    Project:

    Assistane to Petroleum Setor-Phase IV

    Cooperating institution:Instituto Niaraguense de Energia (INE)

    INE is the state organization whih is responsible or regulations, norms,

    ontrol and taxation o the eletriity and hydroarbon setors. The main

    ooperation between the INE and the Norwegian Petroleum Diretorate (NPD)

    is onneted to the Department o Hydroarbons in INE (Direion General de

    Hidroarburos, DGH), whih is regulating both the upstream and downstream

    ativities. By 1. Marh 2007, the hydroarbons division o INE has been trans-

    erred to the Ministry o Mines and Energy, and Vie Minister Lorena Lanza is

    in harge o the division.

    Goal:to ontribute to the eonomi and soial development and poverty redution

    by identiying and developing new felds in the use o the ountrys natural

    resoures,

    Objective: to ontribute to seure an environmentally sound exploration

    and possible exploitation o petroleum resoures by reating apaities,

    at Niaraguas government level.

    Project period: 2005 - 2007

    Total Budget: NOK 2.25 mill

    cOUNTRY FAcTS:Ofcial Name:

    Republi of Niaragua

    Capital:

    Managua

    Chie o state:

    President Daniel Ortega

    Saavedra (sine January 2007).

    The president is both hief of

    state and head of government.

    Population:

    5 570 129 (2006)

    Petroleum sector, key fgures:

    Average oil prodution: 0

    Annual gas prodution: 0

    Organisation o the sector:

    In 2007, the former INE has been

    transferred to the Ministry of

    Energy and Mines (cNE), whih

    is regulating the hydroarbons

    setor

  • 8/14/2019 Norwegian Oil for development in Nicaragua

    2/2

    Nowgan Pou Dcoa

    O i l f O r D e v e l O P m e N t

    2006-2007

    47

    The programmeSpecifc objectives are:

    Updating o the petroleum database Implementation o the monitoring system Analysis o new seismi data Updating and improving o the national

    ontingeny plan or emergenies related to theexploration and exploitation ativities

    Training to INEs sta through seminars,work-shops, and ourses abroad

    New promotional ampaignMajor risks:

    There is the possibility, but with a low probability,o external risks related to politial unrest.

    There is a low probability or institutional risks,suh as loss o qualifed sta assigned to the

    Programme and aeted reurrent osts as a result

    o budget limitations ater the end o theGrant period.

    Contact:

    cNE: Li. Lorena Lanza, Vie Minister, Ministry

    o Energy and Mines, [email protected]

    Ing. Veronia Artiles, Head o Petroleum

    Inormation Department, [email protected]

    NPD: Mr. Fridtjo Riis, Projet coordinator,

    [email protected]

    cooperating Institution

    NORAD

    Brie history o the projetThe institutional ooperation between the INE and the

    NPD was initiated in 1989, as a part o support to the

    petroleum setor. No petroleum exploration had taken

    plae in Niaragua sine the 1970s. In the frst phase o

    the programme (1989-1995), it was prioritized to organ-

    ize and enlarge the existing data base and to evaluate

    the petroleum potential in order to prepare or renewed

    exploration. The programme has been prolonged in

    order to ontinue the institutional ooperation during

    the liensing round, negotiation phase and the ollowing

    up o the new lienes. The liensing round is based onthe reent Petroleum At, whih was elaborated with the

    support o the Inter Amerian Development Bank, and

    approved in 1998.

    The main speif objetive o the phase III o the

    ooperation was to assist INE in their frst liensing

    round in 2003 and the negotiation o exploration and

    prodution lienes in 2004-2005. INE entered into

    negotiations with 4 ompanies. In 2005 one liense

    ontrat has been signed with one ompany, Oklahoma-

    Niaragua SA (Indoklanisa), in the onshore Paif.In 2006 urther three ontrats were signed with the

    ompanies MKJ and Infnity or 4 areas in the caribbean

    Margin. The Indoklanisa onshore onession is now

    operated by the canadian ompany Norwood, whih

    started a drilling ampaign in the end o 2006. An oil

    and gas disovery was reported in February 2007.

    The situation o the onessions in the caribbean is

    presently being disussed by the entral government

    and the loal authorities o the caribbean side, and

    there has been no exploration ativity there.

    The urrent programme is a prolongation until 2007o the institutional ooperation between INE and NPD.

    The ooperation ontinues with tehnial assistane and

    training. The ontrat or the ooperation will be signed

    in 2007

    Ativities in 2006In 2006, there was no NPD ativity o signifane, sine

    the politial situation prior to the eletions has not been

    lear. NPD has been in ontat with INE and with the

    embassy to ollow the proess o establishing the new

    phase IV o the programme.

    Costs 2006

    No osts to be reported.

    Plans 2007The Niaragua projet is awaiting the signature o the

    ontrat between cNE and NORAD. It is expeted that

    the projet will start up in the end o the seond quarter,

    and that it will involve training, assistane on updating

    o the data base systems, assistane in monitoring o the

    exploration ativity and setting up a ontingeny plan.

    It is expeted that the projet will need approximately 4

    weeks o assistane. A urther delay annot be ruled out.