Transcript of Norton, MA | 2017 Annual Report | NPDES Phase II Small MS4 … · 2017-06-05 · De_pt. _____...
Municipality/Organization: NORTON, MA
EPA NPDES Permit Number: NAR 041145
MaDEP Transmittal Number: W-
Annual Report Number Year 14& Reporting Period: April 1 2016 - March 31, 2017
NPDES PII Small MS4 General PermitAnnual Report
Part I. General Information
Contact Person: Keith Silver Title: Highway Superintendent
Telephone#: 508-285-0237 Email: [email protected]
Certification:
I certify under penalty of law that this document and all attachments were prepared under mydirection or supervision in accordance with a system designed to assure that qualified personnelproperly gather and evaluate the information submitted. Based on my inquiry of the person orpersons who manage the system, or those persons directly responsible for gathering theinformation, the infonnation submitted is, to the best ofmy knowledge and belief, true, accurate,and complete. I am aware that there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowing violations.
Signature:
Printed Name: Michael Yunits
Title: Town Manager
Date: 3 - 30 ~1.017
Part III. Summary of Minimum Control Measures
1. Public Education and Outreach
--- ---- -- -------- ------ - ---- --- ---- -- --- -- --- ----- ----- - ------- ---- ----------- ----
---- ---- -------- ----- ------- ------ --- -- ---- --- ------ ---- -- --- --- ----- ------ ----- --
---- --- -- --------- ----- ----- --- ---- -- ---- -- ------ --- --- - --------- -- -- ---- ---------
----- -- ------ -- -- ---- ------ ------ -- -- ---- --- - --- ----- --- ------ --------------------
BMP BMP Description Responsible Measurable Goal(s) Progress on Goal(s) Planned Activities ID # Dcpt./Person Permit Year 14 Permit Year 14Name (Reliance on non-municipal partners
indicated, if any) l a Non-Point Source Highway Dept. Non-point source posters posted in all Continuing to post posters
----- ---- --~<?~!~~~ _iP- p_~~)t~~1-~g~:·_ - ---------------- --- ------------------------ --public buildings
Revised
l b Develop pamphlet Water & Sewer Pamphlets are distributed via mailings Will continue with mailings----- --- - -- -- ------------- -- ---------
De_pt._____________Revised ----- ---------- --- --------
le Air Storm water Highway Dept Messages aired on local cable channel Will continue with messages Message on local cablechannel
Revised
Post storm water Highway Dept All Storm water information posted to Updates are done when necessaryId protection infonnation Town website to Town website
Revised
Revised
Revised
1a. Additions
3
2. Public Involvement and Participation
-------- ---- ----- --- --- ---------- --- - ------ --- --- ------ - -- -- -- ----- ---- --- ----- -- -
- - - - - -- - ---- ----------- ----------- -- - --- ----- -- --------- ----- -- ------ ---- --- ------
----- --- ------ ------- -- --- ------- -- -- ------ ----- -------- -- ---- - ------ - --- ----- - -- -
------- ------ ----------- --- --- ----- -- -------- --- -------- ---- ------ ----------- -----
BMP BMP Description Responsible Measurable Goal(s) Progress on Goal(s) Planned Activities ID# Dept./Pcrson Permit Year 14 Permit Year 14Name (Reliance on non-municipal partnersindicated, if any)
Establish St01m water Selectmen Meeting of SAC to2a . Advisory Committee__ ___
Key Town employees make up Meeting ofSAC is held bi-annually-- --- ---- -~~t~s.~~J~_~J:~!l~l!~!l_x _. CommitteeRevised -- --- -------- -----
2b Establish Storm water Highway Dept Hotline all set up Hotline in place and available Storm water hotline will stay in placeHotline Revised
2c Co-sponsor stream Highway Dept Spring Ammal Stream Spring annual stream clean up day Highway Dept. and Conservationcleanup day w/local cleanup day done. Dept cleans streams every year.-- ---- --- . organizations ---- -· -. --- - -- --- ----- --- --- --- --- --- --- ----- ---- ------- -
Conservation Dept. has canoe trips to Revised Public also assists in this cleanup.clean steams and rivers.
