conditions referred

to therein

1) I / We the undersigned do hereby offer to execute the contract covered there

on in complete shape in all respects as per the rules entered in the attached

contract schedule of prices in the EOI.

2) I / We do hereby under take to have executed the contract within the time

specified in the EOI.

3) I / We do hereby guarantee the technical particulars given in the EOI

supported with necessary reports from concerned authorities.

4) I / We do hereby agree to furnish the composite Bank Guarantee in the

manner specified / acceptable by SOUTHCO Utility & for the sum as

applicable to me / us within fifteen days of issue of Letter of intent / Work

Order, in the event of Work order being decided in my / us favour , failing

which I / We clearly understand that the said LOI / W.O. shall be liable to be

withdrawn by the Owner.

Signed this…………….Day of……………………20…

Yours faithfully

(Signature of Bidder with Seal of Company)

Page 19 of 51

ANNEXURE – III

PROFORMA FOR CONTRACT PERFORMANCE BANK GUARANTEE

(To be executed on Rs. 100/- Non-judicial Stamp Paper purchased in the name of

the BG Issuing Bank)

This Guarantee Bond is executed this ____ day of ___________________________ by us, _____________________________________________________ Bank at ___________________ P.O.__________ P.S. ____________Dist ________________ State __________

Whereas SOUTHCO UTILITY ,Head Office: Courtpeta, Berhampur-760004 (here in after called “Owner”) has placed Work Order No._________ Dt.___________ (hereinafter called “Agreement”) with M/s_________________ _________________________ (hereinafter called “the Contractor”) for supply and installation of ________________ (description of the works) and whereas Owner has agreed (1) to exempt the Contractor from making payment of performance security deposit, (2) to release 100% payment of the cost of work as per the said agreement and (3) to exempt from performance guarantee on furnishing by the Contractor to Owner a composite Bank Guarantee of the value of 10% (ten percent) of the Contract price of the said Agreement. 1. Now, therefore, in consideration of Owner having agreed (1) to exempt the Contractor for making payment of security deposit, (2) to release 100% payment to the Contractor and (3) to exempt from furnishing performance guarantee in terms of the said Agreement as aforesaid, we the ____________________ Bank, Address ____________________________ (code No. ________) (hereinafter referred to as “the Bank”) do hereby undertake to pay to the Owner an amount not exceeding Rs._____________ (Rupees _______________________________ ) only against any loss or damage caused to or suffered by the Owner by reason of any breach by the said Contractor(s) of any of the terms or conditions contained in the said Agreement.

2. We, the ______________________ Bank do hereby undertake to pay the amounts due and payable under the guarantee without any demur, merely on a demand from Owner stating that the amount claimed is due by way of loss or damage caused to or suffered by Owner by reason of any breach by the said Contractor(s) of any of the terms or conditions contained in the said Agreement or by the reason of any breach by the said Contractor’s failure to perform the said Agreement. Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the Bank under this Guarantee. However, our liability under this guarantee shall be restricted to an amount not exceeding Rs.___________ (Rupees _________________________________________ ) only.

3. We, the ________________________ Bank also undertake to pay to Owner any money so demanded not withstanding any dispute or dispute raised by the Contractor(s) in any suit or proceeding instituted/ pending before any court or Tribunal relating thereto our liability under this Agreement being absolute and irrevocable. The payment so made by us under this bond shall be valid discharge of our liability for payment there under and the Contractor(s) shall have no claim against us for making such payment. 4. We, the _________________________ Bank further agree that the guarantee herein contain shall remain in full force and effect during the period that would be taken for the performance of the said Agreement and it shall continue to remain in force endorsable till all the dues of Owner under by virtue of the said Agreement have been fully paid and its claim satisfied or discharged or till Purchaser certifies that the terms and conditions of the said Agreement have been fully and properly carried out by the said Contractor(s) and

Page 20 of 51

accordingly discharge this guarantee and will not be revoked by us during the validity of the guarantee period. Unless a demand or claim under this guarantee is made on us or with our Aska branch at ________________________ (Name, address of the Aska branch and code No.) in writing on or before __________________ (date) we shall be discharged from all liability under this guarantee thereafter. 5. We, the _________________________ Bank further agree that Owner shall have the fullest liberty without our consent and without affecting in any manner our obligations hereunder to vary any of the terms and conditions of the said Agreement or to extend time of performance by the said Contractor(s) and we shall not be relieved from our liability by reason of any such variation or extension being granted to the said Contractor(s) or for any forbearance act or omission on part of Owner or any indulgence by Owner to the said Contractor(s) or by any such matter or thing whatsoever which under the law relating to sureties would but for this provisions have effect of so relieving us. 6. The Guarantee will not be discharged due to change in the name, style and constitution of the Bank and or Contractor(s).

7. We, the _________________________ Bank lastly undertake not to revoke this Guarantee during its currency except with the previous consent of the Owner in writing.

Dated ___________ the __________ day of Two thousand _________ . Not withstanding anything contained herein above.

Our liability under this Bank Guarantee shall not exceed Rs.______________ (Rupees _______ ____________________________________________________________________ ) only.

The Bank Guarantee shall be valid up to _____________________ only.

Our ………………………. branch at Aska (Name & Address of the Aska branch) is liable to pay the guaranteed amount depending on the filing of claim and any part thereof under this Bank Guarantee only and only if you serve upon us at our Aska branch a written claim or demand and received by us at our Aska branch on or before Dt.__________ otherwise bank shall be discharged of all liabilities under this guarantee thereafter.

For _____________________________________ (Indicate the name of the Bank)

N.B.:

(1) Name of the Contractor:

(2) No. & date of the Work order/ agreement:

(3) Amount of W.O:

(4) Name of Work:

(5) Name of the Bank:

(6) Amount of the Bank Guarantee:

(7) Name, Address and Code No. of the Aska Branch of the Issuing Bank:

(8) Validity period or date up to which the agreement is valid:

(9) Signature of the Constituent Authority of the Bank with seal:

(10) Name & addresses of the Witnesses with signature:

(11) The Bank Guarantee shall be accepted only after getting confirmation from

the issuing Branch & from main branch/specified branch at Aska of issuing Bank

Page 21 of 51

ANNEXURE – IV

LETTER OF COMPLIANCE OF QUALIFYING REQUIREMENT

(In case of Bidder being a Single Firm)

To

Superintending Engineer, Electrical Circle, Aska

Dear Sirs,

I/We ……………. (Name of Bidder) are submitting the bid as a single firm. In support of our

meeting the Qualifying requirements (QR) for bidders, stipulated in this EOI specification,

we furnish herewith the details/documents etc. as follows.

Table – A: Previous Works Experience:

Package

Quoted

for

Description

of Proposed

Works

Tender

Qty

Qty Installed & Commissioned

Sl.

