Notebook Check Complete the drawing Individual House over the next two days. The drawing is due at...

10
Notebook Check Complete the drawing “Individual House” over the next two days. The drawing is due at the end of the period Tuesday, May 1. “Two Point House Group” will be returned with the Visual Art 1 Individual Performance Assessment Rubric. All drawings are “Eligible for Recovery”.

Transcript of Notebook Check Complete the drawing Individual House over the next two days. The drawing is due at...

Page 1: Notebook Check Complete the drawing Individual House over the next two days. The drawing is due at the end of the period Tuesday, May 1. Two Point House.

Notebook Check

Complete the drawing “Individual House” over the next two days. The drawing is due at the end of the period Tuesday, May 1.

“Two Point House Group” will be returned with the Visual Art 1 Individual Performance Assessment Rubric. All drawings are “Eligible for Recovery”.

Page 2: Notebook Check Complete the drawing Individual House over the next two days. The drawing is due at the end of the period Tuesday, May 1. Two Point House.

“Eligible for Recovery”- Drawings are to be completed or corrected at home or students may come in to A113 during their lunch/free period.

Students may use the resource www.chopticonapah.com (Visual Art I tab) for Power Points used in class to assist them in the drawing.

Students may also use internet search engines to assist them in the drawing. When using search engines suggested keywords include:

“Two point perspective”

“Two point perspective drawing”

“Two point perspective Houses”

“Two point perspective exercises”

Page 3: Notebook Check Complete the drawing Individual House over the next two days. The drawing is due at the end of the period Tuesday, May 1. Two Point House.

Select one of the two drawing completed in class over the last week and a half to add “Finishing Touches”To complete the drawing properly;• Add attached structures to the main building such as room, porches, a garage, patios, etc.• Add shutters and siding• Add stairs, paths and/or sidewalks• Add detail including tiles to the roof.• Color and/or shade.• Plants, trees and flowers to the garden.

Page 4: Notebook Check Complete the drawing Individual House over the next two days. The drawing is due at the end of the period Tuesday, May 1. Two Point House.
Page 5: Notebook Check Complete the drawing Individual House over the next two days. The drawing is due at the end of the period Tuesday, May 1. Two Point House.
Page 6: Notebook Check Complete the drawing Individual House over the next two days. The drawing is due at the end of the period Tuesday, May 1. Two Point House.
Page 7: Notebook Check Complete the drawing Individual House over the next two days. The drawing is due at the end of the period Tuesday, May 1. Two Point House.
Page 8: Notebook Check Complete the drawing Individual House over the next two days. The drawing is due at the end of the period Tuesday, May 1. Two Point House.

Tuesday May 1, 2012 Individual House Drawings due.

Wednesday May 2, 2012 Begin Finishing touches on one of your Houses in Perspective.

Thursday May 3, 2012End of Interim Period

Friday May 4, 2012Finishing touches due on selected two point perspective house

Monday May 7, 2012 Recovery due for Two Point House (together) assignment

Monday May 14, 2012 Interim Distribution

Friday May 25, 2012 Final day to turn in all late work or make up work

Friday June 8, 2012

Page 9: Notebook Check Complete the drawing Individual House over the next two days. The drawing is due at the end of the period Tuesday, May 1. Two Point House.
Page 10: Notebook Check Complete the drawing Individual House over the next two days. The drawing is due at the end of the period Tuesday, May 1. Two Point House.