Revised
Revised
Revised
2a. Additions
B 4
3. Illicit Discharge Detection and Elimination
-
-
-
-
-------- --- ------------ ------------- ---- ------- ------ -- -- -- ---- ----- -- ------ ---- -
- ------- ----- ----- ----- -- ----- ----- - ------------------- --------- -- ---------- ---- -
-- ------ ---------------------------- ----- ------ -- --- --- ---------- --------- -------
--- ----- ----------- ---- ------------- ------------------- --------- ------ ---- -- -----
BMP BMP Description Responsible Measurable Goal(s) Progress on Goal(s) - Planned Activities ID # Dept./Person Permit Year 14 Permit Year 14Name (Reliance on non-municipal partners indicated if any)
Illicit discharge by law Storm water Adopted by Town Illicit discharge by-law adopted Updated as needed-3a --- ----__8:~9-~9.0.P.~~9-~Y.T.~~- __ . Committee
Revised ------------------- -------------------------
3b TDDE Plan Adopted Storm water Town IDDE plan An IDDE plan has been reviewed AdoptedCommittee
Revised
3c Map outfalls, receiving Highway Dept Field surveys done by GPS mapping in effect Outfalls, receiving water, storm drain waters, storm drain GPS
-- ----- -_system ___ ___ __________ __ _
system updated frequently Revised ----------- ------- - -------------------------
Develop public Highway Dept Develop public Public education brochme completed Brochure dispersed3d education brochure education brochureRevised
Town collection of Highway Dept Collection hours Motor oil and antifreeze collected the Practice continues3e motor oil and anti- provided twice per 2nd & 4th Saturday of each month. freeze month
Revised
evised
-
-
R
3a. Additions
B 5
-- ---------- --- --- --------
4. Construction Site Stormwater Runoff Control
BMP BMP Description Responsible Measurable Goal(s) Progress on Goal(s) - Planned Activities ID # Dept./Person Permit Year 14 Permit Year 14Name (Reliance on non-municipal partnersindicated, if any)
Developed new by-laws Planning/Con. adopted A new by-law was developed for and is Procedure continuingfor construction site Com. implemented for construction runoffrunoff --------- -- -- ---------- -- ---------- -- --- ---- ------------ -------- --- --------- --- ---Revised
Developed site review Planning/Con. done Site review protocol is being followed Procedure continuing_procedures ______ _______ .. Com.------ --- -- -- -- --- ---------- -- --------- --- -- -- ----- --- by both departmentsRevised
Site inspection protocol PJanning/Con. adopted Site inspection is being followed by Procedure continuingCom. both departments--- ---- ----- ---- -- -- -- -- -- -- -- -- ---- - --- --- -- - -- --- --- -- ------ ---- ---- ------- - -- - -Revised
Hotline for public Planning Dept established Hotline set up for public complaints Procedure continuing-- -- - ---- __C_(?l~p!~fr:_i!~_____ __ ________ ---- ---------- -- --- ------- - ---------- -- -----Revised
------ -- --- ----- -- --- ---- --- -- ------ - -------- --------- -- --- --- -- ---- --- --- - ----- - -Revised
------- -- --- ------- ------ ------ ------ ----------- ----- ---Revised
4a. Additions
El 6
5. Post-Construction Stormwater Management in New Development and Redevelopment
BMP BMP Description Responsible Measmable Goal(s) Progress on Goal(s) Planned Activities ID # Dept./Person Permit Year 14 Permit Year 14Name (Reliance on non-municipal partners
indicated, if any)Developed post Planning Dept Site inspection Site inspection protocol drafted Continuing procedures5a construction inspection pro tocol drafted
--- ----- -_protocol____ ____ ___ _____ __
-- -- ---- ---- ------- ---- -- ------ ------ -- -----Revised
Developed new by laws Planning Dept P resent draft by Jaw at By-laws in place for post constmction Continuing to follow this5b for post construction Town meeting for controlscontrols adoption ______ ____ __ __ __- ------- - ----- --- --- -- -- -- ----- ---- -- -- ----- -- -- -- - --- --Revised
5c Required long tenn Planning /Con. Established long term Long term O&M procedures Continuing to follow this---- --- --
_O&M }}!ans for BMP's __ Com O&M procedures __ ___ __ established-- ---- ----- ------ -Revised
Reviewed planning & Planning Dept. Planning and zoning Planning and zoning for non-stmctural Continuing to follow this5d zoning for non- guidelines reviewed BMP's have been reviewed and followstructural BMP'-- --- --- --- ---- ---- ---- ---- BMP
Revised s--- ------ - ---- - ------ --- -- --- --- --- -- --- --- ----- -- ----
Fact sheet of Planning/Con. Distribute fact sheet to A fact sheet of BMP's is dispersed to Continuing to follow this5e recommended BMP's Com develop ers _____ __ __ ___ __ developers-- -- ----- --- ---------------- -------- -- --- --------------Revised
--- ------ ----- ---- ----- ------ -- ------ -- ----- ----- ----- -- -------- -- --- ----- ---- --- -Revised
5a. Additions
B 7
6. Pollution Prevention and Good Housekeeping in Municipal Operations
BMP BMP Description Responsible Measurable Goal(s) Progress on Goal(s) Planned Activities ID # Dept.IPerson Permit Year 14 Permit Year 14Name (Reliance on non-municipal partners
indicated, if any)Employee training Highway Dept. Conducting annual Annual training being conducted Done throughout each year