No. FY

Name

of

Client WO Ref

Qty

Installed

Documents

provided in

proof of having

executed the

works during

the relevant

FY.

Table – B: Average Annual Turnover:

Package Quoted for

Estimated Cost

of the Package

(Rs. in Lakh)

Annual Turnover Data

(Rs. in Lakh)

Financial Year

Turnover

(Rs. in Lakh)

Last Three Year preceding to

the year of tender

Total Estimated Cost of

the packages quoted for

Average Turnover

Page 22 of 51

Table – C: Access to Credit Facility:

Package Quoted for

Estimated Cost

of the Package

(Rs. in Lakh)

Liquid Assets as on

31.03.2018 Credit Facility

Description

(Rs. in

Lakh) Description (Rs. in Lakh)

Cash in

Hand Cash Credit

Cash at

Bank LC

Total Estimated Cost

of the packages

quoted for

Fixed

Deposits

Others (Pl

Specify)

One fifth of the total

Estimated Cost as

above.

Total Liquid

Assets

Total Credit

Facility

Note: Continuation sheets, of like size and format, may be used as per Bidder’s

requirements and annexed to this Schedule.

I/We declare that we are fulfilling the qualifying requirements as per EOI

For & on behalf of ………… (Name of the Bidder).

Page 23 of 51

ANNEXURE – V

DETAILS OF COMMERCIAL DEVIATIONS

Bidder’s Name & Address

To

Superintending Engineer, Electrical Circle, Aska

Sub: Commercial Deviation for Construction of Name of the project.

Dear Sir,

The following are the Commercial Deviations and variations from and exceptions to

the specifications and documents for the subject Project. These deviations and

variations are exhaustive. Except for these deviations, the entire work shall be

performed as per your specifications and documents

Volume/Clause

Ref./Page

No.

As specified in the

Specification

Commercial deviation and variation to

the specification

Date: (Signature) …………………..

Place: (Printed Name) ……………….

(Designation) …………………..

(Common Seal) …………………

Note: 1. Continuation sheets, of like size and format, may be used as per Bidder’s

requirements and annexed to this Schedule.

2. This will be read out during opening.

Page 24 of 51

ANNEXURE –VI

DETAILS TECHNICAL DEVIATIONS

Bidder’s Name & Address

To

Superintending Engineer, Electrical Circle, Aska Sub: Technical Deviation for Construction of ………………. (Name of the Project)

Dear Sir,

The following are the Technical Deviations and variations from and exceptions to the

specifications and documents for the subject package. These deviations and variations are

exhaustive. Except for these deviations, the entire work shall be performed as per your

specifications and documents

Volume/Clause Ref./Page No.

As specified in the

Specification / Relevant

ISS

Technical deviation and

variation to the

specification

Date: (Signature) …………………..

Place: (Printed Name) ……………….

(Designation) …………………..

(Common Seal) …………………

Note: 1. Continuation sheets, of like size and format, may be used as per Bidder’s

requirements and annexed to this Schedule.

2. The deviations and variations, if any, shall be brought out separately for each of the

equipment.

Page 25 of 51

ANNEXURE – VII

WORK COMPLETION SCHEDULE

Bidder’s Name & Address

To

Superintending Engineer, Electrical Circle, Aska

Dear Sirs,

We hereby declare that the following Work Completion Schedule shall be followed by us for

the purpose of subject package

Sl. No Description of Work Period in Days( from the date of WO)

1 Completion of Survey:

2 Offering of GTP, Drawing of Material for approval:

3 Procurement materials:

4 Establishment of site store:

5 Erection work:

6 Offering for Inspection:

7 Charging of Installation:

8 Handing over the Installation:

Date: (Signature) …………………..

Place: (Printed Name) ……………….

(Designation) …………………..

(Common Seal) ………………..

Page 26 of 51

ANNEXURE – VIII CHECK LIST

Bidder’s Name & Address

To

Superintending Engineer, Electrical Circle, Aska

Dear Sirs,

Sl.

No. Item Description

Status of the

Submission of

data

Remarks

1 2 3 4

1 Contractor License Yes/ No

2 Labour License Yes/ No

3 Professional Tax registration

no. Yes/ No

4 ESI registration no. Yes/ No

5 GST registration no. Yes/ No

6 PAN No Yes/ No

7 PF registration no. Yes/ No

8 Bid Submission Letter Yes/ No

9 Declaration Letter Yes/ No

2. Qualifying Data Yes /No

3. Commercial Deviation Yes /No

4. Technical Deviation Yes /No

7. Period of completion Yes/No

If, yes please state here the period of

completion.

8. Additional information offered

by bidder State here briefly

N.B.:- The contents of this schedule will be read out during opening.

Date: (Signature) …………………..

Place: (Printed Name) ……………….

(Designation) …………………..

(Common Seal) ………………..

Page 27 of 51

SECTION – III

PRICE BID

EOI No/ BGJY/ Southco Utility/ Aska Circle/ Partially or Fully

Turnkey/06/2018-19/Dt.05.09.2018

Page 28 of 51

ANNEXURE-IX EOI/ BGJY/ SOUITHCO UTILITY/ ASKA CIRCLE/ Partial or Full Turnkey/06/2018-19/Dt.05.09.2018

PRICE FOR CONSTRUCTION OF 11 KV NEW FEEDER :- (Including Supply of Material)

Sl. No.

Item-Description Unit Qty. Unit

supply in Rs

Unit installation

in Rs

Total unit value

(Supply + Installation)

in Rs

Total Cost (Supply +

Installation) of the Item

in Rs

1 2 3 4 5 6 7=5+6 8=4x7

A

11KV Line (3 phase) with 55mm2 AAA Conductor, 9mtr 300Kg PSC pole, Average Span lengrh =70 mtrs (With following break up in approximate as per Standard condition) per KM of line.

