1 22-03-27 These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer Science and Engineering, University of Mälardalen, Västerås, Sweden and at the Faculty of Electrical Engineering and Computing, University of Zagreb, Croatia (year 2012/2013). For all other purposes, authors’ written permission is needed! The purpose of these materials is to help students in better understanding of lectures in DSD and not their replacement! NOTICE!

description

NOTICE!. - PowerPoint PPT Presentation

Transcript of NOTICE!

123-04-19

• These materials are prepared only for the students enrolled in

the course Distributed Software Development (DSD) at the

Department of Computer Science and Engineering,

University of Mälardalen, Västerås, Sweden and at the Faculty

of Electrical Engineering and Computing, University of Zagreb,

Croatia (year 2012/2013).

• For all other purposes, authors’ written permission is needed!

• The purpose of these materials is to help students in better

understanding of lectures in DSD and not their replacement!

NOTICE!

223-04-19

Distributed Software Development

Final Presentation

423-04-19

523-04-19

Project Schedule

Deliverables Status

– Database– Data access

layer

623-04-19

– Registration / log in system

– Beta information gethering

– Last deliverables

– Postdocs recommendation system

– Additional data sources

Faster Slower Dropped

Fullfilled Requirements

1) Browsing universities by geographical location

2) Viewing university and city information

3) Getting suggestion based on user preferences

4) User registration and login

5) Viewing and editing user profile

723-04-19

Fullfiled Requirements

6) Viewing universities based on people, publications, keywords

7) Exploring map of university location

8) Recommendation system

9) Commenting university and city information

10)Viewing and editing user page

823-04-19

Fullfiled Requirements

923-04-19

Following initial plan

• Minor deviations from the plan– Small delays– Earlier adding database– Used a different data source than planned

1023-04-19

System Interface

1123-04-19

API

ASP.net PAGE METHODS API

API

HTML PARSING

GO

OG

LE API

GOOGLE API

GO

OG

LE A

PI

API

• Mail

• Skype

• Planbox

• Face to face

Communication

1223-04-19

Work division

• Good division– Server: Croatian team– Client: Italian team

• Division problems:– Every team member did not have an job

assignement 100% of the time– Sometimes the team was not aware of the

status of individual team members

1323-04-19

Overview

• All things considered project done very well

• Excellent project leader

• Work dedication was constant from the beginning

• World is a safer place

1423-04-19

Overview

• Sometimes difficult communication

• In retrospect some work could have been divided better, to team members which were more compatible for the job

• In some occasions, tighter deadlines and more control over work done by a team member would have been beneficial

1523-04-19

Live Demonstration

1623-04-19

Questions

1723-04-19