--6a------- _R~<?g!·?~---- ---- -- --- ----- ------------ --- ---- -~1?.J?!<?Y~~ !~~i~~~g_ _____ _Revised
Vehicle Highway Dept. Regularly conducting All vehicles inspected and maintained Will stay in effect6b _maintenance/inspection __--------- --------------- ---- .R~<?g!?!!l_---------------- on a daily basis Revised
6c Park vehicles in Highway Dept. Vehicles parked in All vehicles are parked in garage bays Will remain in garagecovered area covered area--- ------ ------------------ --- ---- - -- ----- ------- -- ----- -- -- ---- -- --- --- --- ---- ---Revised
Keep spill prevention Highway Dept. Spill prevention kits Still prevention kits are on site at all Will remain on site at all times6d kits on site on site times----- ---- -- -------- -- ------ ---- ----- - ---- -- ------ ---- -- - --------- -- ---- -- ------- --Revised
.Stockpile prevention Highway Dept. Keep sand and salt in All sand and salt are stored in a shed Will remain in sheds6e shed --- ------ --- --------------- -- -------- ---- --- ------ -- ---- --- -- --------- --- ---------Revised
-- -- - - ----- --- ---------- -- ---- ---- --- --- ---------------- --------------- -----------Revised
6a. Additions
EJ 8
7. BMPs for Meeting Total Maximum Daily Load (TMDL) Waste Load Allocations (WLA) <<ifapplicable>>
BMP I BMP Description Responsible Measurable Goal(s) Progress on Goal(s) Planned Activities ID# Dept./Pcrson Permit Year 14 Permit Year 14Name (Reliance on non-municipal partners indicated1 if any)
Revised
Revised
Revised
Revised
Revised
Revised
7a. Additions
B7b. WLA Assessment
9
Part IV. Summary of Information Collected and Analyzed
Part V. Program Outputs & Accomplishments (OPTIONAL)
Programmatic
Stormwater management position created/staffed y(y/n) Annual program budget/expenditures ($) No budget
Education, Involvement, and Training
Estimated number ofresidents reached by education program(s) (#or%) 95%Stonnwater management committee established (yin) yStream teams established or supported (# or y/n) NShoreline clean-up participation or quantity of shoreline miles cleaned (yi n or mi.)Household Hazardous Waste Collection Days
• days sponsored (#) 24• community participation (%)• material collected (tons or gal)
School curricula implemented (y/n) N
10
Legal/Regulatory
In Place Prior to Under
R Phase II . Drafted AdoptedRegulatory Mechanism Status (indicate with "X")
• Illicit Discharge Detection & Elimination
• Erosion & Sediment Control
• Post-Development Stonnwater Management Accompanying Regulation Status (indicate with "X")
• Illicit Discharge Detection & Elimination• Erosion & Sediment Control• Post-Development Stormwater Management
Mapping and Illicit Discharges
Outfall mapping complete (%) 100%Estimated or actual number of outfalls (#) 107System-Wide mapping complete (%) 100%Mapping method(s)
GPS• Paper/Mylar PAPER (%) 100%• CADD (%)• GIS purchased $15,000 OPS TREMBLE SYSTEM (%) 80
Outfalls inspected/screened (# or%) 100%Illicit discharges identified (#) 100%Illicit connections removed (# )
(est. gpd)% of population on sewer (%) 12%% of population on septic systems (%) 88%
11
Construction
Number of construction starts (> I-acre) (#) Estimated percentage of construction starts adequately regulated for erosion and sediment control (%) 100Site inspections completed (# or%) 100Tickets/Stop work orders issued (# or%)Fines collected (# and $)Complaints/concerns received from public (#) 30
Post-Development Stormwater Management
Estimated percentage of development/redevelopment projects adequately regulated for post (%)construction stormwater controlSite inspections completed
(#or%)Estimated volume of stormwater recharged (gpy)
Operations and Maintenance
Average frequency of catch basin cleaning (non-commercial/non-arterial streets) (times/yr) 2Average frequency of catch basin cleaning (commercial/arterial or other critical streets) (times/yr) 4Total number of structures cleaned (#) 96%Storm drain cleaned (LF or mi.) 80%Qty. of screenings/debris removed from stmm sewer infrastructure (lbs. or tons) 150Disposal or use of sweepings (landfill, POTW, compost, recycle for sand, beneficial use, etc.) CompostCost of screenings disposal ($)
12
Average frequency of street sweeping ( commercial/arterial or other critical streets) (times/yr) Spring-fallQty. of sand/debris collected by sweeping (lbs. or tons) 800 TONSDisposal of sweepings (landfill, POTW, compost, beneficial use, etc.) (location) CompostCost of sweepings disposal ($)Vacuum street sweepers purchased/leased (#) purchasedVacuum street sweepers specified in contracts (y/n) y
Reduction in application on public land of: ("N/A"= never used; "l00%" = elimination)• Fertilizers (lbs. or%) n/a• Herbicides (lbs. or%) n/a• Pesticides (lbs. or%) n/a
Anti-/De-Icing products and ratios %NaCl ¾CaCh % MgClz 20% %CMA ¾Kac %KC1 % Sand
Pre-wetting techniques utilized (y/n) yManual control spreaders used (yin) yAutomatic or Zero-velocity spreaders used (y/n) NEstimated net reduction in typical year salt application (lbs. or%) -75% Salt pile(s) covered in storage shed(s) (y/n) yStorage shed(s) in design or under construction (y/n) y