1 11 KV V Cross Arm( 10.2 Kg each) No 12

2 Back Clamp for 11 KV "V "Cross Arm No 12

3 Top (F) Clamp for PSC Pole No 12

4 11 KV Disc Insulator T & C Type No 15

5 11 KV hard ware fitting T & C Type No 15

6 11 KV Pin Insulator 320 CD No 42

7 11 KV GI Pin No 42

8 HT Stay Set Complete No 6

9 11 KV Stay insulator No 6

10 HT Stay clamp for PSC Pole / RS Joist (GI)

Pair 6

11 7/10 SWG Stay wire kg 60

12 Earthing device / Support Coil type (GI)

No 14

13 Base Plate for Support No 14

14

Cement concreting for stay anchor plate with C.C. 1:3:6 by using 4cm size hard granite metal= 0.45Mtrx0.45Mtrx1.5Mtr= 0.3Cum

No 6

15

Cement concreting for support with C.C. 1:3:6 by using 4Cm size hard granite metal= 0.45Mtrx0.45Mtrx1.5Mtr = 0.3Cum for 2 Nos cut-point

No 14

16 MS nuts, bolts and washers kg 25

17 Saundries(Paint, Danger board, Clamp, Connectors, Anticlimbing device, Binding tape etc

Ls 1

18 100x50x6 mm channel for straight Cross arm 1.2 mtr each 6 nos & 0.2 mtr long 6 Nos.

kg 77

19 9 mtr long 300 KG PSC pole No 14

20 55 mm2 AAAC conductor Km 3

Page 29 of 51

Total Price

(in %)

Add SGST @applicable on the date of

bidding(***)

Add CGST @applicable on the date of

bidding(***)

Total unit cost

NOTE :-

1. All the materails as per REC Standard required to complete the line works as detailed above are to be supplied by the bidder for installation at site except Transformer.

2. Bidder shall quote price for the above items as per the heads mentioned. Supply as well as erection prices of all the other accessories, assemblies, components, part etc associated with these items, not mentioned separately but required for completion of whole work & its commissioning.

3. The quantity break up for standatd condition of work is indicative only for the purpose of EOI quoting by the bidder. The actual quantity shall be as per site condition and accordingly payment shall be made after certification by Engineer In Charge.

4. * Taxable value of supply includes packing, forwarding charges, freight & insurance, loading & unloading charges but excluding of GST. ** Erection charges excluding of GST ***The rate of GST on the date of bidding shall be quoted by the Bidder

Page 30 of 51

ANNEXURE-X

EOI/ BGJY/ SOUITHCO UTILITY/ ASKA CIRCLE/ Partial or Full Turnkey/06/2018-19/Dt.05.09.2018

CONVERSION OF 11KV LINE FROM 2PHASE TO 3PHASE :- (Including Supply of Material)

Sl. No.

Item-Description Unit Qty. Unit

supply in Rs

Unit installation in Rs

Total unit value

(Supply + Installatio

n) in Rs

Total Cost (Supply +

Installation) of the

Item in Rs

1 2 3 4 5 6 7=5+6 8=4x7

1 Top Bracket (F clamp) No 15

2 11KV Pin Insulator No 15

3 11KV G.I. Pin No 15

4 11Kv Disc insulator (T&C) No 5

5 11Kv hard wire fitting (T&C) No 5

6 M.S. Nut, Bolt & Washer Set 10

7 55 mm2AAA conductor No 1

8 Sundries (paint, danger board, aluminium binding tape and wire, insulating tape, jumpering materials, Anticlimbing device and other accessories etc )

No 1

Total Price for Conversion of 11KV Line from 2Phase to 3Phase

Per CKM

1

(in %)

Add SGST @applicable on the date of bidding(***)

Add CGST @applicable on the date of bidding(***)

Total unit cost

NOTE :-

1. All the materails as per REC standard required to complete the line works as detailed above are to be supplied by the bidder for installation at site except transformer.

2. Bidder shall quote price for the above items as per the heads mentioned. Supply as well as erection prices of all the other accessories, assemblies, components, part etc associated with these items, not mentioned separately but required for completion of whole work & its commissioning.

3. The quantity break up for standatd condition of work is indicative only for the purpose of EOI quoting by the bidder. The actual quantity shall be as per site condition and accordingly payment shall be made after certification by Engineer In Charge.

4. * Taxable value of supply includes packing, forwarding charges, freight & insurance, loading & unloading charges but excluding of GST. ** Erection charges excluding of GST ***The rate of GST on the date of bidding shall be quoted by the Bidder

Page 31 of 51

ANNEXURE-XI

EOI/ BGJY/ SOUITHCO UTILITY/ ASKA CIRCLE/ Partial or Full Turnkey/06/2018-19/Dt.05.09.2018

INSTALLATION OF DISTRIBUTION SUBSTATION ( With 25KVA, 11/0.4KV Transformer) :- (Including Supply of Material)

Sl. No.

Item-Description Unit Qty. Unit

supply in Rs

Unit installation

in Rs

Total unit value

(Supply + Installation)

in Rs

Total Cost (Supply +

Installation) of the Item

in Rs

1 2 3 4 5 6 7=5+6 8=4x7

A DP Mounted Distribution Substation with 25KVA, 11/0.4KV Distribution Transformer (With following break up as per standard condition)

1 9 mtr long 300 Kg PSC pole No 2

2 Pressure Channel 100x50x6 mm 2.8 mtr long 2Nos (9.2kg/mtr)

kg 52

3 Transformer mounting Channel 100x50x6 mm 2.8 mtr long 2Nos (9.2kg/mtr)

kg 52

4 AB Switch & HG fuse mounting Channel (75x40x6mm) 2.8 mtr long 4 Nos (6.8kg/mtr)

kg 76

5 Transformer belting 50x50x6 mm angle 2.8 mtr long 2 nos(4.5kg /mtr) with side angle(total 7 mtr)

kg 32

6 Angle for mounting LT kit kat fuse (50x50x6) mm 2.8 mtr long 2nos (4.5kg/mtr) with side angle,total 3.0mtr

Kg 14

7 11KV Disc Insulator T& C type.

No 3

8 11 kv hard ware fitting T&C type

No 3

9 11 kv 200 A AB switch 3pole Set 1

10 11 kv 200A HG fuse 3pole Set 1

11 12 KV ,10 KA Lightining Arrestor

No 3

12 kit kat fuse for 25 KVA S/S No 3

13 LT 3 1/2 core 50 mm2 PVC cable

Mtr 3

14 HT stay set complete No 2

15 Stay insulator No 2

16 Stay clamp Pair 2

17 7/10 SWG stay wire kg 20

Page 32 of 51

18 G.I pipe earthing 40mm dia medium gauge 3mtr long

No 3

19 Earthing device (coil type) No 2

20 No-6 GI wire for earthing kg 20

21 Cement concreting for stay anchor plate with C.C. 1:3:6 by using 4cm size hard granite metal= 0.45Mtrx0.45Mtrx1.5Mtr= 0.3Cum

No 2

22 Cement concreting for support with C.C. 1:3:6 by using 4Cm size hard granite metal= 0.45Mtrx0.45Mtrx1.5Mtr = 0.3Cum

No 2

23 Materials for masonary work for earth pit Charcoal ,salt etc for earthing

No 3

24 Base plate for support No 2

25 MS nuts &bolts kg 25

26 Saundries (Aluminium binding tap ,insulating Tap , ,Anticlimbing device ,paint ,danger Board etc)

Ls 1

27 Fencing size 8'x12' with 10 nos RCC piller and 3ply GI barbed wire & Grill gate & locking arrangement

Ls 1

28 Sand and metal spreading Ls 1

29 25 kva 11/0.4 kv Transformer No 1

Total unit cost Per SS

1

(in %)

Add SGST @applicable on the date of bidding(***)

Add CGST @applicable on the date of bidding(***)

Total unit cost

1. All the materials as per REC Standard required completing the line works as detailed above are to be supplied by the bidder for installation at site except transformer.

2. Bidder shall quote price for the above items as per the heads mentioned. Supply as well as erection prices of all the other accessories, assemblies, components, part etc associated with these items, not mentioned separately but required for completion of whole work & it’s commissioning.

3. The quantity break up for standard condition of work is indicative only for the purpose of EOI quoting by the bidder. The actual quantity shall be as per site condition and accordingly payment shall be made after certification by Engineer In Charge.

4. * Taxable value of supply includes packing, forwarding charges, freight & insurance, loading & unloading charges but excluding of GST. ** Erection charges excluding of GST ***The rate of GST on the date of bidding shall be quoted by the Bidder

Page 33 of 51

ANNEXURE-XII

EOI/ BGJY/ SOUITHCO UTILITY/ ASKA CIRCLE/ Partial or Full Turnkey/06/2018-19/Dt.05.09.2018

INSTALLATION OF DISTRIBUTION SUBSTATION ( With 63KVA, 11/0.4KV Transformer) :- (Including Supply of Material)

Sl. No.

Item-Description Unit Qty. Unit

supply in Rs

Unit installation in Rs

Total unit value

(Supply + Installatio

n) in Rs

Total Cost (Supply +

Installation) of the

Item in Rs

1 2 3 4 5 6 7=5+6 8=4x7

A DP Mounted Distribution Substation with 63KVA, 11/0.4KV Distribution T/F (With following break up as per standard condition)

1 9 mtr long 300 Kg PSC pole No 2

2 Pressure Channel 100x50x6 mm 2.8 mtr long 2Nos (9.2kg/mtr) kg 52

3 Transformer mounting Channel 100x50x6 mm 2.8 mtr long 2Nos (9.2kg/mtr)

kg 52

4 AB Switch & HG fuse mounting Channel (75x40x6mm) 2.8 mtr long 4 Nos (6.8kg/mtr)

kg 76

5 Transformer belting 50x50x6 mm angle 2.8 mtr long 2 nos(4.5kg /mtr) with side angle(total 7 mtr)

kg 32

6 Angle for mounting LT kit kat fuse (50x50x6) mm 2.8 mtr long 2nos (4.5kg/mtr) with side angle,total 3.0mtr

Kg 14

7 11KV Disc Insulator T& C type. No 3

8 11 kv hard ware fitting T&C type

No 3

9 11 kv 200 A AB switch 3pole Set 1

10 11 kv 200A HG fuse 3pole Set 1

11 12 KV 10 KA Lightining Arrestor

No 3

12 kit kat fuse for 63 KVA S/S No 3

13 3 1/2 core 95mm2 LT PVC cable Mtr 15

14 HT stay set complete No 2

15 Stay insulator No 2

16 Stay clamp Pair 2

17 7/10 SWG stay wire kg 20

18 G.I pipe earthing 40mm dia medium gauge 3mtr long

No 3

19 Earthing device (coil type) No 2

20 No-6 GI wire for earthing kg 20

Page 34 of 51

21 Cement concreting for stay anchor plate with C.C. 1:3:6 by using 4cm size hard granite metal= 0.45Mtrx0.45Mtrx1.5Mtr= 0.3Cum

No 2

22 Cement concreting for support with C.C. 1:3:6 by using 4Cm size hard granite metal= 0.45Mtrx0.45Mtrx1.5Mtr = 0.3Cum

No 2

23 Materials for masonary work for earth pit Charcoal ,salt etc for earthing

No 3

24 Base plate for support No 2

25 MS nuts,bolt & washer of assorted size

kg 25

26 Saundries (Aluminium binding tap ,insulating Tap , ,Anticlimbing device ,paint ,danger Board etc)

Ls 1

27 Fencing size 8'x12' with 10 nos RCC piller and 3ply GI barbed wire & Grill gate & locking arrangement

Ls 1

28 Sand and metal spreading Ls 1

29 63 kva 11/0.4 kv Transformer No 1

Total Per SS 1

(in %)

Add SGST @applicable on the date of bidding(***)

Add CGST @applicable on the date of bidding(***)

Total unit cost

NOTE :-

1. All the materails as per REC standard required to complete the line works as detailed above are to be supplied by the bidder for installation at site except transformer.

2. Bidder shall quote price for the above items as per the heads mentioned. Supply as well as erection prices of all the other accessories, assemblies, components, part etc associated with these items, not mentioned separately but required for completion of whole work & its commissioning.

3. The quantity break up for standatd condition of work is indicative only for the purpose of EOI quoting by the bidder. The actual quantity shall be as per site condition and accordingly payment shall be made after certification by Engineer In Charge.

4. * Taxable value of supply includes packing, forwarding charges, freight & insurance, loading & unloading charges but excluding of GST. ** Erection charges excluding of GST ***The rate of GST on the date of bidding shall be quoted by the Bidder

Page 35 of 51

ANNEXURE-XIII

EOI/ BGJY/ SOUITHCO UTILITY/ ASKA CIRCLE/ Partial or Full Turnkey/06/2018-19/Dt.05.09.2018

INSTALLATION OF DISTRIBUTION SUBSTATION ( With 100KVA, 11/0.4KV Transformer) :- (Including Supply of Material)

Sl. No

. Item-Description Unit Qty.

Unit supply in

Rs

Unit installatio

n in Rs

Total unit

value (Supply

+ Installation) in Rs

Total Cost

(Supply +

Installation) of

the Item in

Rs

1 2 3 4 5 6 7=5+6 8=4x7

A DP Mounted Distribution Substation with 100KVA, 11/0.4KV Distribution Transformer (With following break up as per standard condition)

1 9 mtr long 300 Kg PSC pole No 2

2 Pressure Channel 100x50x6 mm 2.8 mtr long 2Nos (9.2kg/mtr)

kg 52

3 Transformer mounting Channel 100x50x6 mm 2.8 mtr long 2Nos (9.2kg/mtr)

kg 52

4 AB Switch & HG fuse mounting Channel (75x40x6mm) 2.8 mtr long 4 Nos (6.8kg/mtr)

kg 76

5 Transformer belting 50x50x6 mm angle 2.8 mtr long 2 nos(4.5kg /mtr) with side angle(total 7 mtr)

kg 32

6 Angle for mounting LT kit kat fuse (50x50x6) mm 2.8 mtr long 2nos (4.5kg/mtr) with side angle,total 3.0mtr

Kg 14

7 11KV Disc Insulator T& C type. No 3

8 11 kv hard ware fitting T&C type No 3

9 11 kv 200 A AB switch 3pole Set 1

10 11 kv 200A HG fuse 3pole Set 1

11 12 KV 10 KA Lightining Arrestor No 3

12 kit kat fuse for 100 KVA S/S No 3

13 3 1/2 core 150mm2 LT PVC cable Mtr 15

14 HT stay set complete No 2

15 Stay insulator No 2

16 Stay clamp Pair 2

17 7/10 SWG stay wire kg 20

Page 36 of 51

18 G.I pipe earthing 40mm dia medium gauge 3mtr long

No 3

19 Earthing device (coil type) No 2

20 No-6 GI wire for earthing kg 20

21 Cement concreting for stay anchor plate with C.C. 1:3:6 by using 4cm size hard granite metal= 0.45Mtrx0.45Mtrx1.5Mtr= 0.3Cum

No 2

22 Cement concreting for support with C.C. 1:3:6 by using 4Cm size hard granite metal= 0.45Mtrx0.45Mtrx1.5Mtr = 0.3Cum

No 2

23 Materials for masonary work for earth pit Charcoal ,salt etc for earthing

No 3

24 Base plate for support No 2

25 MS nuts,bolt & washer of assorted size

kg 25

26 Saundries (Aluminium binding tap ,insulating Tap , ,Anticlimbing device ,paint ,danger Board etc)

Ls 1

27 Fencing size 8'x12' with 10 nos RCC piller and 3ply GI barbed wire & Grill gate & locking arrangement

Ls 1

28 Sand and metal spreading Ls 1

29 100 kva 11/0.4 kv Transformer No 1

Total Per SS 1

(in %)

Add SGST @applicable on the date of bidding(***)

Add CGST @applicable on the date of bidding(***)

Total unit cost

NOTE :-

1. All the materails as per REC standard required to complete the line works as detailed above are to be supplied by the bidder for installation at site except transformer.

2. Bidder shall quote price for the above items as per the heads mentioned. Supply as well as erection prices of all the other accessories, assemblies, components, part etc associated with these items, not mentioned separately but required for completion of whole work & its commissioning.

3. The quantity break up for standatd condition of work is indicative only for the purpose of EOI quoting by the bidder. The actual quantity shall be as per site condition and accordingly payment shall be made after certification by Engineer In Charge.

4. * Taxable value of supply includes packing, forwarding charges, freight & insurance, loading & unloading charges but excluding of GST. ** Erection charges excluding of GST ***The rate of GST on the date of bidding shall be quoted by the Bidder

Page 37 of 51

ANNEXURE-XIV

EOI/ BGJY/ SOUITHCO UTILITY/ ASKA CIRCLE/ Partial or Full Turnkey/06/2018-19/Dt.05.09.2018

UG of DTR 25KVA, 11/0.4KV to 63KVA, 11/0.4KV DP Mounted S/S :- (Including Supply of Material)

Sl. No

. Item-Description Unit Qty.

Unit supply in

Rs

Unit installatio

n in Rs

Total unit

value (Supply

+ Installation) in Rs

Total Cost (Supply + Installation) of the

Item in Rs

1 2 3 4 5 6 7=5+6 8=4x7

1 kit kat fuse 200A No 3

2 Kit kat belting 50x50x6mm angle @ 4.5kg/mtr) total (3mtr)

Kg 14

3 Earthing support (coil type) No 2

4 G.I pipe earthing 40mm dia medium gauge 3mtr long

No 1

5 No 6 G.I wire for earthing Kg 30

6 MS nuts,bolts and washers Kg 5

7 Cost of star rated transformer 63 KVA ,11/0.4KV

No 1

8 LT 3core PVC cable 90 sq.mm . Mtr 15

9 Sundries (almunimum binding Tap , insulating tap, Anti climing device , Danger Board etc)

LS 1

Total unit cost Per Ss 1

(in %)

Add SGST @applicable on the date of bidding(***)

Add CGST @applicable on the date of bidding(***)

Total unit cost

NOTE :-

1. All the materails as per REC standard required to complete the line works as detailed above are to be supplied by the bidder for installation at site except transformer.

2. Bidder shall quote price for the above items as per the heads mentioned. Supply as well as erection prices of all the other accessories, assemblies, components, part etc associated with these items, not mentioned separately but required for completion of whole work & its commissioning.

3. The quantity break up for standatd condition of work is indicative only for the purpose of EOI quoting by the bidder. The actual quantity shall be as per site condition and accordingly payment shall be made after certification by Engineer In Charge.

4. * Taxable value of supply includes packing, forwarding charges, freight & insurance, loading & unloading charges but excluding of GST. ** Erection charges excluding of GST ***The rate of GST on the date of bidding shall be quoted by the Bidder

Page 38 of 51

ANNEXURE-XV

EOI/ BGJY/ SOUITHCO UTILITY/ ASKA CIRCLE/ Partial or Full Turnkey/06/2018-19/Dt.05.09.2018

UG of DTR 25KVA, 11/0.4KV to 100KVA, 11/0.4KV DP Mounted S/S :- (Including Supply of Material)

Sl. No

. Item-Description Unit Qty.

Unit supply in

Rs

Unit installat

ion in Rs

Total unit

value (Supply

+ Installation) in Rs

Total Cost (Supply + Installation) of the

Item in Rs

1 2 3 4 5 6 7=5+6 8=4x7

1 kit kat fuse 400A No 3

2 Kit kat belting 50x50x6mm angle @ 4.5kg/mtr) total (3mtr)

Kg 14

3 Earthing support (coil type) No 2

4 G.I pipe earthing 40mm dia medium gauge 3mtr long

No 1

5 G.I Flat (25X6)mm 1.2/KG/Meter for earthing

Kg 54

6 MS nuts,bolts and washers Kg 5

7 Cost of star rated transformer100KVA ,11/0.4KV

No 1

8 LT 3core PVC cable 185 sq.mm . Mtr 15

9 Sundries(almunimum binding Tap , insulating tap, Anti climing device , Danger Board etc)

LS 1

Total Price Per Ss 1

(in %)

Add SGST @applicable on the date of bidding(***)

Add CGST @applicable on the date of bidding(***)

Total unit cost

NOTE :-

1. All the materails as per REC standard required to complete the line works as detailed above are to be supplied by the bidder for installation at site except transformer.

2. Bidder shall quote price for the above items as per the heads mentioned. Supply as well as erection prices of all the other accessories, assemblies, components, part etc associated with these items, not mentioned separately but required for completion of whole work & its commissioning.

3. The quantity break up for standatd condition of work is indicative only for the purpose of EOI quoting by the bidder. The actual quantity shall be as per site condition and accordingly payment shall be made after certification by Engineer In Charge.

4. * Taxable value of supply includes packing, forwarding charges, freight & insurance, loading & unloading charges but excluding of GST. ** Erection charges excluding of GST ***The rate of GST on the date of bidding shall be quoted by the Bidder

Page 39 of 51

ANNEXURE-XVI

EOI/ BGJY/ SOUITHCO UTILITY/ ASKA CIRCLE/ Partial or Full Turnkey/06/2018-19/Dt.05.09.2018

UG of DTR 63KVA, 11/0.4KV to 100KVA, 11/0.4KV DP Mounted S/S :- (Including Supply of Material)

Sl. No.

Item-Description Unit Qty. Unit

supply in Rs

Unit installation in

Rs

Total unit

value (Supply

+ Installation) in

Rs

Total Cost

(Supply + Installati

on) of the Item

in Rs

1 2 3 4 5 6 7=5+6 8=4x7

1 kit kat fuse 400A No 3

2 Kit kat belting 50x50x6mm angle @ 4.5kg/mtr) total (3mtr)

Kg 14

3 Earthing support (coil type) No 2

4 G.I pipe earthing 40mm dia medium gauge 3mtr long

No 1

5 G.I Flat (25X6)mm 1.2/KG/Meter for earthing

Kg 54

6 MS nuts,bolts and washers Kg 5

7 Cost of star rated transformer 100KVA ,11/0.4KV

No 1

8 LT 3core PVC cable 185 sq.mm . Mtr 15

9 Sundries(almunimum binding Tap , insulating tap, Anti climing device , Danger Board etc)

LS 1

Total Price Per Ss 1

(in %)

Add SGST @applicable on the date of bidding(***)

Add CGST @applicable on the date of bidding(***)

Total unit cost

NOTE :-

1. All the materails as per REC standard required to complete the line works as detailed above are to be supplied by the bidder for installation at site except transformer.

2. Bidder shall quote price for the above items as per the heads mentioned. Supply as well as erection prices of all the other accessories, assemblies, components, part etc associated with these items, not mentioned separately but required for completion of whole work & its commissioning.

3. The quantity break up for standatd condition of work is indicative only for the purpose of EOI quoting by the bidder. The actual quantity shall be as per site condition and accordingly payment shall be made after certification by Engineer In Charge.

4. * Taxable value of supply includes packing, forwarding charges, freight & insurance, loading & unloading charges but excluding of GST. ** Erection charges excluding of GST ***The rate of GST on the date of bidding shall be quoted by the Bidder

Page 40 of 51

ANNEXURE-XVII

EOI/ BGJY/ SOUITHCO UTILITY/ ASKA CIRCLE/ Partial or Full Turnkey/06/2018-19/Dt.05.09.2018

UG of DTR 100KVA, 11/0.4KV to 250KVA, 11/0.4KV Plinth Mounted S/S :- (Including Supply of Material)

Sl. No.

Item-Description Unit Qty. Unit

supply in Rs

Unit installation in Rs

Total unit

value (Supply

+ Installation) in Rs

Total Cost (Supply + Installation) of the

Item in Rs

1 2 3 4 5 6 7=5+6 8=4x7

1 kit kat fuse 400A No 6

2 Kit kat belting 50x50x6mm angle @ 4.5kg/mtr) total (3mtr)

Kg 14

3 Earthing support (coil type) No 2

4 G.I pipe earthing 40mm dia medium gauge 3mtr long

No 2

5 G.I Flat (25X6)mm 1.2/KG/Meter for earthing

Kg 54

6 MS nuts,bolts and washers Kg 5

7 Cost of star rated transformer 250KVA ,11/0.4KV

No 1

8 LT 3core PVC cable 185 sq.mm . Mtr 30

9 Sundries (almunimum binding Tap , insulating tap, Anti climing device , Danger Board etc) Climing

LS 1

10 Cost of plinth for S/s No 1

Total Price Per Ss 1

(in %)

Add SGST @applicable on the date of bidding(***)

Add CGST @applicable on the date of bidding(***)

Total unit cost

NOTE :-

1. All the materails as per REC standard required to complete the line works as detailed above are to be supplied by the bidder for installation at site except transformer.

2. Bidder shall quote price for the above items as per the heads mentioned. Supply as well as erection prices of all the other accessories, assemblies, components, part etc associated with these items, not mentioned separately but required for completion of whole work & its commissioning.

3. The quantity break up for standatd condition of work is indicative only for the purpose of EOI quoting by the bidder. The actual quantity shall be as per site condition and accordingly payment shall be made after certification by Engineer In Charge.

4. * Taxable value of supply includes packing, forwarding charges, freight & insurance, loading & unloading charges but excluding of GST. ** Erection charges excluding of GST ***The rate of GST on the date of bidding shall be quoted by the Bidder

Page 41 of 51

ANNEXURE-XVIII

EOI/ BGJY/ SOUITHCO UTILITY/ ASKA CIRCLE/ Partial or Full Turnkey/06/2018-19/Dt.05.09.2018

UG of DTR 250KVA, 11/0.4KV to 315KVA, 11/0.4KV Plinth Mounted S/S :- (Including Supply of Material)

Sl. No.

Item-Description Unit Qty. Unit

supply in Rs

Unit installatio

n in Rs

Total unit

value (Supply

+ Installation) in Rs

Total Cost (Supply + Installation) of the

Item in Rs

1 2 3 4 5 6 7=5+6 8=4x7

1 315KVA, 11/0.4KV Distribution Transformer

No 1

2 25 x 6mm (For Others) Kg 30

3 25 x 4mm (For Lighting Arrestor)

Kg 8

4 Earthing Device No 2

5 LT Distribution Box with Kit-kat fuse

No 1

6 3 1/2C LT PVC Cable Mtr 24

7 Material for masonary for earth pit

No 2

8 Char Coal and salt for earth pit

No 2

9 Sundries Ls 1

Total value PerSS 1

(in %)

Add SGST @applicable on the date of bidding(***)

Add CGST @applicable on the date of bidding(***)

Total unit cost

NOTE :-

1. All the materails as per REC standard required to complete the line works as detailed above are to be supplied by the bidder for installation at site except Transformer.

2. Bidder shall quote price for the above items as per the heads mentioned. Supply as well as erection prices of all the other accessories, assemblies, components, part etc associated with these items, not mentioned separately but required for completion of whole work & its commissioning.

3. The quantity break up for standatd condition of work is indicative only for the purpose of EOI quoting by the bidder. The actual quantity shall be as per site condition and accordingly payment shall be made after certification by Engineer In Charge.

4. * Taxable value of supply includes packing, forwarding charges, freight & insurance, loading & unloading charges but excluding of GST. ** Erection charges excluding of GST ***The rate of GST on the date of bidding shall be quoted by the Bidder

Page 42 of 51

ANNEXURE-XIX

EOI/ BGJY/ SOUITHCO UTILITY/ ASKA CIRCLE/ Partial or Full Turnkey/06/2018-19/Dt.05.09.2018

CONSTRUCTION OF LT LINE WITH AB CABLE (Including Supply of Material)

Sl. No

. Item-Description Unit Qty.

Unit supply in

Rs

Unit installation in Rs

Total unit

value (Supply + Installation) in Rs

Total Cost

(Supply +

Installation) of

the Item in Rs

1 2 3 4 5 6 7=5+6 8=4x7

1 8mtr. Long PSc pole Nos 25

2 L.T stay set complete Set 7

3 L.T stay insulator Nos 7

4 L.T stay clamp Pair 7

5 7/12 G.I. stay wire Kg 56

6 M.S Bolt Nut& washer Kg 14

7 3x35+1x25 mm2 A.B cable Km 1

8 Concreting material for stay anchor plate

Ls 7

9 padding and concreting materials for support

Ls 25

10 Suspension clamp I Hook Nos 21

11 Dead end clamp I hook Nos 4

12 strain fitting Nos 4

13 Sundries Nos 1

Total Price for construction of LT line with 3x50 + 1x35MM2 AB Cable, 3 phase (as breaked up above ) per KM

(in %)

Add SGST @applicable on the date of bidding(***)

Add CGST @applicable on the date of bidding(***)

Total unit cost

NOTE :-

1. All the materails as per REC standard required to complete the line works as detailed above are to be supplied by the bidder for installation at site except transformer.

2. Bidder shall quote price for the above items as per the heads mentioned. Supply as well as erection prices of all the other accessories, assemblies, components, part etc associated with these items, not mentioned separately but required for completion of whole work & its commissioning.

3. The quantity break up for standatd condition of work is indicative only for the purpose of EOI quoting by the bidder. The actual quantity shall be as per site condition and accordingly payment shall be made after certification by Engineer In Charge.

4. * Taxable value of supply includes packing, forwarding charges, freight & insurance, loading & unloading charges but excluding of GST. ** Erection charges excluding of GST ***The rate of GST on the date of bidding shall be quoted by the Bidder

Page 43 of 51

ANNEXURE-XX

EOI/ BGJY/ SOUITHCO UTILITY/ ASKA CIRCLE/ Partial or Full Turnkey/06/2018-19/Dt.05.09.2018

CONSTRUCTION OF LT LINE WITH AB CABLE (Including Supply of Material)

Sl. No.

Item-Description Unit Qty. Unit

supply in Rs

Unit installation in Rs

Total unit

value (Supply + Installation) in Rs

Total Cost

(Supply + Installati

on) of the Item

in Rs

1 2 3 4 5 6 7=5+6 8=4x7

1 8mtr. Long PSc pole Nos 25

2 L.T stay set complete Set 7

3 L.T stay insulator Nos 7

4 L.T stay clamp Pair 7

5 7/12 G.I. stay wire Kg 56

6 M.S Bolt Nut& washer Kg 14

7 3x50+1x35 mm2 A.B cable Km 1

8 Concreting material for stay anchor plate

Ls 7

9 padding and concreting materials for support

Ls 25

10 Suspension clamp I Hook Nos 21

11 Dead end clamp I hook Nos 4

12 strain fitting Nos 4

13 Sundries Nos 1

Total Price for construction of LT line with 3x50 + 1x35MM2 AB Cable, 3 phase (as breaked up above ) per KM

(in %)

Add SGST @applicable on the date of bidding(***)

Add CGST @applicable on the date of bidding(***)

Total unit cost

NOTE :-

1. All the materails as per REC Standard required to complete the line works as detailed above are to be supplied by the bidder for installation at site except transformer.

2. Bidder shall quote price for the above items as per the heads mentioned. Supply as well as erection prices of all the other accessories, assemblies, components, part etc associated with these items, not mentioned separately but required for completion of whole work & its commissioning.

3. The quantity break up for standatd condition of work is indicative only for the purpose of EOI quoting by the bidder. The actual quantity shall be as per site condition and accordingly payment shall be made after certification by Engineer In Charge.

4. * Taxable value of supply includes packing, forwarding charges, freight & insurance, loading & unloading charges but excluding of GST. ** Erection charges excluding of GST ***The rate of GST on the date of bidding shall be quoted by the Bidder

Page 44 of 51

EOI/ BGJY/ SOUITHCO UTILITY/ ASKA CIRCLE/ Partial or Full Turnkey/06/2018-19/Dt.05.09.2018

ABSTRACT OF PRICE SCHEDULE OF BALISIRA

Sl No

Description of work

Unit Quantity Total unit cost in Rs. Total value in Rs Remarks

1 2 3 4 5 6=4x5 7

1 Construction of LT line with 3x35+1x25mm2 AB Cable

Ckm 4

Annexure-XIX

2 Construction of 63KVA, 11/0.4KV DP mounted S/S

No 3

Annexure-XII

3 Construction of 100KVA, 11/0.4KV DP mounted S/S

No 7

Annexure-XIII

4 Up gradation of Existing DTR from 63KVA to 100KVA

No 4

Annexure-XVI

5 Up gradation of Existing DTR from 100KVA to 250KVA

No 3

Annexure-XVII

Grand total

Rupees in Words

Page 45 of 51

EOI/ BGJY/ SOUITHCO UTILITY/ ASKA CIRCLE/ Partial or Full Turnkey/06/2018-19/Dt.05.09.2018

ABSTRACT OF PRICE SCHEDULE OF NUAGAON-II

Sl No Description of work Unit Quantity Total unit cost in Rs.

Total value in Rs

Remarks

1 2 3 4 5 6=4x5 7

1 Construction of LT line with 3x35+1x25mm2 AB Cable

Ckm 2.90 Annexure-XIX

2 Construction of 25KVA, 11/0.4KV DP mounted S/S

No 1 Annexure-XI

3 Construction of 63KVA, 11/0.4KV DP mounted S/S

No 3 Annexure-XII

4 Up gradation of Existing DTR from 25KVA to 63KVA

No 2 Annexure-XIV

5 Up gradation of Existing DTR from 63KVA to 100KVA

No 5 Annexure-XVI

6 Up gradation of Existing DTR from 100KVA to 250KVA

No 5 Annexure-XVII

Grand total

Rupees in Words

Page 46 of 51

EOI/ BGJY/ SOUITHCO UTILITY/ ASKA CIRCLE/ Partial or Full Turnkey/06/2018-19/Dt.05.09.2018

ABSTRACT OF PRICE SCHEDULE of Balipadar

Sl No

Description of work Unit Quantity Total unit cost in Rs.

Total value in Rs

Remarks

1 2 3 4 5 6=4x5 7

1 Construction of 11KV lines with 55mm2 AAA Conductor

Ckm 3.80 Annexure-IX

2 Construction of LT line with 3x50+1x35mm2 AB Cable

Ckm 6.40 Annexure-XX

3 Construction of 25KVA, 11/0.4KV DP mounted S/S

No 3 Annexure-XI

4 Construction of 63KVA, 11/0.4KV DP mounted S/S

No 6 Annexure-XII

5 Construction of 100KVA, 11/0.4KV DP mounted S/S

No 7 Annexure-XIII

6 Up gradation of Existing DTR from 63KVA to 100KVA

No 2 Annexure-XVI

Grand total

Rupees in Words

Page 47 of 51

EOI/ BGJY/ SOUITHCO UTILITY/ ASKA CIRCLE/ Partial or Full Turnkey/06/2018-19/Dt.05.09.2018

ABSTRACT OF PRICE SCHEDULE OF BUDHAMBA

Sl No

Description of work Unit Quantity Total unit cost in

Rs. Total value in Rs Remarks

1 2 3 4 5 6=4x5 7

1 Construction of 11KV lines with 55mm2 AAA Conductor

Ckm 1.25 Annexure-IX

2 Construction of LT line with 3x50+1x35mm2 AB Cable

Ckm 13.65 Annexure-XX

3 Construction of 25KVA, 11/0.4KV DP mounted S/S

No 3 Annexure-XI

4 Construction of 63KVA, 11/0.4KV DP mounted S/S

No 5 Annexure-XII

5 Construction of 100KVA, 11/0.4KV DP mounted S/S

No 3 Annexure-XIII

6 Up gradation of Existing DTR from 25KVA to 63KVA

No 1 Annexure-XIV

Grand total

Rupees in Words

Page 48 of 51

EOI/ BGJY/ SOUITHCO UTILITY/ ASKA CIRCLE/ Partial or Full Turnkey/06/2018-19/Dt.05.09.2018

ABSTRACT OF PRICE SCHEDULE OF KABISURYANAGAR

Sl No

Description of work Unit Quantity Total unit cost

in Rs. Total value in

Rs Remarks

1 2 3 4 5 6=4x5 7

1 Construction of 11KV lines with 55mm2 AAA Conductor

Ckm 3.70 Annexure-IX

2 Construction of LT line with 3x50+1x35mm2 AB Cable

Ckm 27.56 Annexure-XX

3 Construction of 63KVA, 11/0.4KV DP mounted S/S

No 5 Annexure-XII

4 Construction of 100KVA, 11/0.4KV DP mounted S/S

No 12 Annexure-XIII

5 Up gradation of Existing DTR from 25KVA to 63KVA

No 1 Annexure-XIV

6 Up gradation of Existing DTR from 63KVA to 100KVA

No 6 Annexure-XVI

7 Up gradation of Existing DTR from 250KVA to 315KVA

No 6 Annexure-XVIII

Grand total

Rupees in Words

Page 49 of 51

EOI/ BGJY/ SOUITHCO UTILITY/ ASKA CIRCLE/ Partial or Full Turnkey/06/2018-19/Dt.05.09.2018

ABSTRACT OF PRICE SCHEDULE OF DIGAPAHANDI

Sl No

Description of work Unit Quantity Total unit cost

in Rs. Total value in Rs Remarks

1 2 3 4 5 6=4x5 7

1 Construction of 11KV lines with 55mm2 AAA Conductor

Ckm 2.70

Annexure-IX

2 Convertion of existing 11KV line from 2Phase 2W to 3Phase 3W

Ckm 3.50

Annexure-X

3 Construction of LT line with 3x50+1x35mm2 AB Cable

Ckm 7.30

Annexure-XX

4 Construction of LT line with 3x35+1x25mm2 AB Cable

Ckm 1.50

Annexure-XIX

5 Construction of 25KVA, 11/0.4KV DP mounted S/S

No 6

Annexure-XI

6 Construction of 100KVA, 11/0.4KV DP mounted S/S

No 5

Annexure-XIII

7 Up gradation of Existing DTR from 25KVA to 100KVA

No 3

Annexure-XV

8 Up gradation of Existing DTR from 63KVA to 100KVA

No 3

Annexure-XVI

9 Up gradation of Existing DTR from 100KVA to 250KVA

No 2 Annexure-

XVII

Grand total

Rupees in Words

Page 50 of 51

EOI/ BGJY/ SOUITHCO UTILITY/ ASKA CIRCLE/ Partial or Full Turnkey/06/2018-19/Dt.05.09.2018

ABSTRACT OF PRICE SCHEDULE OF NUAPADA

Sl No

Description of work Unit Quantity Total unit cost in Rs.

Total value in Rs

Remarks

1 2 3 4 5 6=4x5 7

1 Construction of 11KV lines

with 55mm2 AAA Conductor Ckm 8.25

Annexure-IX

2 Conversion of existing 11KV

line from 2Phase 2W to 3Phase 3W

Ckm 3.30

Annexure-X

3 Construction of LT line with 3x50+1x35mm2 AB Cable

Ckm 0.85

Annexure-XX

4 Construction of LT line with 3x35+1x25mm2 AB Cable

Ckm 1.40

Annexure-XIX

5 Construction of 25KVA,

11/0.4KV DP mounted S/S No 10

Annexure-XI

6 Up gradation of Existing DTR

from 63KVA to 100KVA No 2

Annexure-XVI

Grand total

Rupees in Words

Page 51 of 51

EOI/ BGJY/ SOUITHCO UTILITY/ ASKA CIRCLE/ Partial or Full Turnkey/06/2018-19/Dt.05.09.2018

ABSTRACT OF PRICE SCHEDULE OF SURANGI

Sl No

Description of work Unit Quantity Total unit cost

in Rs. Total value in Rs Remarks

1 2 3 4 5 6=4x5 7

1 Construction of 11KV

lines with 55mm2 AAA Conductor

Ckm 1.50

Annexure-IX

2 Construction of LT line

with 3x50+1x35mm2 AB Cable

Ckm 1.00

Annexure-XX

3 Construction of LT line

with 3x35+1x25mm2 AB Cable

Ckm 0.10

Annexure-XIX

4 Construction of 25KVA, 11/0.4KV DP mounted

S/S No 1

Annexure-XI

5 Construction of 63KVA, 11/0.4KV DP mounted

S/S No 1

Annexure-XII

6 Construction of

100KVA, 11/0.4KV DP mounted S/S

No 1

Annexure-XIII

Grand total

Rupees in Words